search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessCommissioningCommercial HVAC

The Right Time For Testing

By Rebecca T. Ellis, P.E.
Commissioning
February 1, 2018

When is the best time to functionally test new systems? Some of the common answers to that question are:

  1. Do not test until a system is complete and ready for testing.
  2. Do not test one system until the systems on which that system relies have been successfully tested.
  3. Test as soon as both one and two have been achieved in order to stay off the project schedule’s critical path.

Part of the challenge is defining “systems,” assuming, by definition, that there is a one-to-one relationship between a system and its functional performance test (FPT). For example, does an “air handling system” include the air handler, return fan, all terminal units served by that air handler, and all smoke/fire dampers and other fire alarm devices? If that is the “system,” it will be very late in the project when all of those elements and supporting subsystems (fire alarm, chilled water, heating hot water, steam, etc.) are complete and ready for testing.

If each air handler, each terminal unit, and each fire/smoke damper are defined as a system with associated AHU FPTs, terminal unit FPTs, and fire/smoke damper FPTs, then there is more flexibility on the timing of the individual system tests. However, breaking systems up into smaller elements could lead to imperfect or at least inefficient testing of the integration of those elements.


At first blush, it seems like it would be best to wait until all systems are complete and ready for testing before any testing is performed. This theoretically allows for the most efficient and effective testing of individual systems and their interactions with each other. However, it is a bad time to find performance problems that need to be corrected.


On the other hand, there are efficiencies associated with testing some systems earlier than later. For example, confirming smoke/fire damper operation is more efficient if it is performed after the lay-in ceiling grid is installed but before the tiles are in place. It is much easier to access the dampers for visual observation of proper damper operation without needing to find the right ceiling tile (which could involve moving and climbing a ladder two to three times if labeling is not complete yet), lifting the tile out of the way, and then replacing it.

The same could be suggested for testing above-ceiling terminal units such as VAV boxes. However, VAV boxes would not be ready for testing that early because balancing is a prerequisite to functional testing, and ceilings typically must be in place for air balancing to be performed. 

At first blush, it seems like it would be best to wait until all systems are complete and ready for testing before any testing is performed. This theoretically allows for the most efficient and effective testing of individual systems and their interactions with each other. However, it is a bad time to find performance problems that need to be corrected. The further into the construction process, the more costly and time consuming corrective actions are likely to be.

In addition, most of the installing contractors are no longer fully engaged (because the installation is complete) and it is harder to rally appropriate resources to correct problems in a coordinated and timely fashion. Combine this with the fact that today’s construction projects all have a tight timeframe (“time is money”) and there is no room for a standalone “testing phase.” Waiting until after construction to start testing is almost never a viable strategy.

Finally, the normal electrical power system is invariably the first system to be tested in a new construction project. This is because it is a common prerequisite system that needs to be tested and operational well before testing all other commissioned systems. In addition, many of the electrical power tests cannot reasonably be performed after energization of the building.

In summary, there is no single “right” time to perform functional performance tests. Commissioning scheduling needs to be customized for each project and its unique collection of systems to achieve a balance of efficiency, effectiveness, and coordination with the contractor’s installation and start-up sequencing.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Air Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Commissioning

    The Right Time For Test Procedure Development (Part 1)

    See More
  • Commissioning

    The Right Time For Test Procedure Development (Part 2)

    See More
  • Springtime Is the Right Time for Commercial HVAC Maintenance

    See More

Related Products

See More Products
  • HVAC/R Electrical Troubleshooting: Component Testing Training Kit

  • 9781482255676.jpg

    Testing and Balancing HVAC Air and Water Systems, Fifth Edition

  • Manual B.jpg

    Manual B - Balancing and Testing Air and Hydronic Systems

See More Products
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing