Newsline

ACCA And ASHRAE Cooperate On Standard

June 30, 2005
/ Print / Reprints /
ShareMore
/ Text Size+
ARLINGTON, Va. - A new standard for determining load calculations will be developed by American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) in cooperation with the Air Conditioning Contractors Association of America (ACCA), according to a joint statement from the organizations.

Proposed Standard 183P, "Methods and Procedures for Performing Peak Heating and Cooling Load Calculations," released by ASHRAE for public comment in May, will be processed through ASHRAE's standards writing procedures as an American National Standard.

As part of the agreement to cooperate, the membership of the ASHRAE 183P committee will be expanded to include three members nominated by ACCA, and the proposed standard will reference the cooling load temperature difference (CLTD) load calculation method provided in ACCA's Manual N.

ACCA has announced it will withdraw its intent to submit a revision to its Manual N "Load Calculations for Non-Residential Buildings, Three Stories and Less" as an American National Standard.

"A single standard for nonresidential load calculation procedures will improve the accurate determination of system and equipment sizes for all types of buildings," said ASHRAE president Ronald Vallort, P.E. "Having ACCA's cooperation in development of the ASHRAE standard reflects the importance of having HVAC contracting and engineering communities work together in areas of mutual interest."

The proposed standard will be designated ANSI/ASHRAE/ACCA Standard 183 when approved.

"ACCA's goal is to ensure that contractors have access to the most accurate, efficient, and effective design standards," said Greg Leisgang, ACCA chairman. "It is ACCA's intent to assure that the proposed standard meets the needs of contractors who would use this standard for light commercial building load calculations."

The proposed standard will be further developed by the expanded project committee to incorporate the recommendations of both organizations.

Proposed Standard 183P does not dictate a particular load calculation method or program but does establish a minimum level of care that would apply to any method. The proposed standard seeks to establish the criteria of an appropriate calculation process that will result in an accurate estimate of the air-conditioning and heating load in a building.

Publication date: 07/04/2005

Did you enjoy this article? Click here to subscribe to The NEWS Magazine

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

2014 Energy Efficiency Forum

Highlights from the 25th annual Energy Efficiency Forum in Washington, D.C.

Podcasts

NEWSMakers: Mark Satterfield

Mark Satterfield, founder and CEO of Gentle Rain Marketing Inc. and author of “The One Week Marketing Plan” talks about his book and the importance of HVAC blogging. Posted on Sept. 19.

More Podcasts

ACHRNEWS

NEWS 09-15-14 cover

2014 September 15

Check out the weekly edition of The NEWS today!

Table Of Contents Subscribe

Venting R-22

The NEWS reported that a man received prison time for venting R-22. Should EPA step up enforcement?
View Results Poll Archive

HVACR INDUSTRY STORE

plumbing-hvac.gif
2014 National Plumbing & HVAC Estimator

Every plumbing and HVAC estimator can use the cost estimates in this practical manual!

More Products

Clear Seas Research

 

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

DON'T MISS A THING

Magazine image
 
Register today for complete access to ACHRNews.com. Get full access to the latest features, Extra Edition, and more.

STAY CONNECTED

facebook icontwitter iconyoutube iconLinkedIn i con