search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSCommissioning

Punchlists and Commissioning Action Lists

By Rebecca T. Ellis, P.E.
construction contract writers

I recommend construction contract writers incorporate the commissioning action lists into a broader definition of the “punchlist” that needs to be fully closed-out before final completion can be declared and final payment made.

 

January 10, 2022

Thanks to The American Institute of Architects (AIA) and its contract templates for all things related to design and construction, there are industry standards for closing out a construction project. After more than 25 years of commissioning being incorporated into some design and construction projects, the industry has yet to address how commissioning fits into an owner’s contractual acceptance of a project.

The traditional project closeout process includes two major milestones: substantial completion and final completion. Substantial completion is the stage at which the contractor’s work is sufficiently complete such that the owner can occupy or utilize the building for its intended use. Final completion is the point at which the owner agrees all contract requirements have been met, and the contractor is paid fully for the construction work.

It is expected at substantial completion that there will be some outstanding contractual obligations the contractor still needs to fulfill, and it's a standard practice for the contractor to prepare and submit a full list of items to be completed or corrected before final completion. This list is commonly referred to as the punchlist, and the owner needs to agree to the items on the punchlist as part of the substantial completion process. This typically involves the design team and the owner working with the contractor to prepare the punchlist to everyone’s satisfaction.

Punchlists are typically comprised of physical items identified during a “punchlist walkthrough” of the project (e.g., missing signage, damaged finishes, broken door handles, missing components, site cleaning, etc.) and yet-to-be submitted closeout deliverables, such as O&M manuals, training, record drawings, etc. In short, these are items easily identifiable by a design team member and/or owner’s representative. Final completion and, more importantly to the contractor, final payment is not due to the contractor until all items on the punchlist have been signed off as completed by the owner.

The punchlist process can work well for static installation and documentation items but almost never includes dynamic or operational issues at the time of substantial completion. That is where the commissioning action list (CAL) comes in for commissioned projects. The CAL is essentially a punchlist for invisible operational issues that cannot be seen during a punchlist walkthrough.

The CAL is developed and maintained by the commissioning professional separate from the punchlist and, like the punchlist, is tracked through issue resolution. However, it is almost never mentioned in the project closeout requirements, either in the bid specifications or in the construction contract with the owner. Therefore, the building owner has no clearly defined contractual “teeth” to require the contractors to correct deficiencies listed in the CAL before final payment.

This can result in CAL items lingering and being ignored long after the substantial completion milestone, and this situation is one of the most frustrating aspects of commissioning for all project team members. Tracking open CAL items is time-consuming for the contractor; the commissioning professional; the building owner; and, even when design intent questions arise, for the design team at a time when everyone should be moving on to their next project.

I recommend construction contract writers (including the American Institute of Architects [AIA]) incorporate the CAL into a broader definition of the “punchlist” that needs to be fully closed-out before final completion can be declared and final payment made. Until that happens, commissioning professionals can address this on a project-by-project basis with their building owners and design teams as project closeout specifications are written and contracts are executed. It is easy enough to include language regarding the CAL but not so easy to change decades of the way things have always been done.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Contracting
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Residential Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Commissioning

    Commissioning Action Lists: Keeping Them Under Control, Part 3

    See More
  • Commissioning

    Commissioning Action Lists: Keeping Them Under Control, Part 2

    See More
  • Commissioning

    Commissioning Action Lists: Keeping Them Under Control, Part 1

    See More

Related Products

See More Products
  • drafting.gif

    Sheet Metal Drafting Using Solidworks, 1/e

  • 9781482255676.jpg

    Testing and Balancing HVAC Air and Water Systems, Fifth Edition

  • SMACNA-logo8.gif

    Accepted Industry Practices for Sheet Metal Lagging

See More Products

Events

View AllSubmit An Event
  • November 12, 2025

    A2L in Action: Proven Performance in Cold Storage

    On Demand This webinar will provide insights into the process, challenges, and successes of implementing this new A2L technology, showcasing how industry leaders are paving the way for a more efficient and environmentally friendly future.
View AllSubmit An Event

Related Directories

  • Action Sales

    Action Sales was founded in 1994. We service the Plumbing and HVAC trades for California, Washington. Oregon, Nevada and Hawaii.
  • AABC Commissioning Group (ACG)

    The AABC Commissioning Group (ACG) is a non-profit dedicated to advancing independent commissioning professionals through education, training, and certification since 2004.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing