search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessCommissioningCommercial HVAC

System Readiness

Why are there delays in testing? And how to get back on track?

By Rebecca T. Ellis, P.E.
Commissioning
February 1, 2016

This month, I want to address an issue which is as old as building systems commissioning itself. It was one of the first challenges commissioning professionals endeavored to resolve in order to more effectively and efficiently facilitate the commissioning process … and yet it still lingers. It does not linger in small, dark, unenlightened corners of the design and construction world. It lingers on a majority of projects. The issue is the readiness of commissioned systems for functional performance testing (FPT).

There are myriad reasons why systems are not ready for testing even after the commissioning professional works diligently with a project team to coordinate the process leading up to testing, provides test procedures with acceptance criteria, and repeatedly asks for affirmation that the systems are fully installed, started-up, balanced, programmed, and pre-tested for compliance with the test procedure requirements. Common reasons include:

  • Lack of realistic construction scheduling
  • General contractor not taking responsibility for coordinating all of the subcontractors required to make individual systems ready
  • The expectation that commissioning testing is a substitute for “quality control,” i.e., testing’s purpose is to identify problems for the contractor to fix
  • The belief that commissioning testing is the process by which the controls contractor is told how to program the sequences of operation to meet the owner’s expectations (despite the fact that sequences of operation were painstakingly defined in the bid documents and reiterated in the control system shop drawings)

Functional performance testing would be better named “system performance demonstration” because the intent is for the systems to pass the functional performance tests with no problems or glitches the first time around. All of the steps of the commissioning process are geared toward achieving that result. However, this continues to be such an elusive goal that we are ecstatic when testing results in only a handful of issues that need to be resolved and retested. The good news is that this does happen once in a while. The bad news is that it does not happen nearly as often as it could.

 

What have we tried?

Prefunctional checklists. These were the first foray into making the contractors responsible for system readiness and have been a mainstay of commissioning since the beginning. However, checklists are often pencil-whipped and practically meaningless other than to be able to point fingers when the systems are not ready for testing.

Penalties. It has become more and more common for project specifications to include penalties for excessive functional performance retesting due to systems not passing their initial tests. What is less common is owners who choose to enforce those penalties.

Rewards. Only a few owners have gone to the trouble of offering incentives to contractors for successful initial functional performance test results. When they do, it definitely gets the contractors’ attention.

Pretesting remote trend analysis. This is very beneficial for limiting the amount of wasted field testing time. However, unless the systems are truly ready and the trend logs illustrate per-design performance, it can drag out the testing/acceptance process well past the scheduled building turnover date with multiple rounds of data collection, trend downloads and analysis, and review comments back-and-forth.

A lot of people need to step up in order to improve this situation, starting with general contractors/construction managers, many (but not all) of whom need to take their systems-level coordination responsibilities more seriously. This starts with including reasonable time at the end of installation and before substantial completion for start-up, integration, balancing, and controls implementation. It ends with a keen appreciation for the benefits of functional performance testing being successful; this is an opportunity for the entire construction team to leave the project with a great impression and to gain the owner’s goodwill for the next project or for word-of-mouth references. ES

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Air Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Commissioning

    Remote System Readiness Verification

    See More
  • Commissioning

    TAB is a Prerequisite for Functional HVAC System Performance

    See More
  • Commissioning

    TAB Work Can Greatly Enhance an HVAC System Renovation's Success

    See More

Related Products

See More Products
  • Training-System-2017.jpg

    Customer Service Training System by Steve Coscia

  • Training-Managing-System-2017.jpg

    Customer Service Training & Managing System by Steve Coscia

  • srepm.png

    System Recovery & Evacuation

See More Products

Related Directories

  • Rabe Environmental Systems

    Reviewed September 26, 2021 Mostly great people to work with. love hands on work and be able to be taught on hand, in the shop and in the field. Reviewed August 19, 2021 Come ready to work and learn something new whether in the shop or field.
  • Griplock Systems

    Griplock's HVAC suspension system provides fast installation, height adjustment, and leveling of ductwork with tool-free adjustable grippers, saving time and money. SMACNA TRI verified.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing