search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • PRODUCTS
  • SHEET METAL
    • Fabrication
    • Workers
    • Machinery
    • Architectural Sheet Metal
    • Metal Roofing
  • OTHER TOPICS
    • Duct Sealing & Cleaning
    • Spiral Duct
    • Shop Layout
    • Steel Reports
  • EDUCATION
    • Columns
    • Apprenticeship Reviews >
      • Submit Review
    • Sheet Metal Unions Map
    • Sheet Metal History
    • History of SNIPS NEWS
    • Webinars
  • DIRECTORY
  • MORE
    • Newsletter
    • eMagazine
    • Videos
    • Podcasts
    • Quiz
    • SNIPS NEWS Store
    • Contractor of the Year
    • Sponsor Insights
  • SIGN UP
  • Back to The NEWS
Home » Authors » Howard McKew, P.E., C.P.E.

Articles by Howard McKew, P.E., C.P.E.

Tomorrow's Environment

Hydraulic Modeling: A Time-Management Solution For All Phases

This overlooked tool can keep the job moving on all ends.
Howard McKew, P.E., C.P.E.
April 9, 2017

Hydraulic modeling is seldom used in the day-to-day design of closed-loop or open-loop heating and cooling systems.


Read More
Temporary HVAC System Design: How Does this Work?

Temporary HVAC System Design: How Does this Work?

Evolving facility needs, revenue-generating special events, in-house labor, the deferred maintenance budget … the factors in a temporary HVAC decision range wider than you might think. So are the opportunities.
Howard McKew, P.E., C.P.E.
April 4, 2017

Engineers who pull out the 2015 ASHRAE Handbook HVAC Applications or 2016 HVAC System and Equipment Handbook will not find the topic of temporary HVAC systems.


Read More
Tomorrow's Environment

Thoughts On Engineering A Piping System

A closed-loop water system may look easy enough, but that vision evaporates quickly if you forget some key design details.
Howard McKew, P.E., C.P.E.
March 3, 2017

Years after an HVAC engineer starts to design closed-loop water systems and then progressively moves up the ladder of engineering success, he can forget and/or overlook many of the issues, concerns, details, opportunities, etc. associated with engineering these systems.


Read More
Tomorrow's Environment

Passing the Quarter-Century Mark

Twenty-five years of challenging the HVAC industry and asking ‘what if?’
Howard McKew, P.E., C.P.E.
February 2, 2017

With last month’s publication, Engineered Systems magazine and I completed the 25th year of publishing this column.


Read More
Tomorrow's Environment

When Reusing An Existing Open-Loop Water System

An engineering checklist (regularly updated and improved on) can help to simplify these design installations.
Howard McKew, P.E., C.P.E.
January 2, 2017

How often does an existing open condenser water system, or some other type of open water system, get reused as part of a building renovation project and/or mechanical system upgrade


Read More
Tomorrow's Environment

Reusing An Existing Closed Loop Water System

These installations are quite commonplace, but they usually lack a proper checklist.
Howard McKew, P.E., C.P.E.
December 6, 2016

How often does an existing closed loop hot water heating or chilled water cooling system get reused as part of a building renovation project, and/or used to expand the area served by the system coverage to provide additional heating or air conditioning?


Read More
Tomorrow's Environment

Outsourcing Infection Control

Given the chance, third-party IC could go a long way in maximizing patient health care.
Howard McKew, P.E., C.P.E.
November 1, 2016

This month, the focus is on high-performance health care, and so it got me thinking about IAQ and infection control (IC) within hospi-tals.


Read More
Back 2 Basics image

Commercial Building Chiller Retrofit Using Integrated Project Delivery

Howard McKew, P.E., C.P.E.
October 10, 2016

This month’s B2B will focus on an 80,000-sq-ft existing commercial office building in need of replacing its two air-cooled chillers.


Read More
Tomorrow's Environment

Another Niche Business: Consulting 3rd-Party TAB

It’s a mystery why firms already handling 3rd-party commissioning don’t offer this, too.
Howard McKew, P.E., C.P.E.
October 9, 2016

This past August, I wrote in this column about the opportunity to invest in a niche business providing temporary HVAC design and construction administration.


Read More
Back 2 Basics image

Campus Retrofit: Administration Building HVAC Replacement Construction Management Project

Howard McKew, P.E., C.P.E.
September 9, 2016

This month’s B2B will focus an existing campus administration building renovation.


Read More
Previous 1 2 … 7 8 9 10 11 12 13 14 15 … 18 19 Next

More Videos

SNIPS NEWS Buyers Guide
Explore Carlisle HVAC Insights

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing