Overby-Sheppard Elementary in Richmond, Virginia, needed more than an HVAC upgrade, but with tight budgets and minimal state funding, it didn’t seem likely. The 40-year-old building needed a full overhaul to provide students with a healthier, distraction-free environment.
When designing a kitchen ventilation system, there are a number of factors that should be considered, such as project budget, building layout, surrounding buildings, system maintenance, operational cost, fire risk from grease buildup, and more.
The opening of a new school is an exciting time. Seeing reactions from students and educators the first time they walk through the door and watching as community members celebrate their investment in education fuels my passion for designing K-12 education environments that inspire students to excel.
This month’s Facility File will focus on the B2B April test for a K-8 school temporary heating project in sync with a utility rebate to furnish and install a new 120 boiler horsepower (BHP) condensing boiler application.
In 2016, Georgia Institute of Technology received permission from the state of Georgia to enter into a guaranteed $7.7 million energy savings performance contract (GESPC) to tackle any energy and water conservation project it wanted — as long as the project could pay for itself within seven years.
This month’s Facility File focuses on the March Back2Basics retrofit of a campus-wide hot water boiler system covering 40 buildings with primary-, secondary-, and tertiary-pumping based on a performance lease agreement to retro-commission the system with a guaranteed operating savings. The university will hire an owner representative to work with a design-build-operate-maintain performance contractor (PC).
Today’s school facility directors are being asked to do more with less. With limited budgets, they are pressured to reduce operating expenses while maintaining healthy and comfortable learning environments for students.
The Lebanon Special School District (LSSD) in Lebanon, Tennessee, is one of the nation’s first school districts to retrofit conventional two-pipe classroom unit ventilators with combination VRF and ERV drop-in replacements.