ACHR News
search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
ACHR News
  • NEWS
    • Breaking News
    • New HVAC Products
    • Featured Products
    • Manufacturer Reports
    • HVAC Data
    • Legislation
    • ACHR NEWS Centennial
  • RESIDENTIAL
    • Air Conditioners
    • Furnaces
    • Residential Heat Pumps
    • Ductless
    • Residential IAQ
    • Testing, Monitoring, Tools
    • Components & Accessories
  • COMMERCIAL
    • Air Handlers
    • Rooftop Units
    • Chillers and Cooling Towers
    • Commercial Heat Pumps
    • Boilers and Hydronics
    • VRF/Ductless
    • Commercial IAQ
  • REFRIGERATION
    • Refrigerants
    • Refrigerant Regulations
    • Leak Management
  • CONTRACTOR PRO
    • Geothermal
    • Homeowner Study
    • VRF and VRV Ductless
    • Unitary Trends
  • EDUCATION
    • Training and Education
    • Business Management
    • Service and Maintenance
    • Continuing Education
    • Market Research >
      • HVAC Brand Awareness Report
      • VRV, VRF, VRVZ Report
      • Unitary Trends Report
      • Water Heat Professionals Report
    • Webinars
    • Sponsor Insights
    • eProducts Info
    • White Papers
  • EVENTS
    • HVAC Contractor Forum
    • Industry Events and Webinars
  • MEDIA
    • Videos
    • AHR Expo 2025 Videos
    • Podcasts >
      • ACHR News Podcast
      • HARDI Podcasts
      • AHR Expo Podcasts
      • ACCA Podcasts
    • Interactive Spotlights
    • Quizzes
    • eBooks
    • HVAC Talkback
  • HVAC GROUP
    • ACHR NEWS >
      • Current Issue
      • Digital Edition
      • Subscribe
    • Distribution Trends
    • SNIPS NEWS >
      • Join SNIPS NEWS
    • Engineered Systems News >
      • Join ES News
    • HVACR Directory
    • Contests
    • Newsletters
    • Contact
    • Advertise
    • My Account
Manufacturer Reports

Custom Packaged Rooftop Systems Contribute to LEED Gold

Mammoth Rooftop Systems Fill the Bill for Delta Dental

December 8, 2014

Reliability, energy efficiency, and an integrated, all-in-one solution topped the list of HVAC requirements for major renovation and new construction at Delta Dental of Michigan’s 59-acre headquarters campus in Okemos, Michigan. The company’s goal was to grow the size of its headquarters in an environmentally conscious manner. The result is a facility that is energy efficient, filters in natural light, and enhances the work environment for Delta Dental employees.

Major Renovation and a New Addition

To meet its goals, the campus was expanded to 300,000 square feet. The interior of the company’s existing headquarters building was gutted and refurbished. The renovated, four-story, 160,000-square-foot facility now includes a 40,000-square-foot expansion featuring adjoining wings and a two-story glass lobby. The construction management team at Walbridge was able to keep extensive demolition waste out of landfills and reuse the building frame.

A new 100,000-square-foot building was constructed and connects to the expanded headquarters building by skyway and tunnel. The new building, at four stories, includes open office space, executive offices, a glass-enclosed boardroom and a cafetorium — the building’s signature feature — overlooking an enlarged and restored pond.

The master plan engineering team at Albert Kahn Associates Inc. chose Mammoth custom-packaged rooftop systems to meet the HVAC requirements for both the major building renovation and the adjoining new building. Scott Kemp, P.E., mechanical engineer with Albert Kahn Associates, led the mechanical design of the HVAC systems.

According to Kemp, Mammoth custom-packaged DX (direct expansion) systems were selected to support the project goal of earning the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED®) Gold certification for New Construction. “The mechanical systems had to provide excellent, energy-efficient operation. The systems also had to be effective for both the renovation and the new-construction portions of the project.”

Mammoth DX systems met the goals to provide efficient mechanical equipment operation. Installation advantages to the owner included single sourcing and keeping most of the HVAC equipment out of the buildings and on the roof.

“We wanted to take advantage of the factory labor over a field-built installation to save time and improve quality,” noted Kemp. “Sole-source responsibility for the major equipment and for the mechanical room installation was also an advantage.”

Looking for quick answers on air conditioning, heating and refrigeration topics? Try Ask ACHR NEWS, our new smart AI search tool. Ask ACHR NEWS →

An Integrated HVAC Solution

“The Mammoth rooftop systems are integrated into the architecture of the building roofs and contain all of the HVAC equipment,” said Jeff Wooten, LEED AP, principal with Griffin International, and the Mammoth sales representative on the project team. “They included Mammoth evaporative condensing DX systems, which are some of the most efficient air conditioning systems built, with significant energy benefits. The Mammoth rooftop systems also incorporate Fanwall Technology® air handling equipment — one of the most efficient ways to move air — and high-efficiency boilers to support the sustainable design requirements of the Delta Dental campus.”

UVC lamps, mounted in the airstream, help to provide the purest air possible while minimizing drain pan and coil maintenance. In addition, the evaporative condensing system uses Dolphin® chemical-free water treatment, thereby avoiding the use and handling of toxic chemicals.

The boilers in each Mammoth system are cross-connected for redundancy. The rooftop system on top of the new building also includes domestic water heating to accommodate both buildings. A third Mammoth system — located in the existing mechanical room in the renovated building — features an evaporative- condensing air conditioning system, sized at 44,800 cfm to augment the load on the building.

Staged Construction

Construction on the two main buildings was staged, in part so that Delta Dental employees could remain on site. The three-phased project began with construction of a remote data center in the back of the site. The new office building was then constructed.

“The new building was completed first so that workers could be relocated there before the old building was renovated,” said Peter Smeekens, senior project manager with Walbridge. Delivery of the three Mammoth systems was also staged to meet the construction schedule.

“The overall coordination with John E. Green Co., the installing contractor, went well and as planned,” Smeekens said. “John E. Green Co. did a fine job with the installation and Griffin International provided excellent support as the Mammoth representative,” added Kemp. “Overall, the installation went very smoothly.”

Commissioning: A Joint Effort

Walbridge’s proprietary V-Start program initiated the commissioning effort for the mechanical systems at the Delta Dental campus. “Following our documentation of mechanical equipment metrics, commissioning of systems across the facilities was a joint process,” Smeekens said. Third-party commissioning on the facilities was provided by Albert Kahn Associates for the two office buildings and ThermalTech Engineering of Cincinnati for the remote data center.

Delta Dental looks forward to many years of occupant comfort, reliable service, and energy efficiency from the Mammoth custom-packaged rooftop systems.

LEED Point Specifics

The two Mammoth custom-packaged systems on the roofs and the Mammoth mechanical systems located inside the mechanical room of the renovated building all contributed to the Delta Dental campus earning LEED Gold certification. Specifically, the units contributed to outdoor air delivery monitoring (EQc1) which supports occupant comfort and well-being as well as overall building energy efficiency. They also contributed to EAc1, Optimize Energy Performance, which reduces the building operational costs when compared to standard HVAC systems. One point was earned for Outdoor Air Delivery monitoring and three for Optimize Energy Performance.

“The efficiency of the Mammoth air conditioning systems contributed to the overall building performance which, when compared to ASHRAE 90.1 Appendix G baseline, was able to provide an energy cost savings of approximately 14.7 percent,” Kemp said.

In addition to the high-efficiency air conditioning and boiler systems, additional LEED program credits were granted based on a number of sustainable design features at the Delta Dental campus. These include the use of both vegetative and white-membrane roofs that minimize the heat island effect, reduce storm water runoff, filter pollutants, and provide natural thermal insulation. Other sustainable design elements include thermally efficient windows, low-energy lighting, and daylight harvesting.

Publication date: 12/8/2014

Want more HVAC industry news and information? Join The NEWS on Facebook, Twitter, and LinkedIn today!

KEYWORDS: energy efficiency LEED (Leadership in Energy and Environmental Design)

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Commercial Market
    By: Joanna R. Turpin
Subscription Center
  • Create an Account
  • Start a Subscription
  • Manage My Account
  • Sign Up for Newsletters
  • Visit Customer Service
  • Update Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to The News audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The News or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Piggy Bank
    Sponsored byWatercress Financial

    Energy Prices, Inflation, and HVAC: What Today’s Homeowners Care About

  • Refrigerated Food
    Sponsored bySolstice Advanced Materials

    R-455A Refrigeration: A Cold Storage Solution for the Future

  • Airex Rooftop Units
    Sponsored byAirex Manufacturing Inc

    Consolidating Roof Penetrations: A Growing Trend in Multifamily HVAC Design

Popular Stories

Outdoor-condensing-units.jpg

EPA Removes R-410A Installation Deadline

HVAC-Price-Increase-graphic

HVAC Price Increase List: June 2026

Trump-Section-232.jpg

Trump Reduces Section 232 Tariffs on HVAC Equipment to 15%

cooling-habits.jpg

50 Percent of Americans Have Skipped HVAC Maintenance

ACHR NEWS Editor Chris Gray Presenting HVAC Minute 5-18-2026

HVAC Manufacturers Fight Pricing Lawsuits

View The ACHR NEWS
Centennial Anniversary Timeline

The ACHR News Timeline Chart
Submit a Letter
Submit a letter to our editors.

Events

November 6, 2025

Next-Gen Data Center Cooling: HVAC Innovation and Real-World Solutions

On Demand As AI workloads and high-density computing push traditional cooling methods to their limits, the data center industry is accelerating the adoption of next-generation HVAC technologies.

June 9, 2026

Before You Go All In on AI: Set Up Your Business to Actually Win

In this webinar, we'll walk you through exactly what to get in place before you add AI to your business. You'll leave with a clear picture of where you stand today and a practical action plan to set yourself up for real results.

View All Submit An Event

Poll

EPA Decision

Are you happy the EPA decided contractors can continue to install R-410A equipment?
View Results Poll Archive

Products

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

See More Products
A2L Refrigerants - Free Webinar - May 21, 2026

Related Articles

  • Student-led design team

    Student-Led Design Team Leads Minnesota High School to LEED Gold Certification

    See More
  • The Downtown Data Center’s enterprise IT space

    The University of Utah's Downtown Data Center's Path to LEED Gold

    See More
  • Rooftop Systems Earn LEED-Gold Status

    See More

Related Products

See More Products
  • Understanding TXV Refrigeration Systems: Superheat and Subcooling DVD

  • Troubleshooting Tips for Servicing Refrigeration Systems

  • Uncomplicating The Heat Pump: Refrigeration & Air Flow Systems DVD

See More Products
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing