HVAC Breaking News

June 29, 2010: Updated Labor Units Reference Manual for Sheet Metal and HVAC Now Available

CHANTILLY, Va. - The Sheet Metal and Air Conditioning Contractors’ National Association (SMACNA) has announced that its newly updated SMACNA Reference Manual for Labor Units for Sheet Metal and HVAC is now available. The manual provides labor units data for fabricating and installing HVAC materials and equipment. Previously titled the Cost Reference Manual, it lists the national average amount of man-hours required to fabricate and/or install a given quantity of each item under project specific conditions ranging from “normal” to “very difficult.”

“The manual will help SMACNA members quantify their labor hours based on different scenarios - because no two projects are the same,” said Rick Freeman, executive vice president of Stromberg Metal Works Inc. of Beltsville, Md. “Using the manual, you grade the difficulty of the project to more accurately determine the amount of labor required.”

The manual contains a 30-page introduction in pdf format that is embedded in an Excel spreadsheet and features a Quick User Guide. An electronic spreadsheet calculates and adjusts the data for specific project types and unique site characteristics. Based on data entered, the spreadsheet will categorize the project’s level of difficulty as “normal,” “difficult,” or “very difficult.”

It provides 138 tables, based on surveys of active sheet metal and air conditioning contractors in the U.S. and Canada, including actual data from numerous projects, along with U.S. government statistics and scholarly reports and journals. The document also offers links to a variety of industry reports and studies on site and project conditions.

Duct materials of all common types are covered separately for fabrication and installation rates by pounds, per hour or hours per piece; fittings and accessories are listed separately, as are reinforcements, tie rods, and hangers.

Freeman noted that the manual is especially useful for change orders and helps the contractor educate the owner on why the price is what it is. “It can quantify the cost, based on the factors entered,” he said. “You can print out the spreadsheet and walk the customer through the project, letting them know the circumstances encountered and what the labor factor would be. It will help to justify the labor costs on each specific change order.”

The manual is available free to members on the Business/Project Management page of the SMACNA website at www.smacna.org/management/. It is also available to non-members for $475.

For more information, contact Tom Soles, SMACNA’s executive director for member services and market sectors, at tsoles@smacna.org.

Publication date: 06/28/2010

Did you enjoy this article? Click here to subscribe to The NEWS Magazine

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

Manufacturer-Based Training

The manufacturers creating new HVAC technologies are teaching others all about it.

Podcasts

Kara Saul Rinaldi, executive director with the National Home Performance Council (NHPC) introduces the NHPC and discusses a recently released white paper focused on properly developing the home-performance industry.
More Podcasts

THE MAGAZINE

ACHRNEWS

NEWS 06-17-13 cover

2013 June 17

Check out the weekly edition of The NEWS today!

Table Of Contents Subscribe

GEOTHERMAL SYSTEMS

Have you considered adding geothermal to your HVAC contracting business?
View Results Poll Archive

Clear Seas Research

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

DON'T MISS A THING

Magazine image
 
Register today for complete access to ACHRNews.com. Get full access to the latest features, Extra Edition, and more.

STAY CONNECTED

facebook icontwitter iconyoutube iconLinkedIn i con