ACHR News
search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
ACHR News
  • NEWS
    • Breaking News
    • New HVAC Products
    • Featured Products
    • Manufacturer Reports
    • HVAC Data
    • Legislation
    • ACHR NEWS Centennial
  • RESIDENTIAL
    • Air Conditioners
    • Furnaces
    • Residential Heat Pumps
    • Ductless
    • Residential IAQ
    • Testing, Monitoring, Tools
    • Components & Accessories
  • COMMERCIAL
    • Air Handlers
    • Rooftop Units
    • Chillers and Cooling Towers
    • Commercial Heat Pumps
    • Boilers and Hydronics
    • VRF/Ductless
    • Commercial IAQ
  • REFRIGERATION
    • Refrigerants
    • Refrigerant Regulations
    • Leak Management
  • CONTRACTOR PRO
    • Geothermal
    • Homeowner Study
    • VRF and VRV Ductless
    • Unitary Trends
  • EDUCATION
    • Training and Education
    • Business Management
    • Service and Maintenance
    • Continuing Education
    • Market Research >
      • HVAC Brand Awareness Report
      • VRV, VRF, VRVZ Report
      • Unitary Trends Report
      • Water Heat Professionals Report
    • Webinars
    • Sponsor Insights
    • eProducts Info
    • White Papers
  • EVENTS
    • HVAC Contractor Forum
    • Industry Events and Webinars
  • MEDIA
    • Videos
    • AHR Expo 2025 Videos
    • Podcasts >
      • ACHR News Podcast
      • HARDI Podcasts
      • AHR Expo Podcasts
      • ACCA Podcasts
    • Interactive Spotlights
    • Quizzes
    • eBooks
    • HVAC Talkback
  • HVAC GROUP
    • ACHR NEWS >
      • Current Issue
      • Digital Edition
      • Subscribe
    • Distribution Trends
    • SNIPS NEWS >
      • Join SNIPS NEWS
    • Engineered Systems News >
      • Join ES News
    • HVACR Directory
    • Contests
    • Newsletters
    • Contact
    • Advertise
    • My Account
Regional ReportsEast

Boston Station's Retrofit Improves IAQ and Savings

May 12, 2008

BOSTON - Extending the TD Banknorth Garden’s commuter foot traffic area 100 feet into the adjacent train shed relieved congestion, but it took innovative HVAC engineering and architecture to make the retrofit an energy-saving and aesthetic solution.

Previously, thousands of mass transit commuters were funneled into the congested lobby/walkway area of the Massachusetts Bay Transit Authority’s (MBTA’s) North Station terminal inside the TD Banknorth Garden, the home of the NHL’s Boston Bruins and NBA’s Boston Celtics. The multi-million-dollar expansion, developed and funded by Delaware North Companies Inc. (the owner the TD Banknorth Garden), now greets commuters with an energy-efficient indoor environment thanks to air curtains, proper building pressurization, and an innovative HVAC supply soffit system.

Previously, the MBTA’s narrow, 30-foot-wide lobby/walkway area’s traffic spilled over into the automatic entry door sensor zones, causing exterior sliding double doors to remain open continuously during rush hours. This resulted in significant energy losses into the open-ended train shed. While the renovation’s main objective was better traffic flow and a roomier waiting area, controlling energy losses through more efficient doorways was also a major concern.

“We knew going into this project that one of the greatest challenges was saving energy for the client because many doors would be constantly open from continuous foot traffic,” said Jeffrey Fleishman, HVAC project engineer, Cosentini Associates, Cambridge, Mass.

The team’s solution was a build-out of the lobby 100 feet into the 200-foot-long by 260-foot-wide train shed. In the redesign, the existing 12 sliding commuter doors were moved out 100 feet and incorporated into a new curtain wall. Designed by architect firm Sasaki Associates Inc., Boston, and built by the project’s general contractor, Tishman Construction Corp., Boston, the perimeter soffit aesthetically caps the curtain wall and conceals electric, HVAC piping, ductwork, fire safety, and other utilities.

The soffits also became receptacles for housing 12 high-efficiency In-Ceiling Mount air curtains by Berner International, New Castle, Pa. The 72-inch-wide In-Ceiling Mounts complemented Sasaki Associates’ aesthetics for the new entrance area; they’re completely recessed into the bottom of the soffit and appear only as decorative white aluminum grills. Each 3,624-cfm air door distributes a maximum 3,500-fpm stream of air angled directly down toward the floor, thus cold (or hot in the summer) train shed air and fumes can’t infiltrate the receiving area.

“Obviously, energy savings and performance were important factors in choosing air curtains, but equally important was the aesthetics,” said Fleishman, who had previously specified air curtains only for industrial applications. “The sliding doors can stay open for hours and very little train shed air infiltrates the space due to the combination of air curtains and space pressurization.”

HEATED CURTAINS

Cosentini utilized Berner’s factory-installed coil/filter combination options offered on many of its models, thus the In-Ceiling Mount units all have hot water coils that tap into the soffit’s heating supply loop. The 95,600-Btuh coils supplement the new entrance area’s main HVAC system by providing thermostatically controlled heating near the door areas, when needed.

The air curtains also include the Comfort Plus Control package, which includes a thermostat, three-speed fan with maintenance access from an onboard control panel, a timer delay function, and a low-voltage relay for tapping into any DDC system, such as TD Banknorth Garden’s BAS system by Siemens Building Technologies.

The control package offers TD Banknorth Garden two units for the price of one; an air curtain performance/wind stopping unit when the door is open, plus a cabinet heater or low velocity and low noise with high heat output when the door is closed.

Summer operation uses the air curtain’s recirculation mode. Whereas most air curtain air inlet designs recirculate hot, humid air from above, in In-Ceiling Mount air inlet efficiently draws cooler tempered air from the floor area.

LOOP DESIGN

When TD Banknorth Garden replaced the former Boston Garden building in 1995, a heating loop was installed to supply conventional cabinet heaters, which were later cancelled because of the high equipment and operational costs combined with the inefficiency of that technology in that application. At a huge cost savings to the terminal retrofit, the Cosentini design team tapped off of that existing heating loop to supply the air curtains. An existing Bryant boiler and twin 40-hp. pumps by Bell & Gossett, Morton Grove, Ill., supplies the loop. Cosentini also provided a performance study on the loop’s capacity prior to construction.

The previous doorways were significant energy losers, according to Fleishman’s preconstruction energy observations. Conversely, keeping heat in and cold winter weather out with air curtains in the new terminal area is saving the building owner a significant amount of energy. Matt Freitas, sales engineer at manufacturer’s representative, Equipment Direct Sales, Randolph, Mass., provided sizing, energy-saving estimations, and design assistance for Cosentini on the air door portion of the project.

To heat-cool the entire new space, the design team specified a 14,900-cfm McQuay International makeup air handler installed by Walsh Mechanical, Abington, Mass., in the TD Banknorth Garden mechanical room, which already had an outdoor air shaft for access. The HVAC system installation’s most difficult challenge was running the 200-foot-long supply duct through a congested mechanical room and down an aisle of ice rink compressors that needed service accessibility clearance.

Exposed metal ductwork with registers distributes heating or cooling down the center of the new waiting area. The air handler is sized and designed to heat/cool the space to a design temperature of 72°F with a 200-person capacity occupancy. The air curtains’ heating function supplements the indoor air comfort.

Part of the project’s engineering work also included Cosentini’s review and rebalancing of several existing supply pressurization fans controlled by carbon monoxide (CO) sensors. The fans needed calibration and rebalancing to keep the train shed’s emergency ventilation system updated to ensure that they activate and provide a positive pressure when excessive CO is detected.

While the train shed’s emergency ventilation system is designed with positive pressure, the new receiving area has also been designed with positive pressure. This pressurization is an engineering challenge, according to Fleishman, because there are no doors or barriers separating the new area from the rest of the TD Banknorth building.

Because of aesthetic advancements in air curtain design and the Cosentini design team’s attention to energy savings, the new mass transit rail station at the TD Banknorth Garden is a functional, aesthetic facility that provides commuters with indoor air comfort as well as energy savings for its owners.

Publication date: 05/12/2008

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Residential Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Heat Pumps
    By: Joanna R. Turpin
Subscription Center
  • Create an Account
  • Start a Subscription
  • Manage My Account
  • Sign Up for Newsletters
  • Visit Customer Service
  • Update Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to The News audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The News or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Piggy Bank
    Sponsored byWatercress Financial

    Energy Prices, Inflation, and HVAC: What Today’s Homeowners Care About

  • Refrigerated Food
    Sponsored bySolstice Advanced Materials

    R-455A Refrigeration: A Cold Storage Solution for the Future

  • Airex Rooftop Units
    Sponsored byAirex Manufacturing Inc

    Consolidating Roof Penetrations: A Growing Trend in Multifamily HVAC Design

Popular Stories

HVAC-Price-Increase-graphic

HVAC Price Increase List: June 2026

Trump-Section-232.jpg

Trump Reduces Section 232 Tariffs on HVAC Equipment to 15%

Heat-pump-cutaway.jpg

PFAS Rules and A2L Building Codes Continue to Evolve

Midea-training.jpg

HVAC Workforce Crisis Expands Beyond Technicians to Instructor Shortages

U.S. Supreme Court building

95% Furnace Efficiency Rule to Get New Hearing

View The ACHR NEWS
Centennial Anniversary Timeline

The ACHR News Timeline Chart
Submit a Letter
Submit a letter to our editors.

Events

November 6, 2025

Next-Gen Data Center Cooling: HVAC Innovation and Real-World Solutions

On Demand As AI workloads and high-density computing push traditional cooling methods to their limits, the data center industry is accelerating the adoption of next-generation HVAC technologies.

June 17, 2026

Decarbonization Without Disruption

This webinar will explore practical HVAC decarbonization strategies that minimize disruption while maximizing long-term performance and ROI.

View All Submit An Event

Poll

Summer Staff

Are you fully staffed for the summer season?
View Results Poll Archive

Products

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

See More Products
Decarbonization Without Disruption - Free Webinar - 6/17/2026

Related Articles

  • Boston Rail Station Retrofit Solution: Air Curtains Used in Green Design

    See More
  • Case In Point

    Natatorium improves IAQ, spectator comfort with dehumidification retrofit

    See More
  • Case In Point

    Heater retrofit gets auto company on the road to better IAQ, energy savings

    See More

Related Directories

  • TRION IAQ

    Trade NamesAir Bear®Air Boss®ComfortSteam®Forever Filter®Grease Viper™Herrdraulic®Herricane®Herrmersion®Herrmidicool®Herrmidifier®Herrmidisteam®Herrtronic®Trion®
  • Attic Tent Inc.

    The Attic Tent ® saves energy by creating an air-tight barrier, stopping air in/exfiltration; improves IAQ, HVAC efficiency and home comfort; simple installation, profit making products.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing