search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessCommissioningCommercial HVAC

COMMISSIONING

Commissioning Action Lists: Keeping Them Under Control, Part 1

Schedules can get out of control for several reasons. What’s to be done to prevent or minimize the fallout?

By Rebecca T. Ellis, P.E.
Commissioning
October 1, 2014

Last month, this column introduced the concept of an “excessively long” commissioning action list (CAL). Once functional performance testing begins, the CAL (which could also be named a variety of other things) is the tool that commissioning professionals use to document and track resolution of deficiencies with, questions about, and/or differing opinions regarding system operation. A long CAL is bad for everyone on the project team, as detailed in my September 2014 column. This month, I want to begin exploring the multiple reasons why the CAL might get out of hand, who might be responsible, and what the commissioning professional might do about it.

Unrealistic Construction Schedule

An unrealistic construction schedule may be partially the owner’s responsibility for placing unrealistic time constraints on the contractors, and partially the contractors’ responsibility for agreeing to those constraints in order to win the project. On the other hand, an unrealistic construction schedule may solely be the contractors’ responsibility if they fail to plan and manage the project effectively. In very few cases are forces outside of either the owner’s or contractor’s control (weather, labor strikes, etc.) the cause for compressed construction schedules.

An unrealistic construction schedule results in pressure on the commissioning professional (from both the contractors and the owner) to begin functional performance testing before the systems are complete, balanced, and/or fully checked out by the contractors. The commissioning professional cannot dictate the schedule, but the commissioning professional can be an active voice of reason about what can be expected if there is not enough time scheduled at the end of construction for startup, controls completion, quality control, balancing, and functional performance testing to be performed in the proper order.

The commissioning professional’s schedule feedback is most effective early in the construction phase when it is easiest to adjust the schedule. However, it is often neither heard nor heeded at that point because most project team members are not focused on the end of construction like the commissioning professional is.

If installation, startup, and balancing continue to be scheduled right up to the substantial completion date, the commissioning professional should have a candid discussion with the owner about the risks of premature functional performance testing. As noted in last month’s column, this will likely result in an excessively long CAL and all of the time and expense inherent to that. Some owners might prefer to put off testing until after substantial completion, but other owners will not have that option because of facility access and operations issues. The commissioning professional needs to have this discussion with the owner early enough in the project to allow the owner time to work with the contractor and, perhaps, the building occupants to work out a manageable solution.

Owner’s Ambigous Project Requirements

If there is confusion during functional performance testing about what is and is not acceptable, there will be excessive CAL items dedicated to documenting the various points of view. These are particularly challenging issues to resolve because it is the responsibility of the entire project team and the owner to meet and decide on the acceptance criteria.

The commissioning professional can help avoid this situation by advocating for the documentation of objective acceptance criteria from the very beginning of the project. This starts with a clear Owner’s Project Requirements document, moves into clearly defined control sequences and set points in the design documents, and culminates in the commissioning professional developing project-specific test procedures with clear pass/fail acceptance criteria for each test step.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Ground Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Commissioning

    Commissioning Action Lists: Keeping Them Under Control, Part 3

    See More
  • Commissioning

    Commissioning Action Lists: Keeping Them Under Control, Part 2

    See More
  • Commissioning

    Commissioning Action Lists: What Is Too Long?

    See More

Related Products

See More Products
  • solidworkscourse1.gif

    SolidWorks for the Sheet Metal Guy - Course 1: Part Creation

  • controltransformersdvd.jpg

    UNDERSTANDING CONTROL TRANSFORMERS

  • drafting.gif

    Sheet Metal Drafting Using Solidworks, 1/e

See More Products

Events

View AllSubmit An Event
  • November 13, 2025

    4 Lead Generation Mistakes You Might Be Making in Your Business & How to Fix Them

    On Demand From website gaps to follow-up breakdowns, you’ll walk away with practical tips to improve your lead flow process and turn your marketing investment into actual revenue results.
  • November 12, 2025

    A2L in Action: Proven Performance in Cold Storage

    On Demand This webinar will provide insights into the process, challenges, and successes of implementing this new A2L technology, showcasing how industry leaders are paving the way for a more efficient and environmentally friendly future.
View AllSubmit An Event

Related Directories

  • Action Sales

    Action Sales was founded in 1994. We service the Plumbing and HVAC trades for California, Washington. Oregon, Nevada and Hawaii.
  • Heat Controller

    Heating and air conditioning equipment for residential and commercial applications, 1/2 to 25 tons, under the Comfort-Aire and Century brand names.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing