search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSCase in Point

What to do when the piping replacement needs a replacement?

November 1, 2009
Polypropylene was used at this Florida retirement community to repair the piping system and save 10% to 15% in first cost.


Water challenges, chemical interactions, and other factors led an Orlando MEP service company to polypropylene piping, which fit the bill perfectly.

Located in Leesburg, FL, Lake Port Square has 398 individual apartments located in two residential buildings and offers a “life care contract” guaranteeing that residents will never be forced to leave their home. In such a high-end facility, operation and maintenance - especially in the mechanical system - is taken seriously.

Orlando-based Westbrook Service Corporation has served as the roughly 14-yr-old facility’s mechanical system and maintenance contractor since 2005. The five-story, 287,000-sq-ft Lakeside East and its apartments (ranging in size from 600 sq ft to 1,860 sq ft) had been served by two original 450-ton centrifugal chillers.

In May 2006, Westbrook was hired to replace the existing chillers. However, when purging the air from the chiller system, leaks were discovered piping throughout the building. Westbrook’s general manager of commercial HVAC, Don Hammond explained that with the system pressurized to 110 psi, the schedule 80 steel pipe showed pinhole leaks “everywhere in the building.”

Paper-thin Pipe

“From our best guess, it was from a combination of a lack of treatment of the closed loop piping system over the years, and the fiberglass insulation had been serving as a breeding ground for rust as a result of condensation,” Hammond recalled. So for two years, Westbrook tried convincing the facility owner to replace the leaking pipes and also the building’s original fancoil units (FCUs), which were installed above closets in the apartment units and difficult to access for maintenance.

Finally, in August 2008, Westbrook was contracted to install new floor-mounted FCUs and to replace all leaking schedule 80 piping with CPVC piping. Within the first few weeks of the installation, Westbrook began noticing progressively worsening leaks in the CPVC. “The first thing you think is that the guys must not have glued the fittings right, but then we saw they were glued right and that there were actually cracks in some spots,” Hammond recalled.

Westbrook discovered that the new FCUs and the water control valves contained polyolester (POE) oil, an ester-based grease commonly included in mechanical system components as a lubricant. The oil can wash out of the components and coat the inside of the CPVC pipes, causing them to crack (known as environmental stress cracking).

Since residents were displaced from their homes, the firm couldn’t halt the project, so it switched to copper piping while exploring other piping options. Hammond explained that copper wasn’t preferred because of very high prices and acidic local water conditions. However, since the closed loop system is being treated with Nalco Company additives, the copper should hold up, he said.

A Polypropylene Solution

Yet, upon researching CPVC/POE oil interactions and copper pipe alternatives, Hammond was quickly convinced that polypropylene was the best option. Working with Ferguson Enterprises’ Orlando office, he learned about Aquatherm, Inc.’s polypropylene piping, which is so corrosion resistant that it’s often used in acid waste applications.

The heat fusion welding process used to join the Aquatherm pipe and fittings is so leak-proof that it is used in natural gas piping applications and has been used in more than 70 countries for over three decades.

“It was a fast-track job and once the CPVC failed, we knew that doing copper on the whole job would break the bank, so this was a phenomenal option. The product was basically impervious to anything that would be in our system,” Hammond recalled.

Following training sessions conducted by Aquatherm and Ferguson and the purchase of four Aquatherm manual welding irons, the installation began in September. Over the first few installation days the Westbrook crew familiarized themselves with heat fusion, in which the pipe and fitting are placed on an iron for a specified time (typically only seconds) then pushed together to form a homogeneous bond. However, once the crew was up and running, the process shaved several labor days off of the project, Hammond said.

Westbrook installed roughly 5,000 lineal feet of .25-in. to 1.50-in. Aquatherm Climatherm - specifically designed for HVAC applications - and thousands of fittings. With excellent rigidity and thermal expansion characteristics, the pipe also offered a natural insulation value of R-1. “Instead of 1.50-in. foamglass, we were able to use only .75-in. Armaflex insulation,” Hammond said, adding that this saved an estimated 10% to 15% on the job.

Labor Savings

“Using the polypropylene made everything go super-quick - we just fused it and let it set for a few minutes, where with the CPVC we had to let the glue set for 24 hours, and that alone saved a day on the job,” Hammond said. Lake Port Square’s director of engineering, Dave Shields, added that heat fusion also saved his staff time when it came to closing up walls, carpentry, and painting.

The project concluded in January 2009, and Hammond estimated he saved 11 man days per riser - with 40 risers on the job. All parties involved are quite satisfied with the end result and the savings.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Contracting
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Commercial Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • What to Do When the Wire Diagram Is Missing?

    See More
  • What Are You Going to Do When the Well Runs Dry?

    See More
  • What To Do When an HVACR Customer Leaves a Really Bad Online Review - The ACHR News

    What To Do When an HVACR Customer Leaves a Really Bad Online Review

    See More

Related Products

See More Products
  • The ACHR News - June 16, 2025

    ACHR NEWS June 16, 2025, Issue

  • air came to a stop.jpg

    The Air Came to a Stop

  • Lessons Learned in a Boiler Room: A common sense approach to servicing and installing commercial boilers

See More Products

Events

View AllSubmit An Event
  • April 14, 2026

    Inside HVAC Lending: What Contractors Need to Know to Close More Sales

    On Demand From this webinar, attendees will learn how to use financing as a strategic sales tool for growth in a repair market. 
  • December 9, 2025

    Beyond Smart Buildings: Why BMS Needs to Move Past Division 23 — For Every Building

    On Demand Let’s reframe Division 25 not as a lofty ideal, but as a practical and alternate approach to specifying facility systems such as a building management systems (BMS).
View AllSubmit An Event

Related Directories

  • Carrier, Replacement Components

    Replacements Components is the parts division of Carrier dedicated to after sale support of the Carrier/Bryant/Payne/ICP equipment brands.
  • A to Z Sales & Marketing

    We strive to revolutionize indoor living through innovative solutions that improve air quality, enhance comfort, and promote sustainable living for people around the world.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing