In April of 2011, the University of Utah broke ground on a renovation to consolidate multiple production centers into a central multi-tier data center in support of their diverse program mix, which includes the university’s Center for High-Performance Computing (CHPC).
NYC Health + Hospitals, The LiRo Group, and the New York Power Authority (NYPA) have completed the installation of an antimicrobial cooling tower in New York City.
Overby-Sheppard Elementary in Richmond, Virginia, needed more than an HVAC upgrade, but with tight budgets and minimal state funding, it didn’t seem likely. The 40-year-old building needed a full overhaul to provide students with a healthier, distraction-free environment.
The opening of a new school is an exciting time. Seeing reactions from students and educators the first time they walk through the door and watching as community members celebrate their investment in education fuels my passion for designing K-12 education environments that inspire students to excel.
This month’s Facility File will focus on the B2B April test for a K-8 school temporary heating project in sync with a utility rebate to furnish and install a new 120 boiler horsepower (BHP) condensing boiler application.
A building’s hydronic HVAC system is rarely just the sum of its parts. The system is comprised of chillers, boilers, pumps, VFDs, AHUs, and valves that create a loop through which water is circulated to control the building’s temperature and its occupants’ comfort.
The design and magnitude of a new residential indoor pool built onto a 21,000-square-foot, 100-year-old home named “Daybreak” in Montclair, New Jersey, confronted mechanical engineers with psychrometric and sustainability challenges on par with huge commercial indoor waterparks.