ACHR News
search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
ACHR News
  • NEWS
    • Breaking News
    • New HVAC Products
    • Featured Products
    • Manufacturer Reports
    • HVAC Data
    • Legislation
    • ACHR NEWS Centennial
  • RESIDENTIAL
    • Air Conditioners
    • Furnaces
    • Residential Heat Pumps
    • Ductless
    • Residential IAQ
    • Testing, Monitoring, Tools
    • Components & Accessories
  • COMMERCIAL
    • Air Handlers
    • Rooftop Units
    • Chillers and Cooling Towers
    • Commercial Heat Pumps
    • Boilers and Hydronics
    • VRF/Ductless
    • Commercial IAQ
  • REFRIGERATION
    • Refrigerants
    • Refrigerant Regulations
    • Leak Management
  • CONTRACTOR PRO
    • Geothermal
    • Homeowner Study
    • VRF and VRV Ductless
    • Unitary Trends
  • EDUCATION
    • Training and Education
    • Business Management
    • Service and Maintenance
    • Continuing Education
    • Market Research >
      • HVAC Brand Awareness Report
      • VRV, VRF, VRVZ Report
      • Unitary Trends Report
      • Water Heat Professionals Report
    • Webinars
    • Sponsor Insights
    • eProducts Info
    • White Papers
  • EVENTS
    • HVAC Contractor Forum
    • Industry Events and Webinars
  • MEDIA
    • Videos
    • AHR Expo 2025 Videos
    • Podcasts >
      • ACHR News Podcast
      • HARDI Podcasts
      • AHR Expo Podcasts
      • ACCA Podcasts
    • Interactive Spotlights
    • Quizzes
    • eBooks
    • HVAC Talkback
  • HVAC GROUP
    • ACHR NEWS >
      • Current Issue
      • Digital Edition
      • Subscribe
    • Distribution Trends
    • SNIPS NEWS >
      • Join SNIPS NEWS
    • Engineered Systems News >
      • Join ES News
    • HVACR Directory
    • Contests
    • Newsletters
    • Contact
    • Advertise
    • My Account
Service and MaintenanceHVAC Commercial MarketBoilers and Hydronics

Wiring Basics for Residential Gas Boilers

October 10, 2000
Figure 1: A 240-V circuit breaker panel.


Figure 2: Circuit breaker panel with a switch.
For some reason, heating system wiring seems to mystify some people, especially my plumber friends. (I can pick on plumbers; I’ve been one for 25 years.) Most plumbers plug in their droplights and that’s the end of their electrical capabilities.

The next group I’m going to pick on are the electricians. I don’t want to get into trouble for picking on people, so here is a little story to back me up.

Figure 3: From left-normally open (NO) and normally closed (NC) electric symbols.

DEFECTIVE BOILERS

One time I had a buddy with 90 “defective” boilers; this was the guy who forgot to check the gas meters. The next time he called me he had 265 defective boilers.

Of course, my first question was, “Do you have gas?” After I got called some nasty names, we proceeded with the questioning. I asked him if he had 110 V to terminal L1 and L2. This is always our starting point, making sure the electricity is turned on. I got the classic answer: “How do I know, I’m only a plumber.”

I asked to speak to the electrician, who confirmed that he had power to L1 and L2. I asked what the voltage was; sometimes you have lower voltage and the system won’t work. He confirmed that he had 120 V. Next, I asked him if he had continuity through the control circuit.

His answer was, “I’m a union electrician, I put power to the boiler and hook up thermostats; I don’t know about boiler wiring.” It was time for a field visit.

When I got to the jobsite, I checked the voltage for myself. I then went to the terminals marked T1 and T2. I installed a jumper and the boiler started right up. I now had the plumber and electrician standing there with a look of amazement on their faces.

I removed the jumper and walked over to the thermostat that our friend the electrician installed. I turned it all the way up — nothing. I knew the chance of 265 defective thermostats was as slim as 265 defective boilers, but I removed it from the wall and touched the wires together — still nothing. I left the wires crossed and was going to go back to the boiler and check the wire for continuity, but my way I saw two wires sticking out of the wall. I asked what they were; no one knew.

I placed a jumper on them and the boiler started. It seems that the electrician hooked the thermostat to the house intercom system — all 265 units had the thermostat wired to the intercom. The clocks even worked, since the intercoms were 24 V.

Looking for quick answers on air conditioning, heating and refrigeration topics? Try Ask ACHR NEWS, our new smart AI search tool. Ask ACHR NEWS →

Now let’s learn some really basic stuff.



Figure 4: Boiler-to-circuit breaker wiring diagram.

THE SIMPLE LIGHTBULB

I’m going to start with a lightbulb, make it work, then add a switch and explain how it all works together.

On our lightbulb, L1 and L2 are the 120-V power source used to light the bulb. L1 is commonly referred to as the hot line and L2 as the neutral. L2, the neutral, will always be white; L1, the hot, will usually be black, but it can be any color except white, gray, or green. To make the bulb light, we have to complete a circuit from the power source with the electricity “flowing” from the source, through the hot wire, through the bulb, and back to the source through the neutral.

The 120-V source is usually a fuse or circuit breaker box. In residential applications, 120 V is needed for smaller appliances and lighting circuits. Some residential applications, such as electric water heaters, stoves, clothes dryers, and air conditioners, may require 240 V.

Most homes built after 1960 have a 240-V electrical service using circuit breakers. This is accomplished by bringing two 120-V lines through a meter into a circuit breaker panel. A third neutral line is also brought to the circuit breaker or service panel. Each hot leg feeds alternate breakers to supply 120 V to their respective circuits.

When 240 V are needed, a double circuit breaker is connected to each leg or phase to give us a 240-V line. Figure 1 shows a 240-V circuit breaker panel.



Figure 5: Steam boiler safety devices.

CIRCUIT BREAKER PANEL

Once the panel is in the house, a white wire is attached to the neutral bar and the line wire is attached to the breaker.

Now let’s go back to our bulb. It’s attached to the panel box and the bulb is shining bright. How do we shut it off? We install a switch. (See Figure 2.) Notice that the switch is on the hot line.

Let’s look at the “flow” of the electricity again. If we break the circuit on the L2 or neutral side, the flow will stop and the light will go out, but there will be power at the light even when it is not lit. This is very important; if someone climbed on a ladder and touched one of the wires going to the light, he would get a shock. With the switch on L1 or the hot side, we interrupt the power before it gets to the light.

Next we are going to change the name of the lightbulb. We are just going to call it the “load.”

The load can be anything, a lightbulb, motor, gas boiler, or furnace. When we take a normal wall switch and turn it to the off position, we “open” the circuit. When the circuit is open, no electricity is “flowing” to the load.

When we work on heating systems, our controls become switches. We have two types of switches, normally open and normally closed. To determine if a switch is normally opened or normally closed, you must determine its position with no outside force applied. The outside force can be manual, pressure, or temperature.

A pressure control on a steam boiler is a normally closed switch. With no pressure applied, the switch is in the closed position and the boiler operates; when the pressure climbs, the switch opens and the boiler shuts off.

Figure 3 shows the symbols you will see for normally open and normally closed switches. Once you understand what these symbols mean, you can figure out the operation of each control.



Figure 6: Gas valve with 24-V terminal block.

WIRING THE BOILER

The load is now a boiler. (See Figure 4, page 20.) This wiring diagram shows 120 V coming from L1 of a circuit breaker, through a switch, powering a boiler control and returning through L2, back to the neutral bar of the circuit breaker box.

This is fine if the boiler is 120 V. However, most gas boilers you will be working on have 24-V controls. To get from 120 V to 24 V we use a transformer. A transformer does just what its name implies: It transforms voltage. If we’re going from a higher voltage to a lower voltage we use a step-down transformer; from a low voltage to a higher voltage, we use a step-up transformer.

A transformer is an iron core with windings placed on either side in relationship to the voltage reduction or increase. If we are going from 120 V to 24 V, we will have one-fifth as many windings on the 24-V side as on the 120-V side. This is the type of transformer you will find powering a gas valve. If we are going from 120 V to 10,000 V, we will have the amount of windings on the 120-V side times 83.333 to get the higher voltage. This is the type of transformer we will find on an electronic ignition.

Now let’s wire our boiler using a 24-V transformer.

The way this boiler is running now, we turn the switch on, the boiler runs turn it off, and the boiler shuts down. This obviously is not acceptable. The boiler would run constantly and would not be safe.

Different types of systems have different safety devices. A steam boiler (Figure 5) would have a pressure control as a high-limit control, a low-water cutoff as a safety device, and a thermostat setting the comfort level. There will also be a rollout switch, a flue spill switch, and a flue damper. Any wiring diagrams I show you will be for a standing pilot.

Before we wire the system, let’s look at a gas valve (Figure 6). This is what the terminal block looks like on a 24-V standing pilot gas valve. Bringing power to terminals TR and TH energizes the coil, which allows the flow of gas. Terminal TH/TR is a common terminal and is just a splicing point; no power is introduced to the valve at this point.

Now let’s wire our boiler with its gas valve. I’m going to remove the panel box and just discuss L1 and L2, the primary power going to the transformer.

Our boiler now has 120-V primary power going through a switch to a transformer supplying 24-V secondary power to the gas valve. All boilers and hot air furnaces that are vented through chimneys will have a spill switch, rollout switch, and flue damper. The flue damper motor is wired separately at terminals 1 and 4. When it proves open, it completes the 24-V circuit to the gas valve through terminals 2 and 3. Note: The vent damper has to prove open to close the control circuit through terminals 3 and 4.

All natural draft boilers will have a spill switch and a flame rollout switch. A spill switch is a thermal switch that is placed at the flue draft diverter; in the event of a blocked chimney this device opens an electrical circuit that turns off the flow of gas.

NEXT WEEK: We finish up the boiler wiring job.

This article was excerpted from The Complete Guide to Residential Gas Heating by Richard Bruno, an instructor in Nassau County BOCES, Nassau County, NY, and at the Suffolk County BOCES, Suffolk County, NY. He can be reached at 718-668-0180.

Publication date: 10/16/2000

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Commercial Market
    By: Joanna R. Turpin
Subscription Center
  • Create an Account
  • Start a Subscription
  • Manage My Account
  • Sign Up for Newsletters
  • Visit Customer Service
  • Update Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to The News audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The News or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Piggy Bank
    Sponsored byWatercress Financial

    Energy Prices, Inflation, and HVAC: What Today’s Homeowners Care About

  • Refrigerated Food
    Sponsored bySolstice Advanced Materials

    R-455A Refrigeration: A Cold Storage Solution for the Future

  • Airex Rooftop Units
    Sponsored byAirex Manufacturing Inc

    Consolidating Roof Penetrations: A Growing Trend in Multifamily HVAC Design

Popular Stories

HVAC-Price-Increase-graphic

HVAC Price Increase List: June 2026

Trump-Section-232.jpg

Trump Reduces Section 232 Tariffs on HVAC Equipment to 15%

Refrigerants-and-gauge.jpg

HVAC Industry Warns of Counterfeit Refrigerants Entering U.S. Supply Chain

Midea-training.jpg

HVAC Workforce Crisis Expands Beyond Technicians to Instructor Shortages

U.S. Supreme Court building

95% Furnace Efficiency Rule to Get New Hearing

View The ACHR NEWS
Centennial Anniversary Timeline

The ACHR News Timeline Chart
Submit a Letter
Submit a letter to our editors.

Events

November 6, 2025

Next-Gen Data Center Cooling: HVAC Innovation and Real-World Solutions

On Demand As AI workloads and high-density computing push traditional cooling methods to their limits, the data center industry is accelerating the adoption of next-generation HVAC technologies.

June 17, 2026

Decarbonization Without Disruption

This webinar will explore practical HVAC decarbonization strategies that minimize disruption while maximizing long-term performance and ROI.

View All Submit An Event

Poll

Summer Staff

Are you fully staffed for the summer season?
View Results Poll Archive

Products

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

See More Products
Decarbonization Without Disruption - Free Webinar - 6/17/2026

Related Articles

  • Back to Basics for Residential Companies

    See More
  • A.O. Smith Water Products Co.: GAS BOILERS

    See More
  • Lochinvar Corp.: Commercial Gas Boilers, Water Heaters

    See More

Related Products

See More Products
  • ghpm.png

    Gas Heating: Furnaces, Boilers, Controls, Components

  • HVACR Troubleshooting Fundamentals  Electrical Book Cover Image.jpg

    HVACR Troubleshooting Fundamentals: Electricity and Wiring Diagrams

  • Lessons Learned Servicing Boilers

See More Products

Events

View AllSubmit An Event
  • April 10, 2014

    Hydronics for High Efficiency Wood-fired and Pellet-fired Boilers

    The workshop is lead by John Siegenthaler, who is a principal, Appropriate Designs,  a licensed professional engineer. and has over 32 years of experience in designing modern hydronic heating systems, and has presented workshops  in the U.S., Canada, and Europe.
View AllSubmit An Event

Related Directories

  • Velocity Boiler Works

    Velocity Boiler Works manufactures high-quality residential and commercial gas fired condensing and non-condensing boilers, oil boilers, indirect water heaters, buffer tanks and oil-fired warm air furnaces.
  • Pelican Wire

    Pelican Wire is an employee-owned manufacturer of Resistance Wire, Thermocouple Wire & custom wire solutions for application-specific designs.
  • Lattner Boiler Manufacturing Co.

    Lattner manufactures electric steam and hot water boilers as well as gas-fired steam boilers and blowdown separators.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing