search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Home » Topics » Engineered Systems NEWS » HVAC Design/Construction Process

HVAC Design/Construction Process
HVAC Design/Construction Process RSS Feed RSS

Tomorrow's Environment

Streamlining Decentralized HVAC System Contract Documents -- Part One

The benefits to these designs are many, but so are the challenges.
Howard McKew, P.E., C.P.E.
March 4, 2018

Quite often, design engineers choose decentralized HVAC systems because of first-cost benefit, packaged equipment, simplicity of design, and the repetitiveness of the installation, to mention just a few of the features.


Read More
Hybrid Hydronic Systems

Hybrid Hydronic Systems

Ray Wohlfarth
Ray Wohlfarth
February 9, 2018

Understand the thinking behind a system that blends condensing and non-condensing boilers, from the attack on oversizing to a controls strategy that shifts with the weather.


Read More
Uponor logo

Why choose PEX-a for hydronic piping applications?

Although thoroughly tested and proven, PEX is still sometimes misunderstood by mechanical contractors and engineers.
February 1, 2018

More than 17 billion feet of PEX, or crosslinked polyethylene, has been installed worldwide. That’s enough to stretch to the moon and back almost seven times.


Read More
Commissioning

The Right Time For Testing

Rebecca T. Ellis, P.E.
February 1, 2018

When every project and system is unique, there may not be a “correct” time.


Read More
Commercial Kitchen Ventilation: Design Challenges

Commercial Kitchen Ventilation: Design Challenges

Complex space/pressure relationships, grease management issues, and outside consultants represent just part of the recipe that the mechanical engineer must master.
Steven G. Liescheidt
Steven G Liescheidt P.E., CCS,
January 9, 2018

Commercial kitchen ventilation (CKV) has been a challenge to mechanical engineers for years. Part of the challenge comes from the fact that the mechanical engineer is normally not the “kitchen consultant.


Read More
Facility Files

Commercial Office Building Retrofit To Radiant Heat Design-Bid-Build Project

New Construction Using Construction Management Project Delivery
Amanda Parolise
January 7, 2018

This month’s B2B will focus on a new 12-story patient tower located at a health care campus.  This month’s test will address the design intent of an engineered zoned smoke control of return air, supply air, and exhaust air system serving the patient floor common corridors.


Read More
Commissioning

Incompatible Incentives & Penalties

Sometimes, chasing a bonus too aggressively can cost money.
Rebecca T. Ellis, P.E.
January 4, 2018

In the commissioning specification, the owner made the general contractor responsible for the cost of retesting required due to deficiencies discovered during initial functional performance testing.


Read More
Tomorrow's Environment

Thank You: Building Relationships

In 2018, show your clients how much you appreciate their business.
Howard McKew, P.E., C.P.E.
January 3, 2018

Can I get a big, “THANK YOU?” I’d like to start the New Year on a positive note since I’m a person who always looks at the “glass half full.”


Read More
Commissioning

Commissioning Is Not MEP Coordination

It’s nice to be brought in early, but less nice to be confused for a general contractor.
Rebecca T. Ellis, P.E.
December 4, 2017

Commissioning is far from being “business as usual” in the design and construction world. I was reminded of this fact recently when a building owner expressed the expectation that the commissioning professional would be responsible for subcontractor coordination, workflow planning, and installation start-up scheduling.


Read More
Facility Files

Commercial Office Building Retrofit To Radiant Heat Design-Bid-Build Project

Amanda Parolise
December 2, 2017

This month’s B2B will focus on the renovation of the office space (not part of B2B test) and replacement of the building’s existing baseboard radiation to new overhead radiant heat panels to be installed in the ceiling around the perimeter of the single-story 40,000-sq-ft building.


Read More
Previous 1 2 … 111 112 113 114 115 116 117 118 119 … 140 141 Next

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing