BIM, creative pre-fabrication, and even some on-site disassembly/reassembly teamed up with excellent design coordination and communication at the Harry S. Truman Presidential Library & Museum. As a result, the new central chilled water plant and dehumidification system will preserve priceless collections for the future.
Understand the thinking behind a system that blends condensing and non-condensing boilers, from the attack on oversizing to a controls strategy that shifts with the weather.
In the October 2017 issue, three dehumidification methods for health care were introduced (“Dehumidification For Health Care”): low temperature DX, low temperature glycol, and desiccant dehumidification.
Boston Medical Center (BMC), a comprehensive medical facility providing inpatient, outpatient, and emergency care in the heart of the city’s historic South End, needed to address challenges associated with a merger which resulted in a split campus configuration.
Founded in 1837 and named after the only physician to sign the U.S. Constitution — Benjamin Rush — Rush University Medical Center (RUMC) is now Chicago’s second-largest hospital, with multi-story buildings that dominate the city’s medical district.
Although thoroughly tested and proven, PEX is still sometimes misunderstood by mechanical contractors and engineers.
February 1, 2018
More than 17 billion feet of PEX, or crosslinked polyethylene, has been installed worldwide. That’s enough to stretch to the moon and back almost seven times.
For the past 20 years, the Wilkes County Courthouse in Wilkesboro, NC, has depended on its chiller system. The courthouse had been reliably cooled with a Daikin ALS170A screw compressor chiller, but the unit was beginning to show signs of aging.