search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Home » Topics » Engineered Systems NEWS » HVAC Design/Construction Process

HVAC Design/Construction Process
HVAC Design/Construction Process RSS Feed RSS

Commissioning

Commissioning: Responsible Parties

Beyond the letter of the contract: When it comes to system flaws, not everything falls on the shoulders of the general contractor or the architect.
Rebecca T. Ellis, P.E.
May 2, 2016

Whether one calls it a commissioning action list, a master issues log, a deficiency list, a corrective action list, etc., every commissioning project includes a matrix of items needing attention by someone on the project team. This table is the responsibility of the commissioning professional to create, maintain, and share with the team.


Read More
Facility Files

Temporary Air Conditioning Using Owner In-House Project Management

Amanda Parolise
May 2, 2016

This month’s Facility File will focus on the B2B May test for a K-12 school HVAC application.


Read More
Editors Note

Boilers, BIM & Political Miracles

What consensus can be found when it comes to building modeling or legislation?
Robert Beverly
May 2, 2016

We’ve been working double time this month to produce not only the issue of ES before you now, but also the spring edition of Today’s Boiler. That is the official publication of the American Boiler Manufacturers Association, and it also gets a facelift as of this month, thanks to a redesign and the first phase of some editorial additions. 


Read More
Smart Buildings Demand A Smarter Appoach To O&M

Smart Buildings Demand A Smarter Approach To O&M

In the beginning, the goal is to enable the operations and maintenance staff to work with the system to give it the best chance to perform as designed. Later, the vision is a culture of continuous improvement that can withstand changes in technology and personnel. In between? Plenty of opportunity for thoughtful operations and standardized routines.
Robert S. Novak, P.E., CSSBB
April 1, 2016

Modern buildings are truly amazing structures, with highly complex and integrated building systems that are energy-efficient and sustainable. 


Read More
Commissioning

Design Review In Design Phase vs. Construction Phase

If you absolutely have to limit the commissioning role, then pick your moments wisely.
Rebecca T. Ellis, P.E.
April 1, 2016

Last month’s column walked through the scenario of what might happen if the commissioning professional is not engaged until very late in the construction phase.


Read More
Tomorrow's Environment

Integrity: Not To Be Taken Lightly

Build a better industry with honest, faithful engineers.
Howard McKew, P.E., C.P.E.
April 1, 2016

What better time to talk about integrity than in a presidential election year. Certainly the perception of integrity within the building industry is much, much more low-key than the integrity of politicians, but it is the political environment that sets the bar for bad behavior. 


Read More
Facility Files

Air Conditioning For A Datacom Room Expansion Using Integrated Project Delivery

Amanda Parolise
April 1, 2016

This month’s Facility File will focus on the B2B April test for an HVAC application within a financial investment facility that is doubling its datacom room to accommodate a critical business environment.


Read More
Commissioning

Finding Design Issues Late In Construction

When concerns arise, weigh the pros and cons of a project delay.
Rebecca T. Ellis, P.E.
March 1, 2016

Late last year (November and December, 2015) this column addressed the situation where a third-party commissioning professional is not by with the building owner until the last few weeks of construction. 


Read More
Tomorrow's Environment

Commercial Retrofits: Consider AFAD As Well As UFAD

Howard McKew, P.E., C.P.E.
March 1, 2016

In last November’s Back2Basics, I created a test for the readers based on the idea that the patient room design was similar to a pharmaceutical cleanroom, with an air lock for people to enter and leave the room.


Read More
Facility Files

Commercial Design-Build BAS Energy Retrofit

Amanda Parolise
March 1, 2016

This month’s Facility File will focus on the B2B March test for the commercial building energy retrofit HVAC application.


Read More
Previous 1 2 … 119 120 121 122 123 124 125 126 127 … 140 141 Next

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing