search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessHigh-Performance Buildings & AutomationCommercial HVAC

Writing Your Own Sequence Of Operation

Multiple benefits await once you kick the habit of handing off the sequence of operation duties.

By Howard McKew, P.E., C.P.E.
Tomorrow's Environment
August 4, 2017

When I first started in the HVAC industry working in a design consulting engineering firm, I came to accept that the HVAC sequence of operation and its associated contract specification, Automatic Temperature Controls (ATC), were provided by an ATC sales engineer. I’d go so far as to say this was the industry standard for designing HVAC systems. Heck, you could get some very knowledgeable sales engineer to come into your office and you’d explain the job and he (never met a woman sales engineer back in the 1960s) would help you out.

Of course, that section of the specification would state, “based on Honeywell Controls” or some other sales engineer’s company. This didn’t assure him he’d get the job, but many contractors would try and buy out the controls using the “base” ATC manufacturer.


At this point, I was working with an in-house electrical engineer who bordered on being a tyrant with HVAC engineers. I think he enjoyed the intimidation especially if you were a young, inexperienced design engineer. That’s when I stopped using a sales engineer to do my work.


For the first few years, I came to rely on a couple of different sales engineers back then because it was convenient and I’d learn more about the controls from these individuals. Then electric heat became very popular, and with this I had to spend more time coordinating the electrical engineer’s portion of the design in addition to drawing on the ATC sales engineer’s suggested sequence of operation. It was at this point that I was working with an in-house electrical engineer who bordered on being a tyrant with HVAC engineers. I think he enjoyed the intimidation especially if you were a young, inexperienced design engineer. That’s when I stopped using a sales engineer to do my work, although many other design engineers still relied on the convenience of a sales engineer.

I had this great mentor, Jim McGrath, who sat me down and began my education into writing my own HVAC sequences of operation. Going forward, when it came to providing the electrical data associated with HVAC to the electrical engineer, things changed drastically. Instead of my usual completed electric data sheet (unit number, horsepower, starter required, and interlock with associated other piece of equipment) I was now providing the same electric data sheet along with individual system flow diagram sketches with control devices, control panel, and electrical power and interlock wiring shown and noting “wired by electrical sub-contractor or ATC sub-contractor.” If I had 10 different systems (e.g., central air-handlers, cabinet unit heaters, hot water and chilled water systems), it was all there on individual system flow diagrams and sequences of operation.

At this point in time, I wrote my own sequences of operations beginning with “system OFF,” and that would allow me to make the decisions pertaining to normally open or closed ATC devices in fail-safe mode. These flow diagrams gave everyone, including the Tyrant, a picture of the complete design intent and who was responsible for what work. I also would include the set points, alarms, etc., along with what I wanted to see on the ATC control panel cover.

A lot has changed since those pre-CAD days. Sales engineers don’t usually call on engineers and instead provide computer-generated, standard ATC design drawings along with the associated sequences of operation. Another change has been equipment manufacturers designing and mounting their own ATC controls pre-packed and pre-wired as part of their equipment, thus eliminating the ATC subcontractor from furnishing and installing their control system.

In the end, the building operator will receive the ATC subcontractor’s record drawings that will be very detailed from years of uses and continuous improvements. The HVAC equipment manufacturer usually doesn’t provide the same quality level for ATC flow diagrams and sequence of operations, and the owner will most likely not see a complete ATC record document. Instead, the owner will have to draw from various record documents to find the rest of the ATC documents (e.g., ATC for central air-handling system will be in the equipment record submittal). If the owner has a chiller, make-up air unit, central AHU, and overall ATC, then she will need to compile three different record submittals to pull out the ATC information and place it with the overall ATC record document.

Next month, I’ll discuss how the design engineer should create his own system flow diagrams and write the needed sequences of operation and then maybe highlight which segments of the system design are ATC subcontractor and which are furnished and installed by the equipment manufacturer. I’ll also note why this should be done.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Howard McKew is author of Integrated Project Delivery for Building Infrastructure Opportunities for HVAC consultants and mechanical contractors and can be reached at hmckew@bss-consultant.com or at www.buildingsmartsoftware.com. 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    News
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Commercial Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Tomorrow's Environment

    Why Write Your Own Sequence Of Operation

    See More
  • Series counterflow chilled water plant diagram.

    Collaborative Sequence of Operation Development

    See More
  • Understanding Heat Pump Sequence Of Operation

    See More

Related Products

See More Products
  • HPOIS.png

    Heat Pump Operation, Installation, Service

  • front cover only.jpg

    How to Market Your HVAC Business

  • 0071829598.jpeg

    HVAC Equations, Data, and Rules of Thumb, Third Edition

See More Products

Related Directories

  • Your Bargain Mart

    We are a MRCOOL Dealer and carry contractor-grade HVAC equipment, air handlers, condensers, heat pumps, gas furnaces, evaporator coils and heat pumps, gas, and electric packaged units.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing