ACHR News
search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
ACHR News
  • NEWS
    • Breaking News
    • New HVAC Products
    • Featured Products
    • Manufacturer Reports
    • HVAC Data
    • Legislation
    • ACHR NEWS Centennial
  • RESIDENTIAL
    • Air Conditioners
    • Furnaces
    • Residential Heat Pumps
    • Ductless
    • Residential IAQ
    • Testing, Monitoring, Tools
    • Components & Accessories
  • COMMERCIAL
    • Air Handlers
    • Rooftop Units
    • Chillers and Cooling Towers
    • Commercial Heat Pumps
    • Boilers and Hydronics
    • VRF/Ductless
    • Commercial IAQ
  • REFRIGERATION
    • Refrigerants
    • Refrigerant Regulations
    • Leak Management
  • CONTRACTOR PRO
    • Geothermal
    • Homeowner Study
    • VRF and VRV Ductless
    • Unitary Trends
  • EDUCATION
    • Training and Education
    • Business Management
    • Service and Maintenance
    • Continuing Education
    • Market Research >
      • HVAC Brand Awareness Report
      • VRV, VRF, VRVZ Report
      • Unitary Trends Report
      • Water Heat Professionals Report
    • Webinars
    • Sponsor Insights
    • eProducts Info
    • White Papers
  • EVENTS
    • HVAC Contractor Forum
    • Industry Events and Webinars
  • MEDIA
    • Videos
    • AHR Expo 2025 Videos
    • Podcasts >
      • ACHR News Podcast
      • HARDI Podcasts
      • AHR Expo Podcasts
      • ACCA Podcasts
    • Interactive Spotlights
    • Quizzes
    • eBooks
    • HVAC Talkback
  • HVAC GROUP
    • ACHR NEWS >
      • Current Issue
      • Digital Edition
      • Subscribe
    • Distribution Trends
    • SNIPS NEWS >
      • Join SNIPS NEWS
    • Engineered Systems News >
      • Join ES News
    • HVACR Directory
    • Contests
    • Newsletters
    • Contact
    • Advertise
    • My Account
Boilers and Hydronics

Hydronic Chilled Beam System Regulates Military Environment

Wet Heat Technology Brings Comfort to Air Force Base

March 4, 2013

Weldin Construction’s Mechanical Division has successfully completed multiple hydronic installations throughout the Joint Base Elmendorf-Richardson (JBER) Air Force base near Anchorage, Alaska. As the base constructed its Emergency Operations Center (EOC), Weldin’s was on the top of the list to handle the HVACR installation work.

Highly classified and on the cutting-edge, some of the world’s most advanced military technology is housed within the EOC. Though only 8,000 square feet in size, the facility has computers and work stations for more than 100 officers and is tasked with operating as a strategic central command in case of emergency. With all of the high-tech equipment inside the building, the facility requires substantial cooling, even during an Alaskan winter.

Headquartered in Palmer, Alaska, Weldin faced some challenges with this install; one of which was the amount of overhead clearance that was available. The main facility’s floor is built on top of a 12-inch plenum that acts as a conduit for the maze of necessary electric and communications wires. This left no vertical space to spare. During the design process, it became apparent that there would be no room for ductwork either. The solution: Weldin opted for a hydronic chilled beam system.

Early Adopter Concerns

According to Weldin, hydronic chilled beam technology had not been specified to heat and cool a facility before. The technology is relevantly new to the U.S. market and government managers were wary to install this technology, but, trusting Weldin’s knowledge and on-base experience, they elected to move ahead with the idea.

“Weldin has a fab shop and a one-acre yard on base,” said Steve Nazaroff, mechanical division manager at Weldin Construction. “As general and mechanical contractors, we’ve had projects going on within the base continuously since 2001. The EOC is the third project that has incorporated engineering from Taco Inc. In 2010, we built an F-22 fighter jet flight-simulator building, and a training facility. Ironically, those two buildings also use a new and emerging hydronic recipe — LoadMatch — and they’ve performed flawlessly. That’s the sort of track record we needed for involvement on this project.”

Weldin’s earlier JBER projects put hybrid, single-pipe, and primary-secondary hydronic technology to work with mechanical-system designs chosen because of their operational efficiency, yet unproven in the U.S. on a broad scale. A similar project on base — albeit from an entirely different engineer, installer, and manufacturer — had failed in the 1980s.

Concerns that the new chilled beam system wouldn’t operate as planned were quickly settled; the Weldin team gained full approval within the hard-to-impress military community.

Looking for quick answers on air conditioning, heating and refrigeration topics? Try Ask ACHR NEWS, our new smart AI search tool. Ask ACHR NEWS →

“We have a good relationship with government managers here,” said Nazaroff. “They knew we could be trusted to handle the EOC project, and we weren’t planning to let them down.”

Chilled Beam Debut

Chilled beam technology is a method of delivering heating and cooling with what Nazaroff describes as “off-the-charts efficiency.”

Visually, contractors should picture a flat, low-profile fin tube radiator mounted inside a sheet metal box suspended from the ceiling.

The hybrid system sometimes uses forced convection, which makes it an active chilled beam unit. Other times, air circulation is left to natural convection, making it a passive chilled beam system. These types of systems can approach 150 Btuh per square foot for passive operation and 400 Btuh per square foot for active systems.

Because chilled beams are ceiling-mounted and do not require the use of drain pans, chilled water-supply temperatures must be above the ambient dew point. As a result, dehumidification, or latent cooling, is usually handled by a separate, dedicated outdoor air system (or DOAS), supplying dry, conditioned air to the space.

Passive chilled beam systems supply the DOAS airflow through a separate diffuser or grille in the room. An active chilled beam supplies the DOAS airflow through the chilled beam, thereby increasing the capacity of the cooling coil through forced convection.

“What makes chilled beam technology so interesting is its broad applicability for commercial structures, and extreme energy and thermal efficiency,” said Greg Cunniff, P.E., application engineering manager for Taco Inc. “Another key advantage is that a chilled beam system requires very little ceiling space and height.”

To help with the pump energy demand from this system, Weldin specified Taco’s pre-packaged LOFlo injection mixing system. It consists of a variable-speed injection circulator on the chiller side of the mixing block, and a constant-speed zone circulator on the beam side. According to the company, the use of LOFlo mixing blocks eliminates the need for a separate chiller or air conditioning system to handle the latent load.

“With a LOFlo system, we’re able to use one chiller,” said Cunniff. “Water comes out of the chiller at 45˚F. It supplies the DOAS coil for latent cooling, and goes to the mixing blocks where it’s mixed to the exact temperature needed in the chilled beams. Return water is generally around 60˚.”

In this manner, a 20-ton Aaon chiller supplies water to 32 Price chilled beam fixtures, each measuring 2 feet by 4 feet.”

All or Nothing

The hydronic system at the EOC rarely coasts at the half-load mark. Either the facility will be empty, or an exercise will be underway, with 100 or more occupants, each served by one or more computers. When the EOC is occupied, the cooling load is 140,000 Btuh — nearly three times that of the heating load.

When this occurs, the LOFlo mixing blocks run at a steady, half-gallon per minute rate on the beam-side. Five of the mixing blocks are used and six or seven chilled beam units pull water from each of the mixing blocks.

“The system resets the chilled-water temperatures as the latent load increases,” said Nazaroff. “Under normal load conditions, chilled water-supply temperatures hover around 59˚, about two degrees above the room’s dew point. In the summer, the target temperature for the room is 68˚.”

Stealth Performance

Three 5-ton Data Aire chiller systems handle the heavy load caused by computer infrastructure in some smaller rooms. The uninterruptible power supply (UPS) room and critical telecommunications room need extra cooling capacity to keep equipment functioning properly.

In the winter, and especially when unoccupied, the EOC calls for heat, even though it’s mostly underground. Design temperature for the long heating season is 68˚. A Taco 2400 circulator moves 180˚ heating-supply water to satisfy the 52,000-Btuh heating load for the 16-room facility. Heat comes from a standalone steam boiler.

“Security is always a challenge that we encounter when working at JBER, and that’s to be expected,” said Nazaroff. “The challenge didn’t last long though.”

Weldin’s trucks were identified, background checks on technicians were completed, and ID tags were issued. “Like you’d expect with any job involving new technology, we had a few bugs to work out,” said Nazaroff. “But now, after two exercises in the EOC, the personnel in the facility are completely unaware of the heating and cooling system, just as it should be. I like to refer to it as a stealth comfort system.”

Publication date: 3/4/2013 

KEYWORDS: emergency planning hydronics taco

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    News
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Air Source Heat Pumps
    By: Joanna R. Turpin
Subscription Center
  • Create an Account
  • Start a Subscription
  • Manage My Account
  • Sign Up for Newsletters
  • Visit Customer Service
  • Update Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to The News audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The News or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Piggy Bank
    Sponsored byWatercress Financial

    Energy Prices, Inflation, and HVAC: What Today’s Homeowners Care About

  • Refrigerated Food
    Sponsored bySolstice Advanced Materials

    R-455A Refrigeration: A Cold Storage Solution for the Future

  • Airex Rooftop Units
    Sponsored byAirex Manufacturing Inc

    Consolidating Roof Penetrations: A Growing Trend in Multifamily HVAC Design

Popular Stories

HVAC-Price-Increase-graphic

HVAC Price Increase List: June 2026

Trump-Section-232.jpg

Trump Reduces Section 232 Tariffs on HVAC Equipment to 15%

R410A-Refrigerant-Cylinder.jpg

Refrigerant Recovery is a Revenue Opportunity

Heat-pump-cutaway.jpg

PFAS Rules and A2L Building Codes Continue to Evolve

Kroger.jpg

Kroger to Spend $100 Million to Reduce Refrigerant Leaks

View The ACHR NEWS
Centennial Anniversary Timeline

The ACHR News Timeline Chart
Submit a Letter
Submit a letter to our editors.

Events

November 6, 2025

Next-Gen Data Center Cooling: HVAC Innovation and Real-World Solutions

On Demand As AI workloads and high-density computing push traditional cooling methods to their limits, the data center industry is accelerating the adoption of next-generation HVAC technologies.

June 9, 2026

Before You Go All In on AI: Set Up Your Business to Actually Win

In this webinar, we'll walk you through exactly what to get in place before you add AI to your business. You'll leave with a clear picture of where you stand today and a practical action plan to set yourself up for real results.

View All Submit An Event

Poll

Summer Staff

Are you fully staffed for the summer season?
View Results Poll Archive

Products

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

See More Products
A2L Refrigerants - Free Webinar - May 21, 2026

Related Articles

  • June 3, 2015: Chilled Beam System Market Worth $406.8 Million by 2020

    See More
  • Active chilled beam cooling reduces energy usage 20% in genomics lab

    See More
  • Emerging Technology: Chilled Beam Cooling

    See More

Related Products

See More Products
  • Manual B.jpg

    Manual B - Balancing and Testing Air and Hydronic Systems

  • Uncomplicating The Heat Pump: Electrical System Troubleshooting DVD

  • Training-System-2017.jpg

    Customer Service Training System by Steve Coscia

See More Products

Related Directories

  • Berg Chilling Systems Inc.

    Custom designer, manufacture, installation, and service of industrial process cooling equipment, hi and lo temp refrigeration, pumping equipment, modular chillers, industrial ice making equipment, standard and hazardous applications.
  • Great American Coil

    Hot and chilled water, chilled beam, DX, condenser, and steam coils for the O.E.M. and replacement markets. Short 4-week standard lead time with 5, 10 and 15 day quick-ship options available.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing