search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessCommissioningCommercial HVAC

Finding Design Issues Late In Construction

When concerns arise, weigh the pros and cons of a project delay.

By Rebecca T. Ellis, P.E.
Commissioning
March 1, 2016

Late last year (November and December, 2015) this column addressed the situation where a third-party commissioning professional is not by with the building owner until the last few weeks of construction. I am currently involved in two such projects, and we don’t even call it “commissioning;” we call it “testing” because that’s what the owner is really asking us to do.

Without the commissioning professional involved earlier in the project, there are no documented Owner’s Project Requirements (OPR). As such, there are no agreed-upon objective acceptance criteria for the testing. In many ways, the testing is being performed to understand and document exactly how the systems function when the project is substantially complete. If they do not perform according to clear design and approved-submittal criteria, it is straightforward to document deficiencies that the contractors need to correct prior to final acceptance.

However, what should be done if the systems perform as designed and yet do not achieve what the commissioning professional believes the owner wants/needs? This belief may be based on code or industry standards, or simply based on the commissioning professional’s past experience with and knowledge of the owner’s expectations.

The end of construction is a challenging time to start talking about what the owner wants from specific systems. Almost everyone on the project team, with the possible exception of the owner’s facilities operations staff, responds the same way to queries from the commissioning professional:

  • “Ugh, why are you even bringing this up right now?”
  • “We will deal with this after project completion.”
  • “Don’t rock the boat.”

So, how hard should the commissioning professional pursue design-related concerns at the end of construction? As with everything else late in the project, it is a matter of prioritizing and only “rocking the boat” when life safety and/or the owner’s primary business function are at risk. Everything else can reasonably be deferred until after construction.

Once the high priority immediate issues are identified, they can typically be split into two categories:

  • Solvable before the end of construction
  • Too hard to correct prior to the end of construction

Of course, those issues that can be resolved relatively easily (e.g., short lead-time equipment replacements, reprogramming the BAS, rebalancing air or water flows, etc.) should be corrected as soon as practical.

For the more complex issues (e.g., long lead-time equipment that needs to be replaced, missing infrastructure elements, undersized distribution systems, etc.), the project team needs to develop a stop-gap solution to get the owner through initial occupancy and operations until a permanent solution can be implemented.

The late-in-construction testing professional needs to help the owner keep the entire project team engaged until all issues are resolved to the owner’s satisfaction, even if that is after the owner assumes ownership and operational responsibilities for the building. Depending on contract details, this may involve additional design fees or construction change orders.

Introducing a third-party professional in the design phase to facilitate a full-service commissioning process should help prevent this type of end-of-construction drama. The discipline of discussing, agreeing on, and documenting the owner’s expectations and acceptance criteria in writing sets the stage for all subsequent commissioning design review, construction observation, and functional testing activities. ES

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    News
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Trimble Hilti Boston Dynamics

    Trimble, Hilti, and Boston Dynamics Partner to Explore the Use of Autonomous Robots in Construction

    See More
  • CSI Website Assists in Finding Construction Industry Professionals

    See More
  • Case In Point

    Unique dehumidifier retrofit saves school $400,000 in construction costs

    See More

Related Products

See More Products
  • 1966.gif

    HVAC Duct Construction Standards - Metal and Flexible

  • Manual LLH Cover_Final.jpg

    Manual LLH - 2019 (HVAC System Design for Low Load Homes)

  • DUCT DESIGN.gif

    HVAC Systems Duct Design

See More Products

Related Directories

  • National Assn. of Women in Construction-NAWIC

    NAWIC, the premier association for women in construction, provides education, professional development, and networking opportunities to over 5,000 members across the U.S.
  • Women in HVACR

    Women in HVACR are an international organization for Women in the Heating, Ventilation, Air Conditioning and Refrigeration industry. Women in HVACR exist to improve the lives of our members by providing professional avenues to connect with other women.
  • Design Polymerics

    Design Polymerics manufactures low VOC, LEED qualified, duct sealants, duct liner adhesives and insulation mastics. We now offer silicones and MS polymer sealants.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing