ACHR News
search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
ACHR News
  • NEWS
    • Breaking News
    • New HVAC Products
    • Featured Products
    • Manufacturer Reports
    • HVAC Data
    • Legislation
    • ACHR NEWS Centennial
  • RESIDENTIAL
    • Air Conditioners
    • Furnaces
    • Residential Heat Pumps
    • Ductless
    • Residential IAQ
    • Testing, Monitoring, Tools
    • Components & Accessories
  • COMMERCIAL
    • Air Handlers
    • Rooftop Units
    • Chillers and Cooling Towers
    • Commercial Heat Pumps
    • Boilers and Hydronics
    • VRF/Ductless
    • Commercial IAQ
  • REFRIGERATION
    • Refrigerants
    • Refrigerant Regulations
    • Leak Management
  • CONTRACTOR PRO
    • Geothermal
    • Homeowner Study
    • VRF and VRV Ductless
    • Unitary Trends
  • EDUCATION
    • Training and Education
    • Business Management
    • Service and Maintenance
    • Continuing Education
    • Market Research >
      • HVAC Brand Awareness Report
      • VRV, VRF, VRVZ Report
      • Unitary Trends Report
      • Water Heat Professionals Report
    • Webinars
    • Sponsor Insights
    • eProducts Info
    • White Papers
  • EVENTS
    • HVAC Contractor Forum
    • Industry Events and Webinars
  • MEDIA
    • Videos
    • AHR Expo 2025 Videos
    • Podcasts >
      • ACHR News Podcast
      • HARDI Podcasts
      • AHR Expo Podcasts
      • ACCA Podcasts
    • Interactive Spotlights
    • Quizzes
    • eBooks
    • HVAC Talkback
  • HVAC GROUP
    • ACHR NEWS >
      • Current Issue
      • Digital Edition
      • Subscribe
    • Distribution Trends
    • SNIPS NEWS >
      • Join SNIPS NEWS
    • Engineered Systems News >
      • Join ES News
    • HVACR Directory
    • Contests
    • Newsletters
    • Contact
    • Advertise
    • My Account

IAQ in Buildings Under Construction

By Joanna R. Turpin
February 12, 2001
Most of the time we think about indoor air quality (IAQ) problems in terms of buildings that are already completed and occupied. Those problems may consist of mold growth and/or improper ventilation. But have you ever thought about the kinds of IAQ problems that can occur in buildings that may be occupied but are still under construction?

The Sheet Metal and Air Con-ditioning Contractors’ National Association (SMACNA) says there are real problems that can happen, and the organization would like contractors to take the necessary precautions when working in an occupied building.

SMACNA’s book, IAQ Guidelines for Occupied Buildings Under Construction, encourages contractors to take a look at the construction process ahead of time and to plan every step of the way with IAQ in mind.

Filling a Need

SMACNA decided to produce this guideline after members attended an ASHRAE meeting several years ago. At that conference, Bill Navas, project manager, SMACNA, says they could see from a large cross-section of the construction industry that there was a huge need for an organized set of guidelines for occupied buildings under construction.

“There’s plenty of guidance for buildings under operation; ASHRAE has standards. But the situation during construction is very specialized. It presents some very unique problems. And really, the available information is only in the way of the experience factor. Contractors who are experienced in construction recall cases of what they have seen and react accordingly,” says Navas.

The book, which was written under SMACNA’s Building Services Committee, brings together the knowledge from various experiences in order to give readers valuable guidance on how they should proceed.

It is well known that certain construction processes create certain pollutants and that certain situations could be annoying to people who are already occupying a building. Navas notes that there are usually two cases in which these construction processes can create a problem:

1. When a building is partially under construction because it’s in the process of being completed; and

2. When the building is already in operation but portions of it are taken out for construction.

Looking for quick answers on air conditioning, heating and refrigeration topics? Try Ask ACHR NEWS, our new smart AI search tool. Ask ACHR NEWS →

Several states have already adopted the organization’s guidelines, Massachusetts being the most recent. In that case, the Department of Public Health noted several problems with air quality in Massachusetts’ public schools when renovation projects were in progress.

The result is that the Department of Public Health has requested that the Department of Education mandate the application of the SMACNA publication by all contractors bidding for construction projects.



Dust Is An Issue

The book notes that several types of airborne contaminants can occur in a building under construction. The first is dust, which will find its way all over the building unless properly contained. The second source of pollutants involves odors or dust that are involved in the construction process (coatings, adhesives, etc.).

The third source includes emissions produced from equipment used during construction. The fourth category comes into play when damage to existing building systems (demolition of ductwork, etc.) occurs and results in the release of contaminants, such as dust, steam, or natural gas. The final source of pollutants includes those released from waste construction materials that are being stored or transported.

For hvac contractors, dust is probably the biggest issue. That’s because the hvac system itself is often the way in which many pollutants, including dust, are circulated throughout a building. These pollutants can enter a building through return grilles, through the mechanical room, through hvac system intakes, and via temporary or permanent cross-connections.

While dust can never be contained completely, the book points out ways in which the hvac contractor can keep it in check.

Contractors should start by making sure they don’t contaminate the ductwork with dust in the first place. Therefore, one of the steps involves the registers being sealed. Once dust gets into the ductwork, there are two problems:

1. If the system is operational, dust is being moved everywhere in the building.

2. If the system isn’t operational, once it starts up, the dust will cover all the furnishings.

It’s also important that contractors understand how the hvac system works — where it runs from and to — so that if somebody needs air conditioning in a certain area of the building or on a certain floor, they know how to get air to the occupants without getting pollutants from the construction area to them.

SMACNA’s goal in writing the book was to provide an easy-to-use reference guide for contractors, building owners, architects, and anyone else involved in construction of occupied buildings. Some of that reference material answers these questions:

  • What are the most common sources of airborne contaminants?
  • What IAQ control measures can be effective?
  • How can a construction project be planned for good IAQ?
  • How can a site be monitored for compliance with IAQ requirements?
  • As Navas notes, this is not rocket science. “Construction people know exactly what the problems are going to be, so the important thing is to plan ahead of time as to the types of controls that they’re going to exert over the construction process so as to limit or avoid creating hazardous conditions for occupants. Sometimes it’s just an annoyance. Sometimes it’s a very serious thing.”

    To order SMACNA’s IAQ Guidelines for Occupied Buildings Under Construction, call 703-803-2989, or visit the organization online at www.smacna.org. The list price for the manual is $83, and the discounted price for architectural and engineering firms, government organizations, and schools is $58.

    Publication date: 02/12/2001

    Share This Story

    Looking for a reprint of this article?
    From high-res PDFs to custom plaques, order your copy today!

     

    Tn joanna 2017
    Joanna Turpin is a Senior Editor at The ACHR NEWS. She can be contacted at 248-786-1707 or joannaturpin@achrnews.com. Joanna has been with BNP Media since 1991, first heading up the company’s technical book division before moving over to The ACHR NEWS, where she frequently writes about refrigerants and commercial refrigeration. She obtained her bachelor’s degree in English from the University of Washington and worked on her master’s degree in technical communication at Eastern Michigan University.

    Recommended Content

    JOIN TODAY
    To unlock your recommendations.

    Already have an account? Sign In

    • HVAC-enrollment

      The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

      A new wave of future technicians is entering the pipeline.  
      News
      By: Matt Jachman
    • 2025 Top 40 Under 40

      2025 Top 40 Under 40 HVACR Professionals List

      The 11th annual Top 40 Under 40 list highlights those...
      HVAC Residential Market
      By: Hannah Belloli-Oster
    • LG Ductless Mini-Split Systems

      The 9 Types of Heat Pumps

      As the U.S. moves toward electrification, heat pumps are...
      HVAC Commercial Market
      By: Joanna R. Turpin
    Subscription Center
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences

    More Videos

    Sponsored Content

    Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to The News audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The News or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

    close
    • Piggy Bank
      Sponsored byWatercress Financial

      Energy Prices, Inflation, and HVAC: What Today’s Homeowners Care About

    • Refrigerated Food
      Sponsored bySolstice Advanced Materials

      R-455A Refrigeration: A Cold Storage Solution for the Future

    • Airex Rooftop Units
      Sponsored byAirex Manufacturing Inc

      Consolidating Roof Penetrations: A Growing Trend in Multifamily HVAC Design

    Popular Stories

    Outdoor-condensing-units.jpg

    EPA Removes R-410A Installation Deadline

    Trump-Section-232.jpg

    Trump Reduces Section 232 Tariffs on HVAC Equipment to 15%

    HVAC-Price-Increase-graphic

    HVAC Price Increase List: June 2026

    cooling-habits.jpg

    50 Percent of Americans Have Skipped HVAC Maintenance

    ACHR NEWS Editor Chris Gray Presenting HVAC Minute 5-18-2026

    HVAC Manufacturers Fight Pricing Lawsuits

    View The ACHR NEWS
    Centennial Anniversary Timeline

    The ACHR News Timeline Chart
    Submit a Letter
    Submit a letter to our editors.

    Events

    November 6, 2025

    Next-Gen Data Center Cooling: HVAC Innovation and Real-World Solutions

    On Demand As AI workloads and high-density computing push traditional cooling methods to their limits, the data center industry is accelerating the adoption of next-generation HVAC technologies.

    June 9, 2026

    Before You Go All In on AI: Set Up Your Business to Actually Win

    In this webinar, we'll walk you through exactly what to get in place before you add AI to your business. You'll leave with a clear picture of where you stand today and a practical action plan to set yourself up for real results.

    View All Submit An Event

    Poll

    EPA Decision

    Are you happy the EPA decided contractors can continue to install R-410A equipment?
    View Results Poll Archive

    Products

    BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

    BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

    See More Products
    A2L Refrigerants - Free Webinar - May 21, 2026

    Related Articles

    • Dec. 27, 2006: IAQ Guidelines for Buildings Under Construction Available for Review

      See More
    • Jan. 21, 2010: Associations Release New Guide on Improving IAQ in Buildings

      See More
    • IAQ in Commercial Buildings

      Evaluating the True Value of IAQ in Commercial Buildings

      See More

    Related Products

    See More Products
    • EHEP002028.jpg

      Principles of Heating, Ventilation, and Air Conditioning in Buildings, 1st Edition

    • 1966.gif

      HVAC Duct Construction Standards - Metal and Flexible

    • Building Information Modeling: Planning and Managing Construction Projects with 4D CAD and Simulations

    See More Products

    Related Directories

    • TRION IAQ

      Trade NamesAir Bear®Air Boss®ComfortSteam®Forever Filter®Grease Viper™Herrdraulic®Herricane®Herrmersion®Herrmidicool®Herrmidifier®Herrmidisteam®Herrtronic®Trion®
    • National Assn. of Women in Construction-NAWIC

      NAWIC, the premier association for women in construction, provides education, professional development, and networking opportunities to over 5,000 members across the U.S.
    ×

    Sign Up. Stay Informed.

    The #1 trusted source for the HVACR industry since 1926

    SUBSCRIBE
    • RESOURCES
      • Advertise
      • Contact Us
      • Advisory Board
      • Classifieds
      • Submit a Letter
      • Directories
      • Store
    • ACCOUNT CENTER
      • Create an Account
      • Start a Subscription
      • Manage My Account
      • Sign Up for Newsletters
      • Visit Customer Service
      • Update Preferences
    • SERVICES
      • Marketing Services
      • Reprints
      • Market Research
      • List Rental
      • Survey/Respondent Access
    • STAY CONNECTED
      • LinkedIn
      • Facebook
      • Instagram
      • YouTube
      • X (Twitter)
    • PRIVACY
      • PRIVACY POLICY
      • TERMS & CONDITIONS
      • DO NOT SELL MY PERSONAL INFORMATION
      • PRIVACY REQUEST
      • ACCESSIBILITY

    Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

    Design, CMS, Hosting & Web Development :: ePublishing