search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsCommissioningHVAC RetrofitsCommercial HVAC

Commissioning: WHAT IS Accessible?

By Rebecca T. Ellis, P.E.
June 1, 2011

As noted in last month’s column, accessibility to mechanical, electrical, and control system components is critical for sustainable systems operation. However, the design and construction industry is sorely lacking when it comes to agreeing on what appropriate accessibility means. In order to make a meaningful difference in how systems are delivered to owners/operators, it is critical to define measurable accessibility acceptance criteria early in the design phase and allow the commissioning professional to shepherd that criteria through the design, construction, and acceptance phases.

A FEW SUGGESTIONS

What are some possible quantitative and enforceable criteria? This column will outline a few ideas and, hopefully, generate some reader feedback with other options.

Most project specifications generically require that all equipment be installed per the manufacturer’s installation instructions. In some cases, this might be enough to define accessibility requirements in terms of clearances around the equipment. Finding such clearances is typical in the installation manuals for boilers, chillers, furnaces, switchgear, generators, etc. I’d like to see similar minimum clearance requirements (above, below, to the sides, etc.) for VAV terminal units, fancoil units, control sensors, and devices. Manufacturers should be most knowledgeable regarding required maintenance and repair activities and the space requirements to perform them.

This could be challenging for the manufacturer if the equipment has the option of coming with factory-installed controls. If the controls are manufacturer provided and factory-mounted, the manufacturer’s installation manual should be able to define the accessibility requirements. However, it is very common, especially with VAV terminal units, to have the manufacturer’s factory install a different vendor’s control devices. In that case, which vendor would be responsible for defining the clearance requirements to access the control panel and/or devices?

Does the responsibility fall on the design team to define specific clearance requirements for all equipment and controls, just in case the manufacturers fail to provide that information in their manuals? Perhaps, to be safe, it does. How does the design team know what is required, if they do not typically operate, maintain, or repair equipment? Clearly, the owner/operator should be consulted with respect to their expectations for accessibility.

Are there any universal criteria that might cover all equipment and devices? Is there a minimum “clear zone” required for a person to get to and manipulate a device regardless of size, type, and location? Would it be 24 in. above and/or below and 24 in. on one or more sides? Generically, 24 in. clear in all directions around any piece of equipment or device seems reasonable for human access, but it is probably unrealistic from an architectural space efficiency perspective.

Therefore, it seems necessary to qualify the requirements to be something like, “24 in. above and to one side of a device needing service from above,” or “24 in. below and to one side of a device needing service from below.”

It is important to remember that if a device needs to be serviced from above or below, the side clearance is critical in order to allow a maintenance person to actually get to the “above” or “below” clear area. Similarly, if a device only needs service from the side, a vertical clear path needs to be maintained for personnel to access the side of the device.

Another quantitative requirement to consider is distance from the floor. Something mounted too close to the floor may be hard to access for proper service, and we all know how something too high above the floor can make maintenance activities too dangerous, too disruptive, and/or too expensive to perform safely. I have seen installations where VAV boxes were mounted 14 ft above the floor on the underside of the floor above, with lots of clear area around them. The problem was the lay-in ceiling at 9 ft above the finished floor, through which a ladder could not safely be erected to reach the VAV boxes. Perhaps the most generic requirement for installation height would be in terms of the ability of a 5-ft-tall person to stand safely on an x-foot ladder with his head at the same elevation as the device needing service.

A more subjective criterion would be a requirement that the general contractor demonstrate safe access to all equipment requiring future maintenance and repair. Whenever there is a dispute about accessibility during construction and/or the turnover process, the onus would be on the contractor to show the owner/operator how the future work would need to be performed. The requirement would be for reasonable, safe, and affordable access. This is less enforceable than measurable criteria, but it is a universal requirement that could be easily added to the general conditions section(s) of any project specification.

I look forward to collecting additional accessibility criteria ideas from readers; hopefully, there will be enough to fill another column in the near future.  ES

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Residential Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Commissioning

    Commissioning Action Lists: What Is Too Long?

    See More
  • Commissioning

    What Is Substantial Completion?

    See More
  • cash on hand

    Working Capital 101: What is it and What is it Used For?

    See More

Related Products

See More Products
  • new cover.jpg

    Profit is An Attitude: The Strategies You Need to Optimize Profits

  • The ACHR NEWS - March 16, 2026

    ACHR NEWS March 16, 2026, Issue

See More Products

Events

View AllSubmit An Event
  • May 21, 2026

    The A2L Genie is Out of the Refrigerant Canister – What Now?

    On Demand Join this webinar to learn about key updates to refrigerant regulations. We will cover practical installation and servicing content gathered from thousands of our interactions with contractors across the US and Canada.
View AllSubmit An Event

Related Directories

  • AABC Commissioning Group (ACG)

    The AABC Commissioning Group (ACG) is a non-profit dedicated to advancing independent commissioning professionals through education, training, and certification since 2004.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing