ACHR News
search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
ACHR News
  • NEWS
    • Breaking News
    • New HVAC Products
    • Featured Products
    • Manufacturer Reports
    • HVAC Data
    • Legislation
    • ACHR NEWS Centennial
  • RESIDENTIAL
    • Air Conditioners
    • Furnaces
    • Residential Heat Pumps
    • Ductless
    • Residential IAQ
    • Testing, Monitoring, Tools
    • Components & Accessories
  • COMMERCIAL
    • Air Handlers
    • Rooftop Units
    • Chillers and Cooling Towers
    • Commercial Heat Pumps
    • Boilers and Hydronics
    • VRF/Ductless
    • Commercial IAQ
  • REFRIGERATION
    • Refrigerants
    • Refrigerant Regulations
    • Leak Management
  • CONTRACTOR PRO
    • Geothermal
    • Homeowner Study
    • VRF and VRV Ductless
    • Unitary Trends
  • EDUCATION
    • Training and Education
    • Business Management
    • Service and Maintenance
    • Continuing Education
    • Market Research >
      • HVAC Brand Awareness Report
      • VRV, VRF, VRVZ Report
      • Unitary Trends Report
      • Water Heat Professionals Report
    • Webinars
    • Sponsor Insights
    • eProducts Info
    • White Papers
  • EVENTS
    • HVAC Contractor Forum
    • Industry Events and Webinars
  • MEDIA
    • Videos
    • AHR Expo 2025 Videos
    • Podcasts >
      • ACHR News Podcast
      • HARDI Podcasts
      • AHR Expo Podcasts
      • ACCA Podcasts
    • Interactive Spotlights
    • Quizzes
    • eBooks
    • HVAC Talkback
  • HVAC GROUP
    • ACHR NEWS >
      • Current Issue
      • Digital Edition
      • Subscribe
    • Distribution Trends
    • SNIPS NEWS >
      • Join SNIPS NEWS
    • Engineered Systems News >
      • Join ES News
    • HVACR Directory
    • Contests
    • Newsletters
    • Contact
    • Advertise
    • My Account
HVAC ContractingService and Maintenance

Btu Buddy 65: Chiller With High Head Pressure

By Bill Johnson
August 18, 2008

Bob is a service technician who is well trained and nationally certified. However, he sometimes suffers from the same confusion that all technicians occasionally do - the facts that he gathers may or may not point to the obvious cause of the problem or the best solution. But Bob has something that no one else has. He recalls his long-time HVACR mentor and imagines him accompanying him as “Btu Buddy,” someone who reminds him to take time to stop and think before rushing to judgment, helping keep him on the right track, even with facts that are confusing.

The day was scorching hot and Bob got a call to go to an office building because the air conditioning system was off. It was a water-cooled chiller located in the basement with the water tower on the roof of the building. The refrigerant was R-22.

When Bob arrived, he was met by the building manager who said, “We have been using another service company for several years and they say they cannot get to our call for three days, and we are without cooling. Everybody in the building is hot and irritable.”

Bob said that he would do what he can to get the system back on-line as soon as possible. He explained that all local service companies were busy because of the heat wave, then he went to the equipment room where he found a 100-ton reciprocating chiller that was not running. He looked the system over and saw that the flag on the high-pressure control was out, signaling that the unit was off because of high pressure.

Bob was about to reset the control when Btu Buddy showed up and said, “Why don’t you look at the tower before you reset the control. You may find the problem there.”

Bob said, “I should have known that I was headed in the wrong direction when you showed up.”

They went to the roof and looked at the water tower. The condenser water pump was running and the tower looked clean with clean water running through the tower.

Figure 1. This condenser has dirty tubes. The water returning to the tower from the condenser should be about 95°F. (Figures are from Refrigeration & Air Conditioning Technology, 5th Edition, by William Whitman, William Johnson, and John Tomczyk, published by Delmar Cengage Learning.)

Bob said, “This all looks good to me. I wonder if the tower fan will run. If it won’t run, the unit would cycle off because of high pressure, and with the water still running, it would eventually cool the water down.”

Btu Buddy said, “That was a good observation. The motor starter for the tower fan is over there. Turn the starter to “manual on” and see if the fan will start.”

Bob turned the fan to on and the fan started so he said, “Well, the fan will run, but it has to be controlled by a water temperature thermostat. I wonder if it is starting the fan. I am going to set the starter back to the automatic position and start the chiller and see what happens.”

Btu Buddy then said, “That is the next logical step.”

Bob pushed the button and the chiller started up. It had its own gauges for the operator to watch. As they were standing watching the chiller run, all seemed normal. Btu Buddy said, “Watch the thermometers in the condenser water lines. The water from the tower is showing 85°F in and 90° out (Figure 1). What does that tell you?”

Figure 2. This cooling tower is operating at full load, 95°F water in and 85° water out. The condenser for this tower is operating correctly.

Bob said, “The temperature rise should be about 10° and it is only 5°. The chiller doesn’t seem to be doing but half capacity (Figure 2).”

Btu Buddy then said, “What is the chilled water side of the system doing?”

Bob looked at the thermometers in the chilled water circuit and said, “The inlet water is 70° and the outlet water is 60°. The chiller seems to have a 10° drop, which is normal, but the condenser only has a 5° rise. It seems that the evaporator is operating at 100 percent and the condenser is only operating at 50 percent capacity.”

Btu Buddy said, “Great observation. You are really catching on.”

Bob said, “Thanks, experience is teaching me how.”

Btu Buddy then said, “Feel the liquid line going to the expansion valve and tell me what you feel.”

Bob felt the liquid line and said, “This line is hot, and it should only be warm.”

Btu Buddy then explained, “The system has a condenser water temperature of 85° entering the condenser and should condense the refrigerant at about 105° with 95° leaving water. It should have about 10° of subcooling, so the liquid line temperature should be about 95° when it is operating normally. What is your observation at this point?”

Bob said, “It looks like the condenser tubes are dirty and not taking the heat out of the refrigerant. Look, the head pressure is up to 260 psig. The high-pressure control is going to shut the chiller off. I think it should be set at about 275 psig. We need to get set up to clean the condenser tubes as soon as possible. I am going to call the shop and ask for someone to bring me the condenser tube cleaning machine and someone to help me clean the tubes.”

Bob called the office and got equipment and help on the way. Then he told Btu Buddy, “I am going to start removing heads from the condenser and maybe we can have this system back on in a few hours.”

Btu Buddy then said, “You are really organizing this job to save the customer downtime. They will thank you for that.”

Figure 3. The man above is cleaning the condenser tubes on a large chiller using a machine that turns a nylon brush and flushes the tube with water at the same time.

Bob turned off the condenser water pump, closed the valves on each side of the condenser, drained the condenser, and removed the heads and looked at the tubes. They were dirty and really needed cleaning. When the tube cleaning machine arrived, he and the helper cleaned and rinsed the tubes (Figure 3) and then put the heads back on the condenser. He was ready to open the valves and let the water back in the condenser when the building manager appeared and asked, “How long will it be before you can turn the system on?”

Bob said, “In about five minutes we will be ready to start the chiller back up.”

The manager said, “I was afraid you were going to say sometime tomorrow.”

Bob opened the valves and let the water fill the condenser, then he started the condenser water pump and, assured that water was flowing, he started the chiller.

He watched the high-pressure gauge and it settled down at 210 psig. The system was working correctly. He kept observing as he cleaned up the equipment room and picked up all of his tools. In about 30 minutes, the chiller was putting out 45° water and the head pressure was still 210 psig. The system was performing normally.

The manager came back to the equipment room again and said, “Thanks for getting this job done in a reasonable time. I noticed that you worked right through the lunch hour to provide service for us. I called the restaurant down on the corner and you and your helper have the lunch of your choice on us. Thanks for doing such a good job.”

As Bob got in his truck and the helper got in his truck to leave for lunch, Btu Buddy said, “You really did a great job here today. It will be noticed by management and they will reward you for doing good work.”

Bob then said, “Thanks for all of your help. It feels good when a job goes as good as this one.”

Then Bob remarked, “I wonder why those condenser tubes were dirty? The tower had a water bleed off system and the water was clean.”

Btu Buddy said, “You don’t know if the other company did regular maintenance on the system. The water could have been really dirty for a long time, then the other service company could have cleaned up the tower and not checked to see if the condenser was performing correctly.”

Bob then asked Btu Buddy, “Suppose I were to start up the system in the spring. What should my procedures be for assuring the condenser is in good shape for the season?”

Btu Buddy then suggested, “Let’s meet for lunch tomorrow and we will discuss spring startup for water-cooled equipment.”

Publication date: 08/18/2008

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Active in the HVACR industry since the 1950s, Bill Johnson graduated in gas fuel technology and refrigeration from the Southern Technical Institute, a branch of Georgia Tech (now known as Southern Polytechnic Institute). He taught HVAC classes at Coosa Valley Vocational & Technical Institute for four years. He moved on to become service manager for Layne Trane, Charlotte, N.C. He taught for 15 years at Central Piedmont Community College, part of this time as program director. He had his own business for five years doing installation and service work. Now retired, he is the author of Practical Heating Technology and Practical Cooling Technology, and continues as a co-author of Refrigeration & Air Conditioning Technology, seventh edition, all published by Delmar Cengage Learning. For more information, he can be reached at 704-968-0000 or thebillj1@gmail.com.

Btu Buddy Notebook is a collection of more than 50 service call scenarios in book form covering both cooling season and heating season troubleshooting. For more information and to purchase the book, visit the HVACR Industry Store.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Residential Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Residential Market
    By: Joanna R. Turpin
Subscription Center
  • Create an Account
  • Start a Subscription
  • Manage My Account
  • Sign Up for Newsletters
  • Visit Customer Service
  • Update Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to The News audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The News or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Piggy Bank
    Sponsored byWatercress Financial

    Energy Prices, Inflation, and HVAC: What Today’s Homeowners Care About

  • Refrigerated Food
    Sponsored bySolstice Advanced Materials

    R-455A Refrigeration: A Cold Storage Solution for the Future

  • Airex Rooftop Units
    Sponsored byAirex Manufacturing Inc

    Consolidating Roof Penetrations: A Growing Trend in Multifamily HVAC Design

Popular Stories

HVAC-Price-Increase-graphic

HVAC Price Increase List: June 2026

Trump-Section-232.jpg

Trump Reduces Section 232 Tariffs on HVAC Equipment to 15%

R410A-Refrigerant-Cylinder.jpg

Refrigerant Recovery is a Revenue Opportunity

Heat-pump-cutaway.jpg

PFAS Rules and A2L Building Codes Continue to Evolve

Kroger.jpg

Kroger to Spend $100 Million to Reduce Refrigerant Leaks

View The ACHR NEWS
Centennial Anniversary Timeline

The ACHR News Timeline Chart
Submit a Letter
Submit a letter to our editors.

Events

November 6, 2025

Next-Gen Data Center Cooling: HVAC Innovation and Real-World Solutions

On Demand As AI workloads and high-density computing push traditional cooling methods to their limits, the data center industry is accelerating the adoption of next-generation HVAC technologies.

June 9, 2026

Before You Go All In on AI: Set Up Your Business to Actually Win

In this webinar, we'll walk you through exactly what to get in place before you add AI to your business. You'll leave with a clear picture of where you stand today and a practical action plan to set yourself up for real results.

View All Submit An Event

Poll

Summer Staff

Are you fully staffed for the summer season?
View Results Poll Archive

Products

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

See More Products
A2L Refrigerants - Free Webinar - May 21, 2026

Related Articles

  • Btu Buddy 60: High Head Pressure and Power Consumption

    See More
  • Btu Buddy 40: High Head Pressure, Air in System

    See More
  • Btu Buddy 75: Water-Cooled Chiller With Low Charge

    See More

Related Products

See More Products
  • pewtpm.png

    Pressure Enthalpy Without Tears Manual

  • Manual Q.jpg

    Manual Q - Low Pressure, Low Velocity Duct System Design

See More Products

Related Directories

  • Condenser and Chiller Services

    Offers in-field eddy current inspection, remote video inspection, protective epoxy coatings and complete retubing service with tubes in stock.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing