search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHealth Care HVAC

Pharma Design Intent Document Is Demanding but Easy to Engineer

By Howard McKew, P.E., C.P.E.
pills
November 3, 2021

Last month, I discussed the potential engineers have to achieve post-COVID-19, high-performance health care. The pharmaceutical industry has touted high-performance IAQ long before COVID emerged. This is largely because the product going out the door of pharma production facilities has always been financially driven, and the occupants have always followed mandated restrictions (e.g., masks, hygiene criteria, etc.) the health care community has struggled to embrace and enforce. As a result, a hospital’s “products” (e.g., healthy patients leaving the building) do not match up to the pharma “product” because health care facilities are driven by public opinion, reputation, etc. Producing safe drugs for people mandates zero tolerance. In 2020, hospitals changed their modes of operation by dictating that masks be worn by everyone within such facilities, and enhanced hygiene procedures were implemented and followed. Hospitals received very little pushback because we were all experiencing the COVID-19 pandemic.

I have often asked the question, “What is more important, maintaining zero-tolerance for the health and welfare of humans going to a hospital or maintaining zero tolerance for the product pharma firms are selling to the public?”

Unlike health care facilities, the pharma industry is far more demanding of those who come and go from their buildings, while health care facilities are much more lenient. So, health care facilities come in second when it comes to protecting their “products.”

I’ve engineered hospital and pharma building projects, following the guidelines, standards, and codes on each project, and I must admit, it requires a lot more time to design an optimum health care project than a pharma project. Health care design criteria is first separated into three categories:

1.         Inpatient spaces with four pages covering room criteria;

2.         Outpatient spaces with three pages covering room criteria; and

3.         Residential spaces with one page covering room criteria.

Pharmaceutical HVAC design guidelines are exceptionally practical and are backed up by numerous standard operating procedures (SOPs) to support the continued compliance, e.g. (validation master plans).

With far less pharma room types and associated design criteria, the engineering is quite a bit simpler. The biggest difference between the two applications is how the facility is managed. Temperature, humidity, and air filtration are far more important to pharma spaces, whether the room is fully occupied or operating at limited occupancy. The construction of these rooms receives far more attention so as to make sure the rooms are tight, thus maintaining the design space humidity level. Construction of health care rooms is not as tight with the use of lay-in tile ceilings in many areas versus plaster ceilings, making it difficult for the HVAC operation staff to be able to sustain the engineer’s design intent document (DID) (e.g., temperature, humidity, space pressure, etc.).

There is far less diversity when selecting a central air system with a limited number of terminal unit types for a pharma application versus a hospital application, where the designer has far more options (e.g., chilled beams, fan coil units, etc.).

The more complex and/or diversified the HVAC systems, the more emphasis falls on the shoulders of the HVAC operation and maintenance staff, who need to be knowledgeable on the performance of a large variety of terminal equipment and device application options. The more diversified the number of HVAC systems within a building, the greater the challenge for facility staff who must continuously operate each system as efficiently as possible. Simplicity and the limited number of HVAC systems within a pharma building make the operation, maintenance, and energy conservation performance demanding but easy when compared to health care applications.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Howard McKew is author of Integrated Project Delivery for Building Infrastructure Opportunities for HVAC consultants and mechanical contractors and can be reached at hmckew@bss-consultant.com or at www.buildingsmartsoftware.com. 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Residential Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    News
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • HVAC Working to Engineer a Better World

    See More
  • 3D Printer

    How to Reverse Engineer a Part from a 2D Scan

    See More
  • Sept. 10, 2014: ASHRAE Supports Change to Professional Engineer Requirement

    See More

Related Products

See More Products
  • new cover.jpg

    Profit is An Attitude: The Strategies You Need to Optimize Profits

  • Manual LLH Cover_Final.jpg

    Manual LLH - 2019 (HVAC System Design for Low Load Homes)

  • Manual Q.jpg

    Manual Q - Low Pressure, Low Velocity Duct System Design

See More Products

Events

View AllSubmit An Event
  • June 24, 2025

    Regional Considerations in Data Center MEP Design: From Desert to Coast

    On Demand Join ES NEWS' Editor Austin Keating and the panel for an expert examination of regional data center design strategies. They will be joined by data center commissioning experts and manufacturer representatives.
View AllSubmit An Event

Related Directories

  • Climate by Design International

    CDI designs and manufactures desiccant dehumidifiers and critical process air handlers. Optional patent NoThruMetal design meets demand of low temperature environments without condensing.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing