search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering TechnologyHeating & Boilers

Back 2 Basics

B2B: Energy Retro-Cx

Month 1 - The Energy Conservation Opportunity: Process Heating for an Industrial Building Application

By Howard McKew, P.E., C.P.E.
energy retro-cx diagram
September 23, 2013
MONTH 1- The Energy Conservation Opportunity: Process Heating for an Industrial Building Application
 
This final three-part series for 2013 is a continuation of the July, August, and September industrial heating system application with this month’s focus on the process heating system.
 
The energy retrocommissioning team/auditors for this three-month test series shall include the facility manager, process engineering manager, the building’s ATC technician, retrocommissioning engineer, and TAB engineer.
 
The first step in implementing an energy retrocommissioning initiative for this application can take two different approaches, with the first being the installation of meters to monitor the system so that data can begin to be collected, or the second approach being an initial cursory review of the original design intent versus actual operating conditions. With this second approach, it will be necessary to have an experienced, hands-on design engineer who is capable of making a preliminary assessment of operating conditions as well as original over-design.
 
With any quality control initiative is Step 1: “collect the data.”  Data collection removes the various opinions of everyone speculating on how the system is operating and quite often raises every team member’s awareness to how the system is actually operating and how long the system operates 365 days a year.
 
Still, the second approach often occurs in advance of data collection when an experienced design engineer “walks the system” and takes note of where the various balancing valves are set, what the pump discharge pressure is, what the temperatures are going out to the process equipment, and how many hours this process heating system runs. Based on this walk-through, the energy retrocommissioning team should be able to deter-mine whether there is a potential savings to invest in collecting actual operating data.
 
With this information in hand, we are going to focus on the secondary process heating system as our energy retrocommissioning candidate, but before we do this, we need to first document the original Basis of Design [BofD]. Referring to Amanda Parolise’s The Facility Files, this document should be created to identify the original BofD document followed by documenting during the energy retrocommissioning “solution planning” phase and the proposed BofD based on the Energy Retrocommissioning Study.
 
For this B2B, the secondary heating system application for an industrial facility with three work shifts depending on the work output require-ments based on the company’s sales requires the following steps be taken:
  1. Review existing record drawings and create a system flow diagram to document and create a visual survey aid for the hot water system.  
  2. Inventory hot water system, using system flow diagram to capture the number of process heating equipment.
  3. Inventory the use of 2-way automatic control valves mixed with 3-way automatic control valve use.
  4. Inventory hot water pumps for pump head, motor horsepower, and GPM to confirm connected load and determine whether all equipment will be operating at one time or there should be a diversity factor included in peak flow load. 
  5. Document hot water heating automatic temperature control strategy and compare with system flow diagrams.
  6. Document the 365-day, 24-hour a day schedule to identify current operating hours and projected operating hours based on business production projections.
In this data collection process, we have identified that the secondary heating system operates 24/7/365 to provide process hot water heat alt-hough the building is not occupied 24/7/365.  It was found during the walk-through that the process pumping system is oversized relative to pump head, with associated pump motor horsepower with balancing valves set between 70% open down to 50% open throughout the heating system. 
 
A partial energy retrocommissioning initiative has been completed based on some of the ECM noted in the September 2013 B2B, including changing out the pumps and adding VFDs to each pump. The 3-way ATC valves have been replaced with 2-way/straight-through ATC valves and head-pressure control has been removed. The hot water supply temperature set point has been reset to a lesser primary supply water temperature and is fixed and set in excess of needed temperature.  Based on the original BofD, actual BofD, and the potential to improve system performance without compromising production provides the energy retrocommissioning team several energy conservation measure (ECM) opportunities, including an occupied-unoccupied time clock to shut the secondary process heating system down 8 hrs, five days a week.
 
This month’s test requires the energy auditor to document the existing System Flow Diagram and review the automatic temperature control (ATC) sequence of operation, mode-by-mode, on page 2 of this B2B. The existing ATC sequence will then be inputted into the functional perfor-mance test (FPT) retrocommissioning Cx-3 software, with the reaction device-by-device imbedded into the checklist below the flow diagram. The commissioning engineer working with the rest of the team checks each sequence to confirm each control device passes the specific ATC reaction to verify the existing system ATC/FPT is operating per the original design intent. The answers can be found at www.esmagazine.com. The sequences selected are Off-Fail Safe Conditions, On-Max Winter Heating, and On-Maximum Summer Heating for this B2B test, but there will be other sequences of operation plus verification of alarms and safeties to be confirmed (not part of this B2B test).
 
When the energy auditor and the ATC technician have completed the ATC/FPT process, all deficiencies (fail) will have automatically been inven-toried into the Cx-3 software’s Corrective Action Log requiring further action by the technician for those failed reactions.  
 

ATC DATA ANALYSIS

After completing the initial ATC/FPT process, the energy auditor will begin the data analysis, solution planning, and completion of the Energy Retrocommissioning Report.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Howard McKew is author of Integrated Project Delivery for Building Infrastructure Opportunities for HVAC consultants and mechanical contractors and can be reached at hmckew@bss-consultant.com or at www.buildingsmartsoftware.com. 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Ground Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Back2Basics

    B2B: Energy Retro-Cx

    See More
  • b2b system flow diagram

    Energy Retro-Cx

    See More
  • Back 2 Basics diagram

    Energy Retro-Cx

    See More

Related Products

See More Products
  • Optimizing Social Media from a B2B Perspective

  • Green Tips for Building Maintenance Engineers

See More Products
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing