- HOME
- MAGAZINE
- TOPICS
- EXTRA EDITION
- NEWS
- PRODUCTS
- COLUMNS
- EXCLUSIVES
- RESOURCES
- MULTIMEDIA
In fact, many of the manufacturer’s fire/smoke dampers met the new requirements in April 2001 — a year ahead of the July 2002 deadline.
The new UL standards are designed to increase damper reliability and ensure safer operation during a fire. To comply with the revised standards, smoke dampers must pass new heated air operation tests. New requirements mandate that dampers operate against a minimum airflow of 2,000 fpm and 4 in. wg pressure. Final ratings incorporate a safety factor of 400 fpm on airflow and 0.5 in. wg on pressure. All operation and leakage ratings now require testing with airflow in both directions through a damper. Cycle test requirements have been increased from 5,000 to 20,000 cycles. Similar requirements apply for fire damper closure tests.
Publication date: 06/18/2001


More
This overview of the benefits of zoning includes tips for selling to consumers and businesses. Tom Jackson discusses options for new construction and retrofit, as well as some ways a residential contractor can get into the light commercial business with zoning products. Speaker: Tom Jackson, CEO, Jackson Systems
With access to over one million professionals and more than 60 industry-specific publications, 




