ACHR News
search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
ACHR News
  • NEWS
    • Breaking News
    • New HVAC Products
    • Featured Products
    • Manufacturer Reports
    • HVAC Data
    • Legislation
    • ACHR NEWS Centennial
  • RESIDENTIAL
    • Air Conditioners
    • Furnaces
    • Residential Heat Pumps
    • Ductless
    • Residential IAQ
    • Testing, Monitoring, Tools
    • Components & Accessories
  • COMMERCIAL
    • Air Handlers
    • Rooftop Units
    • Chillers and Cooling Towers
    • Commercial Heat Pumps
    • Boilers and Hydronics
    • VRF/Ductless
    • Commercial IAQ
  • REFRIGERATION
    • Refrigerants
    • Refrigerant Regulations
    • Leak Management
  • CONTRACTOR PRO
    • Geothermal
    • Homeowner Study
    • VRF and VRV Ductless
    • Unitary Trends
  • EDUCATION
    • Training and Education
    • Business Management
    • Service and Maintenance
    • Continuing Education
    • Market Research >
      • HVAC Brand Awareness Report
      • VRV, VRF, VRVZ Report
      • Unitary Trends Report
      • Water Heat Professionals Report
    • Webinars
    • Sponsor Insights
    • eProducts Info
    • White Papers
  • EVENTS
    • HVAC Contractor Forum
    • Industry Events and Webinars
  • MEDIA
    • Videos
    • AHR Expo 2025 Videos
    • Podcasts >
      • ACHR News Podcast
      • HARDI Podcasts
      • AHR Expo Podcasts
      • ACCA Podcasts
    • Interactive Spotlights
    • Quizzes
    • eBooks
    • HVAC Talkback
  • HVAC GROUP
    • ACHR NEWS >
      • Current Issue
      • Digital Edition
      • Subscribe
    • Distribution Trends
    • SNIPS NEWS >
      • Join SNIPS NEWS
    • Engineered Systems News >
      • Join ES News
    • HVACR Directory
    • Contests
    • Newsletters
    • Contact
    • Advertise
    • My Account

The Lowdown on Low Ice Production

March 2, 2001
The ice machine owner calls you with an all-too-common complaint: “It’s making ice, but it just won’t keep up.”

It is possible that the machine needs a really good cleaning. Or, the unit may be undersized for how much it is used and what the temperature around it may be.

When you arrive at the jobsite, first do a quick visual inspection of the unit. Look for signs that normal maintenance has not been performed; this can seriously affect ice production. Remember, regular maintenance really pays big benefits towards better efficiency and maximum production.

Generally, manufacturers recommend a service schedule that includes cleaning the water system with an acid-based ice machine cleaner and sanitizing to eliminate bacteria. Annual cleaning is usually recommended.

However, additional regular service may be required in areas with bad water.

Cleaning instructions are usually located on the cleaning label and/or in the instruction manual that comes with the unit. Be sure to follow the instructions and use the cleaner recommended by the manufacturer; this will protect a plated-type evaporator from damage due to harsh chemicals.

Inspection CHECKLIST

  • Check water system and evaporator for scale buildup. Clean as necessary.
  • Check for talc or mineral buildup in the reservoir. Remove and flush thoroughly.
  • Check pump motor operation. Look for a broken impeller or slow pumping.
  • Check water flow through the external water filter. You are looking for low water flow to the unit.
  • Check the strainer, the inlet water valve screen, or the float valve (if used) for obstruction.
  • Inspect the float valve assembly adjustment and operation (if used).
  • Check the air filter and condenser fan blade and coil for dust and grime.
  • Check for proper drainage or water backup in the bin that can melt ice away.
  • Inspect for water overflow in the reservoir that washes ice away.
  • Check the bin control for proper location and operation.


  • PRODUCTION CHECK

    Once you have inspected the unit and cleaned it as necessary, determine if there really is a problem by conducting a production check.

    You will need to time a complete cycle, from the beginning of one freeze cycle to the beginning of the next. You will need to catch the ice produced during this cycle and weigh it.

    The formula for checking ice production is to divide the cycle time (in minutes) into 1,440 min to get the number of cycles the unit will run in a day. Then multiply the number of cycles by the ice drop weight (in pounds) for the total ice production in 24 hrs.

    Looking for quick answers on air conditioning, heating and refrigeration topics? Try Ask ACHR NEWS, our new smart AI search tool. Ask ACHR NEWS →

    1,440 ÷ Cycle Time X Ice Drop Weight = Production

    While you are waiting for the cycle to complete, check the manufacturer’s data on that specific model number to determine what the production should be. Data charts are generally available to show production, ice drop weight, and approximate cycle times under a variety of conditions.

    You will need to know the incoming water temperature and ambient temperature around the unit to cross-reference the data chart.

    Once the production test is completed, compare the results with the manufacturer’s data. If the amounts are close, that is likely all of the ice that will be produced by that machine in one day.



    WHERE’S THE ICE GOING?

    At this point you will want to discuss where the ice is going. Determine the approximate ice needs by asking a few questions. Make a list of what the ice is used for and the approximate amounts. Add a 25% fudge factor and compare it to the present supply.

    If the production is inadequate, seize the opportunity to sell the customer a larger ice machine.

    It is possible, however, that the customer may have the appropriate machine production but does not have enough storage to get through heavy-use periods. In this case, there are usually two choices. They can bank ice in bags in the freezer for hot days, or change to a larger storage bin.

    If the production is not within the manufacturer’s specifications, it’s time to check the refrigeration cycle.

    Most ice machines use a standard thermostatic expansion valve system. These ice machines have a critical charge system for maximum ice production. The refrigerant type and correct charge are usually listed on the unit nameplate.

    The key to proper production is proper cycle time. The freeze and harvest times should closely match the manufacturer’s specifications for the air and water temperatures at which you are operating.

    Remember that while all ice machines perform the same function, the operational sequence varies between manufacturers. Cycle time also varies. Some manufacturers prefer long cycle times while others prefer short cycle times. Know your products well enough that you can spot a problem if it exists.



    SYSTEM CHECKS

  • If the evaporator and condenser are clean and a charge problem is suspected, read the nameplate charge type/amount and weigh in correct type/amount.
  • Check system pressures against manufacturer performance data.
  • Inspect the evaporator’s frost pattern and freeze cycle time for proper expansion valve operation.
  • Check ice fill on the evaporator. Look for full, normally shaped cubes from top to bottom.
  • Check compressor efficiency by the compressor manufacturer’s amperage curve. The pumpdown method is not recommended.
  • Check the hot gas system for proper operation. No hot gas should leak through the hot gas valve during the freeze cycle.
  • Look for proper operation of additional refrigeration components such as headmaster valve, bypass-cooling valve, liquid line valve, etc.
  • Look for proper pump motor and fan motor operation.
  • Once the problem is identified, use proper refrigeration practices to repair it so that your customer will be back in the ice business at maximum capacity. Or, use the information you’ve gathered to encourage that customer to upgrade the equipment.

    Moore is director of technical support for Hoshizaki America Inc., Peachtree City, GA. He can be reached at techsupport@hoshizaki.com (e-mail).

    Publication date: 03/05/2001

    Share This Story

    Looking for a reprint of this article?
    From high-res PDFs to custom plaques, order your copy today!

     

    Recommended Content

    JOIN TODAY
    To unlock your recommendations.

    Already have an account? Sign In

    • HVAC-enrollment

      The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

      A new wave of future technicians is entering the pipeline.  
      News
      By: Matt Jachman
    • 2025 Top 40 Under 40

      2025 Top 40 Under 40 HVACR Professionals List

      The 11th annual Top 40 Under 40 list highlights those...
      HVAC Commercial Market
      By: Hannah Belloli-Oster
    • LG Ductless Mini-Split Systems

      The 9 Types of Heat Pumps

      As the U.S. moves toward electrification, heat pumps are...
      Air Source Heat Pumps
      By: Joanna R. Turpin
    Subscription Center
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences

    More Videos

    Sponsored Content

    Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to The News audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The News or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

    close
    • Piggy Bank
      Sponsored byWatercress Financial

      Energy Prices, Inflation, and HVAC: What Today’s Homeowners Care About

    • Refrigerated Food
      Sponsored bySolstice Advanced Materials

      R-455A Refrigeration: A Cold Storage Solution for the Future

    • Airex Rooftop Units
      Sponsored byAirex Manufacturing Inc

      Consolidating Roof Penetrations: A Growing Trend in Multifamily HVAC Design

    Popular Stories

    Outdoor-condensing-units.jpg

    EPA Removes R-410A Installation Deadline

    Trump-Section-232.jpg

    Trump Reduces Section 232 Tariffs on HVAC Equipment to 15%

    HVAC-Price-Increase-graphic

    HVAC Price Increase List: June 2026

    cooling-habits.jpg

    50 Percent of Americans Have Skipped HVAC Maintenance

    ACHR NEWS Editor Chris Gray Presenting HVAC Minute 5-18-2026

    HVAC Manufacturers Fight Pricing Lawsuits

    View The ACHR NEWS
    Centennial Anniversary Timeline

    The ACHR News Timeline Chart
    Submit a Letter
    Submit a letter to our editors.

    Events

    November 6, 2025

    Next-Gen Data Center Cooling: HVAC Innovation and Real-World Solutions

    On Demand As AI workloads and high-density computing push traditional cooling methods to their limits, the data center industry is accelerating the adoption of next-generation HVAC technologies.

    June 9, 2026

    Before You Go All In on AI: Set Up Your Business to Actually Win

    In this webinar, we'll walk you through exactly what to get in place before you add AI to your business. You'll leave with a clear picture of where you stand today and a practical action plan to set yourself up for real results.

    View All Submit An Event

    Poll

    EPA Decision

    Are you happy the EPA decided contractors can continue to install R-410A equipment?
    View Results Poll Archive

    Products

    BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

    BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

    See More Products
    A2L Refrigerants - Free Webinar - May 21, 2026

    Related Articles

    • Low ice production: What to do if your unit just won't keep up

      See More
    • Techs Get the Lowdown on R-22

      See More
    • The Lowdown On Electric Valves

      See More

    Related Products

    See More Products
    • Manual Q.jpg

      Manual Q - Low Pressure, Low Velocity Duct System Design

    • Manual LLH Cover_Final.jpg

      Manual LLH - 2019 (HVAC System Design for Low Load Homes)

    • low grade.png

      Low GWP Refrigerant Safety: Flammable & Mildly Flammable Refrigerants Manual

    See More Products
    ×

    Sign Up. Stay Informed.

    The #1 trusted source for the HVACR industry since 1926

    SUBSCRIBE
    • RESOURCES
      • Advertise
      • Contact Us
      • Advisory Board
      • Classifieds
      • Submit a Letter
      • Directories
      • Store
    • ACCOUNT CENTER
      • Create an Account
      • Start a Subscription
      • Manage My Account
      • Sign Up for Newsletters
      • Visit Customer Service
      • Update Preferences
    • SERVICES
      • Marketing Services
      • Reprints
      • Market Research
      • List Rental
      • Survey/Respondent Access
    • STAY CONNECTED
      • LinkedIn
      • Facebook
      • Instagram
      • YouTube
      • X (Twitter)
    • PRIVACY
      • PRIVACY POLICY
      • TERMS & CONDITIONS
      • DO NOT SELL MY PERSONAL INFORMATION
      • PRIVACY REQUEST
      • ACCESSIBILITY

    Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

    Design, CMS, Hosting & Web Development :: ePublishing