search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering TechnologyHeating & Boilers

Don't Get Burned By A Boiler Retrofit Project

By John R. Puskar P.E.
January 9, 2009

When it comes to that unexpected (and unwelcome) development, it’s usually less a case of if than when. Avoiding confusion over the specific technical scope of work up front, keeping an eye on codes and insurance, and considering contingencies for discovered problems along the way will smooth the path as much as possible.

It seems simple enough doesn’t it? I need a new burner or controls for my boiler, furnace, or oven, and you have these to sell. You give me a price, do the work, and then we’re all happy, right?

Wrong! Unless we do some very careful planning and communicate very carefully, we could be in for trouble. All too often, our firm is hired by many of our clients in the role of arbitrator, mediator, and neutral third-party expert on projects that have gone wrong. The end result of these projects gone wrong can range from damaged equipment that is out of service for months, to long and ugly lawsuits. What’s even worse is the wasted money and time on the part of the equipment owner.

Project Scoping and Responsibilities

We encounter very few OEMs that make their own burners and control systems. Therefore, calling them back in often brings no peace of mind for a correct and functioning project. Retrofits are a different animal. You are asking someone to try to fix, in some cases, years of neglect and a history of changes made to a piece of equipment.

For example, in the case of a boiler that is getting a new low NOx burner, there are several issues that can make for disappointment. Sometimes, conditions inside the boiler itself may have changed over the years, such as the spacing of tubes between passes that can make for leaked CO rich flue gas to the flue. This is not the fault of the burner, but it would most likely be discovered in the burner commissioning process. Whose fault is this? How do you as a customer feel when you are told the burner does not meet performance expectations but it is not the burner vendor’s fault?

What about a furnace or oven where the contractor starts to tear into that “snake pit” of a junction box and finds out things are not as they seemed? What happens now? Is it fair for the contractor to eat 25 years of sins and problems?

No retrofit project should commence without a formal meeting to discuss all of the problems that could crop up and all of the possible contingencies. Better that everyone knows that even under the best of circumstances sometimes these projects do not go well, rather than to try and deal with this later.

Safety Devices and Close-Outs

It should be understood that changing anything regarding the piping of a fuel train should trigger certain automatic events, regardless of what anyone thought the scope was. For example, any time a fuel train is opened up for any reason, the tightness of all automatic valves in a system should be checked immediately prior to putting the device back into service. They should again be checked within two weeks, and then again after three months before the normal annual schedule is continued. Opening up any fuel train creates the risk of passing contamination down into valve sealing areas.

The other issue that becomes very important is properly closing out a retrofit. Every retrofit project should include a contractor verifying the functionality of all safety devices in every possible failure mode, and the verification of the correct setpoints and calibration of all control and safety devices, whether they were part of the project or not. Complete combustion fuel/air ration setting and verification should follow. Of course, this kind of attention to detail should be built into the original pricing and project scope.

It is also important to understand that testing and calibration can mean the discovery of problems. You cannot ask a contractor to be responsible for the cost of replacing failed components, deriving switch setpoints that were never correct, and/or the replacement of devices or the discovery of issues that may have been a problem for years. Here is where you need to have confidence in whoever you are using and make sure that you have a source for a second opinion.

It also makes sense to ensure that whoever you are using is able to provide you with an analysis of how your current equipment and safety systems match up with the current versions of the latest applicable safety codes. This would be NFPA 85 for boilers and NFPA 86 for ovens and furnaces (available at www.nfpa.org). It may be illegal to do a partial retrofit in some states and not make a piece of equipment totally compliant with the latest code version.

Please remember that any time a piece of equipment’s flame safety or control logic is modified, you should involve your insurance provider. This is usually your property and casualty (fire) insurance company for ovens and furnaces, and/or fuel train or burner changes on boilers. In most cases, they will want to review what you are doing, including approving drawings. You need to build in approximately one month into your project schedule for these reviews.

The Start Sets The Tone

Retrofitting fuel trains, controls, and burners is not a simple or straightforward process. When someone says they are upgrading controls, remember there are two systems they could be referring to. Every piece of fuel-fired equipment has two control systems, the CCS (sometimes called the combustion control system) and the BMS (burner management system or safety controls). These are usually two separate and distinct systems. Make sure everyone’s talking about the same thing.

It is important to make sure that everyone enters into these projects with wide-open eyes. They need to communicate often, budget properly, and have the proper insurance folks involved for reviews, all before implementing a rigorous and well-defined close-out process. It does not have to get ugly or be difficult, but it can sure get that way in a hurry if you are not prepared. ES

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Es puskar headshot 900x550
John Puskar has been practicing in the fired equipment and boiler safety and energy world for more than 40 years. He is a licensed Mechanical Engineer in six states and holds nearly every contractor license offered by the state of Ohio, including for fire protection and alarm disciplines. Puskar is a coauthor of Associated of Energy Engineers’ (AEE’s) Certified Industrial Energy Practitioner Program and a certified energy manager (CEM). Puskar has done more than 200 commercial and industrial energy audits over his career. His body of energy-related work includes performance contracting with industrial clients on boiler and chiller retrofit projects. One of his former companies, CEC Consultants Inc. earned the DOE Energy Star Ally of the Year award presented in Washington, D.C. Puskar is also the founder of CEC Combustion Services. This firm provided risk management audits, training, retrofits, and gas hazards management in more than 30 countries. He grew the firm from himself in the upstairs of his house to 43 people and over $10 million in annual sales before selling the firm in 2011. Today, the firm is owned by Honeywell and is known as Honeywell Combustion Services Group. In 2014, his book, “Fuels and Combustion Systems Safety – “What you don’t know can KILL you!” was published by Wiley and Sons. He was presented with one of ASME’s highest national awards, the Uzgiris-Barnett Product Safety Medal, for his lifetime contribution and innovations in the industrial safety world in 2015. Puskar currently serves on the NFPA 54, 56, 59A, 85, and 820 committees and has also been on the 86 committee, ASME CSD-1, and API 54 committees. He has authored more than 100 journal and magazine articles and has presented at more than 100 conferences and training workshops.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    News
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Residential Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Boiler Safety On The Front Burner

    See More
  • chiller piping and air handlers

    Four Lessons from a Chiller Job that Apply to Every Project

    See More
  • Getting a new retrofit boiler

    Ten Things to Think About as Your New Boiler Journey Begins

    See More

Related Products

See More Products
  • Lessons Learned in a Boiler Room: A common sense approach to servicing and installing commercial boilers

  • Training-Managing-System-2017.jpg

    Customer Service Training & Managing System by Steve Coscia

  • Training-System-2017.jpg

    Customer Service Training System by Steve Coscia

See More Products

Events

View AllSubmit An Event
  • September 23, 2025

    How to Get Found First and Chosen Fast

    On Demand When a customer needs help, they don’t wait around—they choose the first business they find and hear back from. This webinar will cover how to get noticed online, capture every lead, and win more business without adding extra staff or hours.
View AllSubmit An Event
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing