search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessHVAC RetrofitsHealth Care HVAC

The Facility Files

Building Program To Basis Of Design For A Patient Floor Corridor Renovation Within An Existing Hospital Building Project

By Amanda Parolise
Facility Files
July 1, 2015

For a building program to be successful and sustainable, it must include an operating budget as well as a construction budget. Fifteen to 20% of the total cost of a building is first cost, and that remaining 80% or more is in the operation of the building over its life. The following is a sample of what the HVAC annual operating budget add-on to the current hospital operating budget along the infection control beta-test site data collection reporting could look like at the conceptual phase of a new patient floor infection control (IC) corridor HVAC design renovation.

When designing a renovated patient care space within a hospital facility, the design engineer should refresh her memory relative to this Basis of Design by first going to ASHRAE Handbook 2015 Applicationsand read Chapters 8 Health-Care Facilities, Chapters 36 through 43 relative to building operation and management, Chapter 59 HVAC security, and Chapter 61 codes and standards. In addition the design engineer should take into account ASHRAE Standard 170-2013, Ventilation of Health Care Facilities.

With all these design guidelines from ASHRAE, the engineer should then meet with the hospital’s facility management/maintenance manager for the hospital’s CMMS (responsible for patient room custodial workorders and HVAC equipment preventive maintenance workorders), as well as with the infection control manager to complete this conceptual phase O&M budget. Because this Patient Corridor and Patient Room Vestibule project is a beta-test site to improve infection control, the HVAC engineer will need to budget her time to work closely with both facility management, infection control department, housekeeping, and IC tablet computer programmer, plus the third-party IC commissioning consultant and TAB consultant, to assist in developing the first year’s operating budget to monitor, measure, and report on the IC project success. The budget estimate is reflected below and will be an additional operating cost to collect and analyze the data throughout the first year of occupancy.

Unlike commercial buildings, hospitals are built for 30+ years of sustainability, and so an annual operating budget is critical to the long-term success and investment of each building program project. For this month’s Facility File and based on the Back2Basics test, the operating budget will focus solely on the patient floor corridor central HVAC system and the associated semi-annual air balancing verification based on the infection control vestibule computer program. 

It should be noted that the Center for Disease Control and Prevention (CDC) in a 2002 report estimated the number of hospital acquired infections (HAIs) in U.S. hospitals, adjusted to include federal facilities, was approximately 1.7 million. An integral part of a hospital’s HVAC operation and maintenance department operating budget should include the infection control policy and procedure compliance when performing their work.

The following is a sample of what the HVAC annual operating budget for a beta-test site renovation of the patient floor corridor HVAC system could look like at the conceptual phase of a building program project.

Click here for the table.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Parolise is project manager consultant with BuildingSmart Software LLC. Reach her at mckew@yahoo.com.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Residential Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    News
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • July back2basics

    Building Program To Basis Of Design For A Treatment Clinic Within An Existing Hospital Building Project

    See More
  • k12image615

    Building Program To Basis Of Design For A New Kindergarten Addition To An Existing K-6 School

    See More
  • back2basics

    Building Program To Basis Of Design For A New Commercial Office Building Shell & Core Building Project

    See More

Related Products

See More Products
  • Manual LLH Cover_Final.jpg

    Manual LLH - 2019 (HVAC System Design for Low Load Homes)

  • Manual_SPS_new.jpg

    Manual SPS HVAC Design for Swimming Pools and Spas [ANSI/ACCA 10 Manual SPS - 2010 (RA 2017)]

  • Green Tips for Building Maintenance Engineers

See More Products

Events

View AllSubmit An Event
  • January 22, 2026

    Smarter Hydronic Design for Data Centers

    On Demand Instead of relying on large centralized pumps and restrictive balancing/control valves, distributed pumping uses packaged pumping systems and smart circulators located closer to the point of demand.
View AllSubmit An Event

Related Directories

  • Building Performance Assn.

    The Building Performance Association is a membership-driven 501(c)6 industry association dedicated to advancing the home and building performance industry by delivering improved energy efficiency, health, safety, and environmental performance of buildings through our members and network.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing