West / Regional Reports

CEC Postpones Effective Date for Building Efficiency Standards

SACRAMENTO, Calif. - The California Energy Commission (CEC) has delayed to Aug. 1, 2009, the effective date for compliance with the 2008 Building Energy Efficiency Standards for Residential and Nonresidential Buildings (California Code of Regulations, Title 24, Part 6). According to the CEC, this change allows for all California code updates to have the same effective date.

The Air-Conditioning, Heating, and Refrigeration Institute (AHRI) notes the following key provisions in the 2008 Title 24 standard:

Split Air Conditioners and Heat Pumps
Subchapter 8, Section 151 (f) 7 A, which covers ducted split system central air conditioners and ducted split system heat pumps, requires that temperature measurement access holes and saturation temperature measurement sensors are installed for refrigerant charge measurements. In addition, a Charge Indicator Display (CID) that demands attention when the air conditioner fails to meet certain requirements shall be installed in a location clearly visible to the occupant and within one foot of the house thermostat.

Subchapter 8, Section 151 (f) 7 B, which also covers ducted split system central air conditioners and ducted split system heat pumps, requires that an airflow greater than 350 cfm/ton of nominal cooling capacity and a fan watt draw less than 0.58 W/cfm must be simultaneously demonstrated in every zonal control mode. A static pressure probe hole or a permanently installed static pressure probe in the supply plenum downstream of the air conditioning evaporator coil is also required.

Central Forced Air System Fans
Subchapter 8, Section 151 (f) 11 includes a requirement for central forced air system fans used in central fan integrated-ventilation systems to demonstrate a watt draw of less than 0.58 W/cfm in Air Distribution Mode.

Packaged Direct-Expansion Units
Subchapter 3, Section 125 covering nonresidential buildings requires that packaged direct-expansion units be equipped with fault detection and diagnostics (FDD). Air handling and zone terminal units are also required to be equipped with automatic FDD systems.

Residential appendix RA3.1.4.3.10 states that additional credit is available for verified low leakage ducts when a factory sealed air handler unit is installed. The manufacturer must certify to the commission that the unit has achieved a leakage rate of 2 percent or less.

Additional details may be found at the CEC Website at www.energy.ca.gov/title24/2008standards/.

Publication date: 02/02/2009

Did you enjoy this article? Click here to subscribe to The NEWS Magazine

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

2013 ACCA Conference & IE3 Expo

Photos from the 2013 ACCA Conference & IE3 Expo in Orlando, Fla.

Podcasts

Cade Clark, assistant vice president of government affairs for the Air-Conditioning, Heating & Refrigeration Institute (AHRI), gives a brief overview of the new version of the Shaheen-Portman bill, what AHRI thinks of the energy-efficiency legislation, and how it might affect the HVACR industry if it becomes law.
More Podcasts

THE MAGAZINE

ACHRNEWS

NEWS 05-20-13 cover

2013 May 20

Check out the weekly edition of The NEWS today!

Table Of Contents Subscribe

HVAC LEASING

Some HVAC contractors have introduced leasing programs for consumers. Do you think this is a viable option?
View Results Poll Archive

Clear Seas Research

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

DON'T MISS A THING

Magazine image
 
Register today for complete access to ACHRNews.com. Get full access to the latest features, Extra Edition, and more.

STAY CONNECTED

facebook icontwitter iconyoutube iconLinkedIn i con