“We are on track to restart production at the El Dorado facility and are very encouraged by the progress the El Dorado team has made in a short period of time,” said Barry Golsen, president and COO of LSB. “We plan to repair El Dorado as soon as possible as we consider it an important part of our overall chemical business.”
Publication date: 7/2/2012