Customizing, controlling, and specifying air handlers

July 11, 2000
/ Print / Reprints /
ShareMore
/ Text Size+
When your customer has very specific requirements, you don’t want a “not exactly” solution. It’s time for a custom unit.

Racan Industries, Inc., Montreal, joined Carrier Corp., Syracuse, N.Y., in a joint venture late last year to produce custom air-handlers for commercial-industrial applications. Racan’s custom units serve such markets as institutional, cleanroom, food, pharmaceutical, and others.

According to George Mastromonaco, sales and product manager for Racan, the custom air handler business “is a growing market,” with sales currently at $400 million to $450 million in the United States.

The individually designed air handlers are based on a specified combination of features. The key in this case is flexibility.

“You can include so much in custom air handlers,” said Mastromonaco.

Custom choices

To specify a custom unit, the following considerations need to be addressed:

  •  Will it be an indoor or outdoor unit?

    This choice depends on “preference and the application,” Mastromonaco stated. Outdoor units are selected to save space and for the aesthetics.

  •  What is the desired air volume? This defines the aspect ratio, the size of the unit.

  •  What type of application?

  •  Any size constraints? Don’t forget to consider jobsite rigging.

  •  What functions are desired? These may include:

  • Heating (hot water, steam, gas, or electric);

  • Cooling (DX or chilled water);

  • Availability of a central system (or do we need to do it ourselves);

  • Filtration (type of filter);

  • Humidification (stand-alone or use steam);

  • Dehumidification;

  • Return or supply fan;

  • Heat recovery; and

  • Maintenance considerations.

  •  What acoustical requirements — how close to occupied space will the unit be?

  •  Any vibration requirements for the structure?

  •  What type of fans?

  •  Any preferred construction (i.e., galvanized steel, stainless steel, coated, or aluminum)?

  •  Finally, what options are desired (receptacles, controls, bearing types, and whether to have piping done at the factory)?

It also has to be decided whether shipping will be one piece, multiple sections, or knocked down for assembly at the jobsite.

Custom air handlers can range from 2,000 cfm, which would be used for processing, up to 300,000 cfm, which would be applied for treating outside air in a large building, said Mastromonaco.

Maintenance access

In order for contractors to perform maintenance, you have to be able to readily access the air handler.

Sizing of access sections is important. Every piece of equipment has to be looked at “to size access doors and panels to make sure you have easy access,” remarked Mastromonaco.

Because, says Carrier, central station air handlers often rely on simple controls that can’t optimize performance, the company offers a package that it says improves control — the AirManager.

“The controller has pre-engineered algorithms for the application,” explained Mark J. Tozzi, controls product manager for Carrier.

It takes into account indoor and outdoor temperatures, humidity levels, and scheduling information to determine and initiate optimum operation.

Application rules are built into the program. It will suggest appropriate components and will flag if an error is made and assist in correcting the error.

Designing and specifying air handlers may have just gotten a bit easier for contractors.

Did you enjoy this article? Click here to subscribe to The NEWS Magazine

Recent Articles by Greg Mazurkiewicz

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

Mini Split Installation

Twin Cities contractor Aabott Ferraro helped retrofit an older St. Paul home.

Podcasts

NEWSMakers: Jeff Nusz

Jeff Nusz, president, Reitmeier HVAC Services, Tualatin, Oregon, joins the program to discuss how he modernized his website and gained new clients and more money because of it. We’ll go through the process of the change and much more.  Posted on Aug. 1.

More Podcasts

ACHRNEWS

NEWS 07-28-14 cover

2014 July 28

Check out the weekly edition of The NEWS today!

Table Of Contents Subscribe

R-22 PHASEOUT POLL

Some in the industry are calling for the EPA to halt production of R-22 as of 2015. What do you think?
View Results Poll Archive

HVACR INDUSTRY STORE

plumbing-hvac.gif
2014 National Plumbing & HVAC Estimator

Every plumbing and HVAC estimator can use the cost estimates in this practical manual!

More Products

Clear Seas Research

 

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

DON'T MISS A THING

Magazine image
 
Register today for complete access to ACHRNews.com. Get full access to the latest features, Extra Edition, and more.

STAY CONNECTED

facebook icontwitter iconyoutube iconLinkedIn i con