EPA Announces Final HCFC Allocation, Equipment Rules

December 28, 2009
/ Print / Reprints /
ShareMore
/ Text Size+

The U.S. Environmental Protection Agency (EPA) recently announced final rules regarding HCFC-22 equipment installation and servicing as well as production allowances of HCFC refrigerants. This ends almost 12 months of waiting since the rules were first proposed. The rules take effect Jan. 1, 2010.

The final rules reflected many of the changes the HVACR industry had asked for after the proposed rules were first published Dec. 23, 2008. Those changes were initially addressed in an EPA clarification published last Jan. 14 and the final rules pretty much fell in line with the clarifications.

“This is a positive outcome,” said Talbot Gee, vice president of Heating, Airconditioning & Refrigeration Distributors International (HARDI).

“Our concerns were addressed in our favor,” said Charlie McCrudden, vice president of government relations for Air Conditioning Contractors of America (ACCA).

Both associations held teleconference or Webinar events on Dec. 14 to give their perspectives on the final rules.

Gee highlighted what he called the “most significant outcomes” as:

• Servicing of existing HCFC-22 a/c and refrigeration systems will not be interrupted.

• There will be “no impact on existing inventories of components manufactured before Jan. 1, 2010.

• New installation projects have a two-year grandfather period.

He noted there is “no restriction of any product manufactured prior to Jan. 1, 2010 if used for servicing.” McCrudden said that means “R-22 components in stock do not become worthless.”

The equipment rule does differentiate between appliances and components and what constitutes the manufactured date for each.

Gee said the rule defines appliances as products able to deliver refrigeration or air conditioning while components are items such as condensing units, line sets, compressors, and TEVs.

The intent of the EPA rules is to steer the industry away from new installations using R-22. In fact, McCrudden said the industry manufacturers have pretty much moved away from R-22 equipment for new installations.

Both Gee and McCrudden said the EPA did allow a grandfather period through Dec. 31, 2011 for new projects that had building permits or contracts in place before 2010 but stalled because of legal issues or the overall construction slowdown.

Regarding the allocation of R-22, the EPA final rule allows production of 110 million pounds of virgin R-22 in 2010, but then builds in year-by-year reductions through 2014, whereas there was some speculation that the allocation would stay at 110 million pounds yearly for the next five years until another major drop off in 2015. Some industry officials said they believed the yearly step down was to increase industry dependence on reclaimed refrigerant.

At the time of the phone and Webinar events, both ACCA and HARDI said they would prepare fact sheets to answer frequently asked questions regarding the final rules.

Publication date: 12/28/2009

Did you enjoy this article? Click here to subscribe to The NEWS Magazine

You must login or register in order to post a comment.

R-22

Edward R mc Cambridge
December 28, 2009
When the Government is involved we can count on a continuigline of extentions , retrenchments and obfuscation. The Government is incapable of rendering a definitive answer regarding any thing other tha collecting taxes,

R-22

Steven A. Fontana
December 28, 2009
..This is the Government clearly kicking the can down the road. Can I get a "yay" or a "nay"... I bet we could get a "Yay" on the raising of taxes for small business, and/or a pay raise for themselves in a heartbeat!

idea

Essay edit
September 19, 2010
The 2010 HCFC Allocation Rule The first of the two rules, the 2010 HCFC Allocation Rule, restricts HCFC production and limits imports of specific HCFCs between 2010 and 2014 in line with commitments to phase-down HCFC use under the Montreal Protocol, according to a statement issued by the EPA. I found at http://editingwritingservices.org/editing.php that over the next 5 years, the rule specifically focuses on the reduction of HCFC-22 by dropping allowances for import and production of the certain substances by more than 70 percent.

Multimedia

Videos

Image Galleries

2014 MCAA Annual Convention

Scenes from the 2014 MCAA Annual Convention in Scottsdale, Ariz.

Podcasts

NEWSmakers: Julian Scadden

Training is an ongoing process. Julian will discuss how you can generate maximum return on time and energy invested training by following a three part process. Listen to this podcast to get expert tips on training, tracking and follow up. 

More Podcasts

THE MAGAZINE

ACHRNEWS

NEWS 04-21-14 cover

2014 April 21

Check out the weekly edition of The NEWS today!

Table Of Contents Subscribe

SERVICE CALLS POLL

Which statement on service calls best applies to your business?
View Results Poll Archive

HVACR INDUSTRY STORE

plumbing-hvac.gif
2014 National Plumbing & HVAC Estimator

Every plumbing and HVAC estimator can use the cost estimates in this practical manual!

More Products

Clear Seas Research

 

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

DON'T MISS A THING

Magazine image
 
Register today for complete access to ACHRNews.com. Get full access to the latest features, Extra Edition, and more.

STAY CONNECTED

facebook icontwitter iconyoutube iconLinkedIn i con