Switching to CO2 is a long-term investment with environmental benefits and reduced operating costs, making it essential for contractors to learn about these systems in order to inform customers about their options.
To ensure safety, specifying engineers and contractors must educate themselves on A2L safety requirements and risk mitigation measures pertaining to applications, equipment, and component designs.
Solving frost or ice issues with a walk-in freezer is generally not difficult but will require a thorough inspection to find the root cause of the issue.
New York State has finalized its HFC regulations, which includes banning the sale of bulk high-GWP refrigerants. This could result in the inability to service commercial refrigeration equipment.
Wetzel pours his heart and soul into the industry, delivering classroom lectures, recording countless podcast episodes, and leaving his fingerprints on as many compressors as possible.