search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessHigh-Performance Buildings & AutomationCommissioningCommercial HVAC

Incompatible Incentives & Penalties

Sometimes, chasing a bonus too aggressively can cost money.

By Rebecca T. Ellis, P.E.
Commissioning
January 4, 2018

I recently heard about a large new construction project where the commissioning process hit a snag because of apparently conflicting construction contract clauses. In one part of the contract, the installation contractors were offered a bonus for completing the project by a certain date (earlier than the base scope requirement). In the commissioning specification, the owner made the general contractor responsible for the cost of retesting required due to deficiencies discovered during initial functional performance testing.

The commissioning professional was not aware of the incentive, and the contractors, as it turned out, may not have been aware of or may not have remembered the penalty. As the early completion date approached, the contractors exerted tremendous pressure on the commissioning professional to perform the functional performance testing. The commissioning professional resisted, pointing out that all of the system readiness prerequisites were not yet documented as complete. In particular, the TAB report, even in preliminary draft form, was not available.

The contractors implored the commissioning professional to conduct the testing anyway, assuring the commissioning professional that the systems were, indeed, ready for testing. The contractors specifically stated that their request was due to the bonus available for early completion. This was the first time the commissioning professional was made aware of this incentive.


The testing did not go well. There were more than 10 deficiencies on every major AHU unit (not including terminal units) and scores of failures on the life safety and emergency power systems. Clearly, the systems were not ready for successful testing.


In the interest of being team players, the commissioning professional agreed to proceed with testing. I am not sure if the commissioning professional pointed out to the contractors that they would be responsible for the cost of retesting if the systems were actually not ready for commissioning.

The testing did not go well. There were more than 10 deficiencies on every major AHU unit (not including terminal units) and scores of failures on the life safety and emergency power systems. Clearly, the systems were not ready for successful testing.

Based on what I understand from the commissioning professional, the general contractor pressured the mechanical and electrical contractors to be ready for testing, and the mechanical and electrical subcontractors told the controls and life safety system contractors to be ready. However, “telling” the controls and life safety contractors to finish their installation, perform point-to-point checkouts, and write code for the custom programs is not the same as coordinating the entire construction team to ensure these “last” contractors have sufficient time to successfully complete their work. The same is true for the TAB contractors who need the air and water systems installation to be complete, the controls to be functional, and a number of general construction elements (such as ceiling installation and cleaning) to be finished.

When it came time for retesting, the contractors pushed back about paying for it. The general contractor wanted the commissioning professional to assign retesting responsibilities/costs to individual subcontractors. The commissioning professional refused to do that because the commissioning specification put the retesting onus on the general contractor and only the general contractor could determine, based on their specific subcontracts, how and if they wanted to back charge their subcontractors. It was important to remember that the commissioning professional was a third party tasked with impartially testing the systems and factually reporting the results. The commissioning professional has no authority to provide design and/or construction direction or to otherwise influence contractual agreements between other parties on the project.

The contractor’s pushback resulted in hours of painstaking discussions, written communications, fingerpointing, and negotiations, all of which did nothing to improve systems performance or bring the project closer to completion.  

Was the early completion incentive bonus incompatible with the retesting penalty? I do not think so. However, the contractors needed to take both contract clauses seriously and understand that early completion included early commissioning success. This meant coordinating the entire project team to achieve both goals simultaneously.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Ground Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Are R-404A and Mineral Oil Incompatible?

    See More
  • Seafood Companies to Pay Nearly $500,000 in Penalties Due to Refrigerant Releases

    See More
  • Refrigerant Cylinders

    EPA Issues HFC Allowances — and Penalties — for 2025

    See More

Related Products

See More Products
  • The ACHR News - November 17, 2025

    ACHR NEWS November 17, 2025, Issue

See More Products

Related Directories

  • Encentiv Energy

    Incentive Experts! Are you looking for an incentive to lower your product cost? Reach out to us!
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing