search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Home » Topics » Engineered Systems NEWS » HVAC Retrofits

HVAC Retrofits
HVAC Retrofits RSS Feed RSS

CALCULATING LIFE-CYCLE COST

Calculating Life-Cycle Cost

Detailed calculations can unearth hidden savings.
Paul Avery
September 6, 2011
Whether at work or in our personal lives, we all try to be smart shoppers. We’ll go that extra mile to save a few percent on upfront purchase costs but every so often miss the big picture by not taking total cost of ownership (TCO) into account.
Read More
Chicago Board of Trade Building
Case In Point

Financial exchange trades up to modular fan system

September 6, 2011
Located in this city’s famous Loop commercial center, the 600-foot-tall Chicago Board of Trade Building (CBOT) houses the world’s oldest futures and options exchange. Until recently, the building also housed a pair of aging built-up systems that were beginning to worry management.
Read More
LA Building
Case in Point

Plastic cooling tower prevents tenant meltdown during heat wave

September 6, 2011
Last September, on what would normally have been a mild autumn day, Southern California was blasted by a record-breaking heat wave with temperatures spiraling upwards to 116°F in the Los Angeles basin. The heat was far above the normal highs, which would typically be in the mid-70s.
Read More
Retrofits and O&M

Building Oversight Management: Revisited

Larry Clark
August 1, 2011
A lot has happened since the author’s 2008 article. It’s prime time to revisit expectations for BAS and chiller optimization controls, and then have a look at several of today’s options for anyone managing chilled water flow to wring the last drop of efficiency out of a system.
Read More
Heating and Boilers
Case In Point

Modular boilers give bottling operation a taste of higher efficiency, lower emissions

August 1, 2011
Innovation has thrived in Philadelphia since Ben Franklin invented bifocals, the lightning rod, and the wood stove that bears his name more than two centuries ago. This tradition of innovation
Read More
Government
Case In Point

Renovating HVAC systems at Air Force Base achieves energy goals

August 1, 2011
Two energy recovery units saved this Air Force Base hangar $24,500 in heat recovery costs. United States Air Force personnel sought a solution to renovate the makeup air and exhaust
Read More

Low-Hanging Fruit In The Data Center Orchard

August 1, 2011
Forget high-tech or high-expense fixes for a minute. Have you tried to bump efficiency by looking for the  next aisle over, deploying a Trim and Respond strategy, or trying the soon-to-be-famous Paper On A Stick approach? Some of the biggest names in the data center universe think that you plant the seeds of real savings with some mighty simple steps.
Read More
IAQ

Solving Indoor Airborne Disease Transmission Problems

Steven Welty
August 1, 2011
The author describes how toilet flushes aerosolize germs sending them airborne to soar around and infect their next victim(s) because bathrooms are designed backwards. Learn novel ways to control and clean bathroom air to help control airborne disease transmission problems. So feel free to hold your nose as you learn about how you can help protect people’s health within your client’s buildings.
Read More
Healthcare

Better Project Delivery: Health Care Infrastructure Projects

Howard McKew, P.E., C.P.E.
July 1, 2011
Here, our long-time forward-thinking columnist uses a common hospital scenario to walk you through the shift from Design-Bid-Build to an Integrated Project Delivery approach. See how the job can get done with similar personnel on a considerably shorter schedule, resulting in a greater team investment in the project’s success and yet more time to get on to other work.
Read More

Editor's Note: Sharp Ideas

Robert Beverly
July 1, 2011
Getting an acceptable ROI from this event is like finding a needle in a needlestack.
Read More
Previous 1 2 … 33 34 35 36 37 38 39 40 41 42 Next

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing