search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering TechnologyHVAC Engineering SectorsHVAC RetrofitsHeating & BoilersCooling & ChillersCommercial HVAC

Hydraulic Modeling: A Time-Management Solution For All Phases

This overlooked tool can keep the job moving on all ends.

By Howard McKew, P.E., C.P.E.
Tomorrow's Environment
April 9, 2017

Hydraulic modeling is seldom used in the day-to-day design of closed-loop or open-loop heating and cooling systems. I believe this is because engineers are too busy cranking out contract drawings and not focusing on looking ahead at the big picture.

Analogous to CAD when it first came out years ago, CAD was a drafting tool. It’s since been proven to be a design tool, a.k.a. computer-aided design drafting. Producers of this software, through research and development, expanded the programs’ ability to serve not only the design community but also the construction industry and facility management. One often overlooked feature of the software is its time management feature when the original consultant firm’s set-up person layers the computer-generated drawing. For example, drawn once, a piping system layout starts out showing the pipe distribution with a separate layer to show only pertinent components such as shut off valves, equipment, or control devices to mention three useful layers for the HVAC contractor and/or the facility technician.

Without going into all the features of drawing something once and then utilizing this drawing for numerous other design engineering needs, as well as letting others (e.g., estimator, field fabrication coordinator, emergency planner, service technician) use the CAD drawing in lieu of regenerating the drawing to meet their needs/obligations, let’s just agree this software is a time management tool. The same applies to time management using hydraulic modeling.

For the designer. Computer-generated model/drawing: Once done, change the program input and value-engineer pipe sizes based on a different water supply-return Delta T. Value engineer the type of material from steel pipe (2.5 in and larger) to soldered copper pipe, avoiding additional costs associated with welding.

Facility manager. Using the base drawings, sign off on shutoff valve locations and isolation of piping zones.

HVAC contractor. Using the same drawing, complete the job estimate while looking for potential value added savings opportunity. In the initial phase of construction, this drawing can be fine-tuned into an as-built drawing rather than prequalify it as a Record Drawing (which is different from as-built).

Mechanical-electrical coordinator. The use of this piping drawing overlaid with sheet metal fabrication, electrical, etc., can provide field coordinated documents before the trade contractors fabricate their systems, so they can identify any changes/conflicts to this system layout that could affect the hydraulic model.

Third-party TAB. Using the same drawing and the hydraulic data (GPMs, velocities, pressure drops, and pipe size), designate where TAB readings will be taken, include in TAB final report, and provide the design engineer with actual hydraulic data to update the initial hydraulic model for future use (e.g., system alterations and/or extension to a building addition).

Automatic controls. Using the drawing, the control submittal can indicate where devices and sensors should be located for optimum performance. The control technician can document as-built conditions and use this drawing(s) for system owner-operator training.

Facility management-emergency plan. Using the same drawings showing the shutoff valves, a building manager can train the operators on where to go for isolating a section of piping and/or piece of equipment, should a break occur.

Facility management-calibration, repairs, and testing. Using the same drawing showing the control components, a building manager is better prepared to respond to system problems (e.g., bad control device).

Facility management-bar coded equipment. With the equipment on a layer of its own, import a bar code that will link the maintenance person to the piece of equipment shown on the drawing, and the software program can bring up the work order from the CMMS program.

With a creative, open mind, I’m sure there are numerous other features to be included in this design-it-once CAD/hydraulic modeling document. That said, once the design engineer uses a single computer-generated hydraulic model of the piping system overlaid on an architectural drawing, I have referenced five other users for this same drawing. Each user will save an estimated minimum 40 hrs of unnecessary labor to reuse rather than recreate this document for their specific needs. But more importantly in this computer age, a hydraulic model is the 21st-century time saving tool that CAD software was to the building industry in the 20th century. ES

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Howard McKew is author of Integrated Project Delivery for Building Infrastructure Opportunities for HVAC consultants and mechanical contractors and can be reached at hmckew@bss-consultant.com or at www.buildingsmartsoftware.com. 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Residential Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    News
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • WorkSeekers - April 2, 2001: Veteran in All Phases of the Trade Looking for a New Challenge.

    See More
  • TE-mini-cover.jpg

    Hydraulic modeling for central chilled water plants

    See More
  • Feb. 7, 2014: Lucid, Rainforest Partner on Real-Time Energy Management Solution

    See More

Related Products

See More Products
  • Building Information Modeling: Planning and Managing Construction Projects with 4D CAD and Simulations

  • Service-Management-Excellence-Image-2A.jpg

    Service Management Excellence

  • ttabppftpfront.png

    PEAK Performance for the Technical Professional

See More Products
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing