HVAC Breaking News

Nov. 28, 2003: Alternative And Renewable Energy Center Introduced

November 28, 2003
/ Print / Reprints /
ShareMore
/ Text Size+
MUSKEGON, Mich. - The Michigan Alternative and Renewable Energy Center (MAREC), a project designed to lead research into alternative and renewable energy solutions, has been announced by Grand Valley State University and Workstage LLC, a real estate development and design build firm. The 26,000-square-foot facility in Muskegon, Mich., is believed to be the first commercial building to receive 100 percent of its energy needs from alternative sources.

Fifty million consumers learned how vulnerable the U.S. power grid is during the 2003 power blackout. The Michigan Alternative and Renewable Energy Center aims to research and demonstrate alternative energy solutions that would avoid such widespread outages. Designed and constructed by Workstage, the facility will produce its own energy through photovoltaics, a fuel cell, and a nickel metal hydride battery storage system. As a result, MAREC will ultimately not rely on the U.S. power grid. The building will serve as a model for property management and facilities personnel concerned with protecting their buildings from future blackouts.

The MAREC facility incorporates underfloor air distribution. This can reduce energy consumption by 10 to 20 percent because less fan energy is required, says Workstage. The conditioned air is introduced at the occupant's level as opposed to a traditional HVAC system where the air is being pushed down. Other energy savings elements include windows that bring in natural light (daylight) and sensor-controlled interior lighting. The sensors measure the amount of light in a space, turning off fixtures where daylight is sufficient. Each of these systems are helping the facility receive the Gold LEEDâ„¢ (Leadership in Energy and Environmental Design) rating for green and sustainable buildings.

The building has been designed to accommodate future technology changes as well. It features a state-of-the-art operating platform, dubbed by Workstage as the "Stage", integrating HVAC, voice, data, and electrical cabling under a raised floor. Housing these systems at the floor level allows quick and easy access to all utilities, making changes in technology or space requirements happen in hours instead of days, says the company.

For more information, visit www.workstage.com.

Publication date: 11/24/2003

Did you enjoy this article? Click here to subscribe to The NEWS Magazine

Recent Articles by Greg Mazurkiewicz

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

2014 MCAA Annual Convention

Scenes from the 2014 MCAA Annual Convention in Scottsdale, Ariz.

Podcasts

NEWSmakers: Julian Scadden

Training is an ongoing process. Julian will discuss how you can generate maximum return on time and energy invested training by following a three part process. Listen to this podcast to get expert tips on training, tracking and follow up. 

More Podcasts

ACHRNEWS

NEWS 04-21-14 cover

2014 April 21

Check out the weekly edition of The NEWS today!

Table Of Contents Subscribe

SERVICE CALLS POLL

Which statement on service calls best applies to your business?
View Results Poll Archive

HVACR INDUSTRY STORE

plumbing-hvac.gif
2014 National Plumbing & HVAC Estimator

Every plumbing and HVAC estimator can use the cost estimates in this practical manual!

More Products

Clear Seas Research

 

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

DON'T MISS A THING

Magazine image
 
Register today for complete access to ACHRNews.com. Get full access to the latest features, Extra Edition, and more.

STAY CONNECTED

facebook icontwitter iconyoutube iconLinkedIn i con