Carrier introduced the latest release of its i-Vu® web-based BACnet® building automation system, which now offers full support for both Carrier Comfort Network® (CCN) and Carrier i-Vu Open (BACnet) systems.
When Schreiber Foods finishes construction on its new corporate headquarters, it will have an impressive presence in the center of downtown Green Bay, WI.
Last month, we tested readers on commissioning three of the many automatic temperature control (ATC) sequences of operation associated with the secondary hot water process heating system for an industrial building application.
There are no industry standards for rebalancing HVAC water systems, so it got me thinking about the topic and I came up with several questions pertaining to rebalancing chilled water, condenser water, and hot water heating systems.
HVAC systems continue to be the most challenging part of a new construction project to get right the first time, and the most challenging parts of the HVAC systems are their controls. I believe there are two root causes.
Can a location of air return affect the flow path of airborne pathogens in a patient room? Use simulations to manage the variables and improve the design in a space that is no room for error.
When the facilities management staff of Mount Vernon Hospital completed an assessment of its central chilled water plant, it became evident that while the original chillers had served the hospital well since its opening in 1975, they were ready for replacement.
In real estate it’s all about location. But in south Florida, where beautiful views and gorgeous weather are the norm, building owners need to find ways to differentiate themselves and bring in tenants.