search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSVentilation and IAQCase in Point

Case In Point

Exhaust ductwork solves tough MEP challenge at research facility

Firespray Flamebar BW11
January 2, 2013

Firespray Flamebar BW11Finding new solutions to the complex challenges of global climate change is the task that drives the scientists and energy industry leaders who collaborate in the Energy Biosciences Institute at UC Berkeley’s new five-story, 11,300-sq-ft Helios Energy Research Facility in downtown Berkeley. UC Berkeley, the University of Illinois and Lawrence Berkeley National Laboratory have partnered with energy company BP, the funding agency, to create the EBI — researching new carbon-neutral biofuels and examining biofuels’ potential environmental, social, and economic impacts.

The project faced a unique challenge: fit complex, robust MEP systems within the lab’s highly constrained above-ceiling pace — without affecting the budget. With wet labs for molecular and microbial biology, fermentation, and chemical separation, the research facility’s plans demanded fresh thinking from the design/build project team.

Architect SmithGroupJJR and design engineer Gaynor, Inc. faced extremely constrained above-ceiling space. Critchfield Mechanical, Inc. proposed a simplified “single-fix” solution to the space problem: Firespray’s Flamebar BW11 lab exhaust ductwork. The factory-sprayed, welded stainless steel ductwork eliminates the need for a drywall shaft.

 “Our project incorporated Flamebar in lieu of using horizontal shaft-wall construction,” said Gabe Pattee, project engineer with Rudoph and Sletten. With the Flamebar BW11 system, the duct is the enclosure. The system reduced the lab exhaust assembly’s footprint more than a foot horizontally and vertically and streamlined construction schedule (fewer inspections required and one-step installation).

In addition, the system met code requirements from the university and state.

“Firespray’s system met the University IOR’s stringent criteria for acceptance and conversion from enclosed ductwork was quick and easy,” said Steve Lopez, vice president, Critchfield Mechanical, Inc. fully compliant with the IMC and UMC and is approved by the State Fire Marshal and by UC for use on Berkeley, San Francisco, and Irvine campuses.

Pattee said the system also saved the university money. “The combination of schedule savings and the elimination of the horizontal shafts proved to be an economically advantageous benefit to the project,” he said.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Contracting
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Air Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Watertube boiler, data reporting save research facility time and trouble

    See More
  • Case In Point

    Research facility upgrades efficiency with geothermal, modular chillers

    See More
  • Carrier Engineering Team with Heat Pump

    DOE’s Heat Pump Challenge at Halfway Point

    See More

Events

View AllSubmit An Event
  • June 24, 2025

    Regional Considerations in Data Center MEP Design: From Desert to Coast

    On Demand Join ES NEWS' Editor Austin Keating and the panel for an expert examination of regional data center design strategies. They will be joined by data center commissioning experts and manufacturer representatives.
View AllSubmit An Event

Related Directories

  • Refrigeration Research Inc.

    Refrigeration and air conditioning components, suction accumulators, receivers, mufflers, heat exchangers, pressure vessels, coaxial condensers and oil separators standard and custom made.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing