search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsVentilation and IAQCase in PointHealth Care HVAC

Texas hospital increases service, decreases footprint

November 1, 2010
New air handlers at Dell Children’s Medical Center helped the hospital achieve LEED® Platinum status.


When Dell Children’s Medical Center began the development of its new facility in Austin, TX, the organization established a compelling vision: to heal children without harming the environment. That’s no easy task for a power-intensive industry like health care.

The 500,000-sq-ft facility that opened in July 2007 achieved its mission through sustainable design, green materials, and energy-efficient systems. Air handlers from Temtrol® support the organization’s green initiatives. In addition, Dell Children’s Medical Center recently installed a Temtrol unit with FANWALL TECHNOLOGY that manages critical ventilation in a 6,500-sq-ft intra-operative MRI surgical area.

In March 2009, the USGBC recognized Dell Children’s Medical Center with LEED® Platinum certification. The facility is the world’s first LEED Platinum hospital.

CONNECTING CONSTRUCTION TO CARE QUALITY

“The decision to ‘build green’ started early and encompassed all aspects of the Dell Children’s Medical Center project,” explains Phil Risner, P.E., Dell Children’s senior project manager and mechanical engineer. “There’s a definite connection between a healthy environment and improved patient outcomes,” he states. “Our vision with this new facility was to create a truly green hospital, to set new standards for our industry.”

From its location to its components, the hospital raises the bar for sustainable design and energy efficiency. The Dell Children’s facility sits on the site of the former Austin Mueller Airport, a brownfield that was painstakingly recycled and reclaimed as part of the green build process.

WELCOMING CHILDREN AND FAMILIES

Unlike traditional health care facilities that tower many stories surrounded by concrete, Dell Children’s occupies a modest low-rise layout, with wings set up like a pinwheel. Preferential parking is reserved for carpools and hybrid vehicles. Several garden areas feature prominently, including a rooftop green area with a penthouse structure to conceal the new Temtrol FANWALL air handler. The entire design creates a less intimidating approach for the young patients that Dell Children’s serves. Dell Children’s features a variety of high-tech and green solutions, including high-efficiency fluorescent lights equipped with motion sensors, a high albedo roof to reduce the effects of the urban “heat island,” and finishes and floorings that are low in volatile organic compounds (VOCs).

Natural light penetrates more than 80% of the building’s interior. A clean-burning natural gas plant on the hospital grounds generates electricity and uses waste heat to produce chilled water and steam for the entire site and surrounding area.

IDEAS TO IMPLEMENTATION

When it came to A/C and ventilation, the CES Group’s representative, Rusty Vaughn of Texas AirSystems in Dallas, assisted Dell with the initial design and implementation of the facility’s air-handling system in 2007, and returned in 2009 to install the FANWALL unit.

Texas AirSystems worked in conjunction with CCRD Partners of Dallas, the lead engineering firm, and Risner’s team at Dell to meet their air quality and efficiency objectives.

“It was critical to us to create an optimal facility that not only supported quality care but also enhanced our surroundings,” Risner explains. Hospitals are notorious for high capacity energy usage. According to the UUSGBC, health care facilities use nearly twice as much energy per square foot as office buildings, accounting for over $3 billion annually just in electricity costs. With its current system, however, Dell Children’s saves enough energy every day to heat and cool approximately 30 average-sized Austin homes.

FUTURE CAPACITY

FANWALL TECHNOLOGY’s compact design is energy-efficient and quiet, and completely re-engineers how air moves. Unlike traditional air handlers that are comprised of one or two large fans, the air handler with a FANWALL array delivers airflow and meets redundancy requirements through smaller, manageable fan arrays that fit constrained areas. The new air handler with FANWALL measures 31- x 7- x 6-ft and is comprised of four direct-drive fans capable of 12,000 cfm and an additional 3,000 cfm of backup.

“Chief considerations for the Dell Children’s project - and for many health care facilities - were adequate redundancy for the operating rooms, acoustical performance, and capacity for future expansion,” explains Meers. “With a traditional unit, to achieve 100% redundancy requires a really big box,” he says. “With FANWALL TECHNOLOGY, because you’re using direct-drive fans, you only need 25% of the size as a backup, and that takes a much smaller footprint.”

The new Dell Children’s installation serves an intra-operative MRI operating room and a diagnostic MRI room, with additional “shell” space for future needs. The current project requires approximately 9,000 cfm, enabling the hospital to easily expand without the expense of adding or replacing its air handlers.

“We have four fans, but we only need to run three at any time,” Meers says. “The advantage of multiple fans is that unlike bigger units, the FANWALL array can be sized for 100% of future capacity. We handle hospital projects all over the country, and that’s a common need.” FANWALL’s quiet acoustical performance also supports the sensitive medical technology to be housed in the new wing, which can be disrupted by intensive vibrations. “The FANWALL is quiet - hardly noticeable,” adds Risner.

DESIGN ADVANTAGES

Another benefit of the air handler with a FANWALL array is reduced maintenance. Because it is comprised of an array of direct-drive assemblies, FANWALL eliminates moving parts commonly prone to repair, such as, external fan shaft bearings and wear items like belts and pulleys.

The air handler with FANWALL on this project has all the ‘bells and whistles’ - redundancy capacity, airside economizers, HEPA filtering, and UV lights in the coil section to reduce airborne bacteria - but it is all contained in a less than 35-ft-long unit.

With the unit up and running for almost a year, Risner is satisfied with its performance.

“Everyone at Temtrol, Texas AirSystems and the CES Group is grateful and pleased to be part of the team that created and delivered this solution,” added Vaughn. “It’s a credit to Dell Children’s Medical Center and the CCRD staff, who pulled the key players together to work for the best solution for a given application. It’s a great fit for the facility and the environment.”  ES

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Air Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Building management platform provides Texas hospital with a bird's eye view

    See More
  • From the factory floor

    Fast-Tracking a Texas Hospital's HVAC Upgrade Using Grooved Pipe-Joining Technology

    See More
  • Restaurant Increases Comfort, Decreases Bills

    See More

Related Products

See More Products
  • ac.png

    Air Conditioning Service Guide R-410A and R-22 Systems 2nd Edition

  • HPOIS.png

    Heat Pump Operation, Installation, Service

  • Service-Management-Excellence-Image-2A.jpg

    Service Management Excellence

See More Products
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing