search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSCommissioning

Commissioning: Owner Expectations At The End Of Construction

By Rebecca T. Ellis, P.E.
February 1, 2011

At this stage, dilemmas that crop up (or have not been dealt with) can get even thornier.

In my January 2011 column, I discussed the importance of a project design team sincerely and open-mindedly requesting input and feedback from the owner’s operation staff during the design process. By participating in design planning meetings and articulating preferences with respect to system types, equipment selections, and control sequences, the future operations professionals have an opportunity to contribute their real-life, in-the-trenches experiences to benefit a new construction or major renovation project. This month, I am going to cover what can happen at the end of construction if the design engineers have not incorporated reasonable and affordable facilities staff requests into the project requirements and how that impacts the commissioning process.

In my experience, this scenario is only likely to happen on projects for large institutional facilities with smart and conscientious in-house facilities engineering departments. These facilities operators know their buildings, systems, priorities, and what works best for them better than anyone else, and that’s how they feel about it. When they see a project design requirement which they believe will not work, typically based on past experience, that is the beginning of a major challenge for the commissioning professional. When that requirement was specifically objected to by the operations team during design, you know there’s going to be trouble.

It is not uncommon for us to hear the following comment from the owner’s operations staff: “We’ll be changing that after the project is over.” At this point, the issues are most often control system sequences of operation. This results in a conundrum for the commissioning professional hired by the owner to confirm that the systems function properly and are accurately documented at the end of construction.

  • Does the commissioning professional press on to demonstrate compliance with the design requirements, knowing that work may be of diminished value when the owner changes the system operation after accepting the building?

  • Does the commissioning professional help the owner push for changeorders to achieve the preferred facility operations system performance?

The appropriate answer is project-dependent and owner-dependent, but it is something the commissioning professional needs to proactively evaluate and work with the owner to decide. The following are some considerations that will influence the decision.

  • Changeorders will come with a financial and schedule cost at the end of construction. If the owner’s project manager’s main priority is an on-budget/on-schedule project, the operations department may need to defer their modifications until after accepting the systems as designed.

  • Pushing for changeorders at the end of construction is similar to directing the design engineers during design to do something the design team does not believe is right. The owner risks confusing the liability issue if things don’t work in the end.

  • If the project is not following strict, traditional design/bid/build protocols, it may be simpler to incorporate changes late in the project. Controls contractors, in particular, may be willing to modify their work based on verbal or casual written requests from the owner. However, this can also mess up the liability trail and risks incomplete/inaccurate as-built documentation.

  • There is the possibility that if the systems are commissioned as designed and function well that the operations staff may be convinced that the systems are okay.

  • If commissioning of the systems as designed is completed and fully documented as part of the project, can the owner engage the commissioning professional in the process of modifying the controls after building acceptance? Commissioning of the modifications could help ensure that whatever changes the owner makes don’t affect the performance of other integrated building systems.

  • Should the final commissioning report and/or systems documentation prepared by the commissioning professional be deferred until the owner has completed their modifications so that the documentation can be as accurate as possible? This seems imperative if the owner values the systems-level documentation inherent to a professional commissioning process.
In summary, it gets very dicey during commissioning when the systems design does not meet with the facilities operators’ approval. Sentiments run particularly high on the operations side if the systems do not include features and sequences requested during the design phase.

As with most things related to commissioning, it is preferable to have these issues resolved to the owner’s satisfaction before arriving at the end of construction. That is one of the purposes of design-phase commissioning, but it is not uncommon to have commissioning or owner design review comments linger into the construction phase only to become major issues at the end. Everyone on the project team needs to be aware of the risks associated with not fully resolving outstanding owner concerns in a timely fashion. ES

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Air Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Condensing Furnace

    Department of Energy Considers the End of Noncondensing Gas Furnaces, Water Heaters

    See More
  • Nearly Half of Americans Will Have Smart Home Technology by the End of 2016

    See More
  • The High End Of Commercial Products

    See More

Related Products

See More Products
  • Building Information Modeling: Planning and Managing Construction Projects with 4D CAD and Simulations

  • 1966.gif

    HVAC Duct Construction Standards - Metal and Flexible

See More Products

Related Directories

  • National Assn. of Women in Construction-NAWIC

    NAWIC, the premier association for women in construction, provides education, professional development, and networking opportunities to over 5,000 members across the U.S.
  • AABC Commissioning Group (ACG)

    The AABC Commissioning Group (ACG) is a non-profit dedicated to advancing independent commissioning professionals through education, training, and certification since 2004.
  • Fire-End & Croker Corp.

    Since 1911, Croker has Provided Exceptional Service and the Finest in Fire Hose and Standpipe Equipment.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing