search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessHigh-Performance Buildings & AutomationCommercial HVAC

BAS Commissioning Basics

Does your control systems “work” or does it operate as designed?

By Paul Ehrlich P.E.
BuildingAutomation
July 6, 2016

A few months ago, this column covered the basics of developing effective control system sequences. You might recall that it discussed the process of how a designer needs to select and describe sequences that provided safe, reliable, and efficient control.

Once a sequence is developed it then needs to be properly implemented, a challenging task that falls to the controls contractor, but interpreting the sequence and programming the system is only one of their many tasks. First, they need to competitively bid and win the project, and then they go through the process of developing the controls submittals and installing the controllers, sensors, and actuators.

Finally, they are at the point where they are ready to interpret the sequence and create the code that gets used in the controllers. The contractor may be installing controls on a new construction project where controls probably are one of the very last items to be completed, or they may be working on a retrofit project where equipment is only shut down for brief intervals while the new system is installed. In either case, the contractor is constrained for time (and let’s be realistic — on budget) to get the program in place, tested, and validated.

The end result, unfortunately, is often a control system that may “work” but is not operating the way that the system designer had intended. This is where the important task of controls system commissioning by either the original controls designer or a third-party commissioning agent comes into play. The purpose of controls commissioning is to go through the system and validate that it is working the way that it was designed. It is not intended as a crutch, or criticism of the contractor, but instead as a quality control measure intended to verify that the system works as it was intended in design.

The process for controls system commissioning begins with a review of the contractor’s test reports. These documents are generally provided by the contractor and show that they have gone through the process of checking wiring, connections, and basic system operation. Ideally, the contractor will also have an updated set of control drawings available for the commissioning agent as well.

After reviewing reports, the commissioning begins with an inspection of control panels, end devices, and equipment to verify the proper component installation. Are the right sensors and actuators installed in the right places? Is wiring properly installed? Are control panels installed in a professional manner and properly labeled? The commissioning then progresses to the controls user interface, verifying that the necessary points are connected and properly reporting at the user interface. System loops should be observed and trended to see if they are operating in a stable manner.

The final step is to start to validate sequences. Much of this can be done through observation and trending, but in many cases, sequences are best verified by simulating changes to inputs and watching if the required outputs change. For example, if the input for outdoor air temperature is reduced from 75˚F to 50˚F, does the boiler come on? Does the hot water loop temperature setpoint reset as the temperature is dropped further?

Commissioning is an iterative process. Once we go through the system, we document our findings into a punch list. The contractor then fixes any issues and the system is then re-tested. Ideally, at the end of the day, we have a system that is properly commissioned and is working the way that the designer had intended.

A system that works as designed is a win–win–win deal. Good for the designer, good for the contractor, and great for the owner! ES

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Paul Ehrlich is the founder and president of Building Intelligence Group LLC, a consulting firm focused on the delivery of energy efficient commercial buildings with a  focus on controls, systems integration, and building to grid integration. For more information, see www.buildingintelligencegroup.com.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Ground Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Building Automations

    The Importance Of Doing BAS Right

    See More
  • BuildingAutomation

    Lighting Control and BAS

    See More
  • Flow Chart

    Back to BASics

    See More

Related Products

See More Products
  • TGW_Entry Level_cover.jpg

    Technician’s Guide & Workbook for Entry Level Tech's

  • ac.png

    Air Conditioning Service Guide R-410A and R-22 Systems 2nd Edition

  • HPOIS.png

    Heat Pump Operation, Installation, Service

See More Products

Related Directories

  • AABC Commissioning Group (ACG)

    The AABC Commissioning Group (ACG) is a non-profit dedicated to advancing independent commissioning professionals through education, training, and certification since 2004.
  • Data-Basics Inc. (Manufacturer)

    SAM Pro Enterprise provides an integrated service management, wireless workforce and job cost accounting software for service, construction and national accounts.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing