ACHR News
search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
ACHR News
  • NEWS
    • Breaking News
    • New HVAC Products
    • Featured Products
    • Manufacturer Reports
    • HVAC Data
    • Legislation
    • ACHR NEWS Centennial
  • RESIDENTIAL
    • Air Conditioners
    • Furnaces
    • Residential Heat Pumps
    • Ductless
    • Residential IAQ
    • Testing, Monitoring, Tools
    • Components & Accessories
  • COMMERCIAL
    • Air Handlers
    • Rooftop Units
    • Chillers and Cooling Towers
    • Commercial Heat Pumps
    • Boilers and Hydronics
    • VRF/Ductless
    • Commercial IAQ
  • REFRIGERATION
    • Refrigerants
    • Refrigerant Regulations
    • Leak Management
  • CONTRACTOR PRO
    • Geothermal
    • Homeowner Study
    • VRF and VRV Ductless
    • Unitary Trends
  • EDUCATION
    • Training and Education
    • Business Management
    • Service and Maintenance
    • Continuing Education
    • Market Research >
      • HVAC Brand Awareness Report
      • VRV, VRF, VRVZ Report
      • Unitary Trends Report
      • Water Heat Professionals Report
    • Webinars
    • Sponsor Insights
    • eProducts Info
    • White Papers
  • EVENTS
    • HVAC Contractor Forum
    • Industry Events and Webinars
  • MEDIA
    • Videos
    • AHR Expo 2025 Videos
    • Podcasts >
      • ACHR News Podcast
      • HARDI Podcasts
      • AHR Expo Podcasts
      • ACCA Podcasts
    • Interactive Spotlights
    • Quizzes
    • eBooks
    • HVAC Talkback
  • HVAC GROUP
    • ACHR NEWS >
      • Current Issue
      • Digital Edition
      • Subscribe
    • Distribution Trends
    • SNIPS NEWS >
      • Join SNIPS NEWS
    • Engineered Systems News >
      • Join ES News
    • HVACR Directory
    • Contests
    • Newsletters
    • Contact
    • Advertise
    • My Account

Comparing The Design-Build Processes

By John R. Hall
February 17, 2005
Contractors have choices to make before they take on design-build projects. Simply, the choices revolve around whether the project is design-build or a similar process - namely design-bid-build or construction at risk.

By comparing these three processes, it may become clearer as to which closely matches the goals of the contractor and the customer - the building owner. And comparisons can also lead to a better understanding of which process may be the most profitable and time-efficient. Let's take a look at all three.

Design-build - In this process, the building owner contracts directly with one company to perform the design and construction of a system. This allows the owner to have one single touch point during the entire design and construction process.

Design-bid-build - In this process, the building owner contracts separately with a designer and a contractor. The owner asks the designer to provide all of the design work while he or she then solicits fixed-price bids from contactors to perform the construction work. Once the design is completed, the construction contractor is selected and has no input on the design.

Construction management at risk - In this process - similar to design-bid-build - the building owner contracts separately with the designer and the construction contractor. The construction contractor performs construction management and work, for a fee. This contractor usually has input in the design process.

The Comparison

These processes were evaluated by Victor Sanvido, a senior vice president for Southland Industries, Irvine, Calif., using data he accumulated from studying different projects.

Sanvido said that the average unit costs of design-build projects was more than 6 percent less than design-bid-build and 4.5 percent less than construction management at risk projects. He added that the cost of construction management at risk projects was almost 2 percent less than design-bid-build.

"Design-build projects average at least 12 percent faster than design-bid-build and 7 percent faster than construction management at risk in terms of construction speed," said Sanvido.

"When adding the impact of facility design, on average, design-build projects were found to be delivered at least 33.5 percent faster than design-bid-build projects and 23.5 percent faster than construction management at risk projects."

Looking for quick answers on air conditioning, heating and refrigeration topics? Try Ask ACHR NEWS, our new smart AI search tool. Ask ACHR NEWS →

School Projects

Sanvido analyzed 39 school projects in which all three processes were used. Design-bid-build was used for 24 projects, design-build for seven projects, and construction management at risk for six projects.

He said that school projects usually have a high unit cost. In fact, in many cases, these costs run higher than some corporate or complex office structures. The reason: schools are higher traffic buildings with more specialized areas. The approval process is more complex, too - and takes longer than projects in the private sector, according to Sanvido.

Sanvido said that schools using design-build have a lower value of cost growth than do other school projects. "In general, these school projects, regardless of project delivery method, are fairly close to the industry median of 3.05 percent [cost growth]. Cost growth refers to the rate at which projects exceed the original budget.

"Schedule growth for all three processes are closer in terms of percentage schedule growth with exception to construction management at risk. The industry median for schedule growth is 0 percent."

He said that his study reaffirmed that the design-build projects "carry the most certainty in terms of scheduling."

"That may be the nature of the beast however. Schools have a more cumbersome approval process, as individuals involved in the decision making are not normally involved in construction issues - and decisions are not made as quickly."

Sanvido's research came about while he was a professor at Penn State University. The resulting information was subsequently published and is considered a leading work in the field of commercial delivery process comparisons. Design-build has a definite edge in cost control once a project has begun, and it appears to be growing in popularity as more building owners become familiar with the various benefits.

Publication date: 02/21/2005

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

John Hall is the Business Editor. E-mail him at johnhall@achrnews.com.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Commercial Market
    By: Joanna R. Turpin
Subscription Center
  • Create an Account
  • Start a Subscription
  • Manage My Account
  • Sign Up for Newsletters
  • Visit Customer Service
  • Update Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to The News audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The News or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Piggy Bank
    Sponsored byWatercress Financial

    Energy Prices, Inflation, and HVAC: What Today’s Homeowners Care About

  • Refrigerated Food
    Sponsored bySolstice Advanced Materials

    R-455A Refrigeration: A Cold Storage Solution for the Future

  • Airex Rooftop Units
    Sponsored byAirex Manufacturing Inc

    Consolidating Roof Penetrations: A Growing Trend in Multifamily HVAC Design

Popular Stories

HVAC-Price-Increase-graphic

HVAC Price Increase List: June 2026

Trump-Section-232.jpg

Trump Reduces Section 232 Tariffs on HVAC Equipment to 15%

R410A-Refrigerant-Cylinder.jpg

Refrigerant Recovery is a Revenue Opportunity

Heat-pump-cutaway.jpg

PFAS Rules and A2L Building Codes Continue to Evolve

Kroger.jpg

Kroger to Spend $100 Million to Reduce Refrigerant Leaks

View The ACHR NEWS
Centennial Anniversary Timeline

The ACHR News Timeline Chart
Submit a Letter
Submit a letter to our editors.

Events

November 6, 2025

Next-Gen Data Center Cooling: HVAC Innovation and Real-World Solutions

On Demand As AI workloads and high-density computing push traditional cooling methods to their limits, the data center industry is accelerating the adoption of next-generation HVAC technologies.

June 17, 2026

Decarbonization Without Disruption

This webinar will explore practical HVAC decarbonization strategies that minimize disruption while maximizing long-term performance and ROI.

View All Submit An Event

Poll

Summer Staff

Are you fully staffed for the summer season?
View Results Poll Archive

Products

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

See More Products
Decarbonization Without Disruption - Free Webinar - 6/17/2026

Related Articles

  • design build

    10 Reasons Why the Design-Build Delivery Method Works

    See More
  • Design-Build Institute of America

    Design-Build Institute of America Honors the Nation’s Best Design-Build Projects

    See More
  • Tomorrow's Environment

    A Six-step Business Plan that Showcases the Benefits of Design-build

    See More

Related Products

See More Products
  • bsctppm.png

    Brazing & Soldering: Copper Tubing and Processes

  • 9781439842126.jpg

    Heat Exchanger Design Handbook, Second Edition

  • DUCT DESIGN.gif

    HVAC Systems Duct Design

See More Products

Related Directories

  • Climate by Design International

    CDI designs and manufactures desiccant dehumidifiers and critical process air handlers. Optional patent NoThruMetal design meets demand of low temperature environments without condensing.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing