MONTH 3- The Energy Conservation Opportunity: Process Heating for an Industrial Building Application - Solution Implementation and Monitor, Measure, and Benchmarking
Putting a new boiler in is a lot more complicated than just putting a new boiler in. You’re often taking ownership for any problem, real or potential, anywhere in the hydronics system.
Designing a commercial boiler replacement where you were not the original designer or installer might have some hidden dangers that could haunt you for years.
Reviewing documents, sizing equipment and systems, and sketching on the go: got an app for that? Also, we compare tablet vs. phone and the advantages or worries that come with taking your tablet into imperfect field conditions. How do you use yours?
After a brief hiatus, we are resuming exploration of the tablet as engineering tool. In the first article, we examined the energy study and how the tablet can facilitate tasks such as annotating existing documents, taking notes, and storing and accessing documents.
This month and in the next three months, I will be sharing my experience pertaining to a design engineer who is responsible for the construction administration of the project he just completed the design for, with construction underway.
The Air Movement and Control Association International announced that the 2015 version of the International Energy Conservation Code will contain a provision enabling air curtains to be considered as an alternative to vestibules.
High plug loads and rapidly advancing IT technology make data center applications significantly different from their commercial building counterparts, according to ASHRAE.