search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSCase in Point

"Invisible" exhaust stacks give pharmaceutical maker a cure for uncommon code

May 31, 2002
The new research facility of Syrrx Pharmaceuticals, Inc. is somewhat unusual, in that its roof exhaust system's stack is not very visible at all. This 84,000-sq-ft high-tech facility, designed for advanced pharmaceutical research applications, contains several hundred individual laboratory workstations with dedicated exhaust fume hoods, which occupy about 80% of building space. The balance is devoted to common area and administrative offices.

Because of the nature of the research conducted there, the building requires 100% conditioned makeup air. The question is, how do you exhaust hundreds of laboratory workstations to eliminate exhaust re-entrainment, air pollution, neighborhood odors, and noise, yet conform to an extremely tough building code that restricts overall height to only 30 ft?

Keep it short

"That's a tall order for a short building," says Dean Shellenberger, who adds that the California Coastal Commission building height restriction of 30 ft (the building is three stories high), "made it nearly impossible to use conventional centrifugal fans for this application." Shellenberger's firm, Randall Lamb & Associates (San Diego), was responsible for designing the hvac systems for four control areas within the building. Included in this task was design and specification for exhausting the laboratory workstation fume hoods safely, efficiently, and quietly.

The building height restriction, as well as building construction, operating, and maintenance costs, presented challenging engineering problems that demanded "thinking out of the box" solutions, according to Paul Eiler, the director of facilities at Syrrx.

Eiler, who is responsible for the company's facilities' construction, retrofitting, and daily operations, worked closely with Shellenberger as well as with Mike Fiorito and Mike Richardson at Custom Mechanical Sales (San Diego), a manufacturer's representative marketing custom hvac equipment for laboratories, universities, hospitals, and many high-tech industries.

In their efforts to go "outside of the box" to meet this unique engineering challenge, they arrived instead at an "inside the box" solution. That is, to use mixed-flow impeller technology systems from Strobic Air Corporation (Harleysville, PA) to exhaust the fume hoods and mount those systems inside the building.

As a result there are virtually no exhaust stacks visible from the property line. In fact, the exhaust stacks at Syrrx extend only about 10 in. above the roof, which is surrounded by a parapet.

In commenting on this installation, Eiler says that, "With that type of height restriction, many times air handlers and exhaust fans must be mounted on mezzanine roofs or on ground floors. With valuable space needed inside this building, the only way we could really accommodate this installation was to put the air handlers in the basement (for recirculating the conditioned air) and mount the laboratory workstation fume hood exhaust fans in the building itself."

He adds that because the exhaust fans couldn't be mounted on the roof of the building, conventional centrifugal fans (with their dedicated, tall stacks) were ruled out.

With regard to the engineering and design issues faced by Syrrx, Eiler says that the length of the ductwork necessary for centrifugal fans (which were evaluated before selecting mixed-flow impeller fans) was "quite long in order to be able to get the necessary pipe diameters away from the building, so as not to cause a lot of turbulence and possible re-entrainment problems.

To make the transition from vertical to horizontal, the elbows, flex connectors, and associated ductwork needed would waste too much valuable space. Also, the inlet configurations for the mixed-flow impeller fans required substantially less space." On the other hand, Eiler continues, "none of these problems existed with mixed-flow impeller systems."

The laboratory workstation fume hoods at Syrrx are exhausted through four sets of two mixed-flow impeller fans each (two fans each mounted on common plenums). Four of the fans in the systems use 25-hp motors (providing 25,000 cfm at 3 in./static pressure [sp]); four use 20-hp motors (20,000 cfm at 3 in./sp). The fans are virtually maintenance free, with the exception of greaseable bearings; there are no pulleys or belts to maintain.

The Syrrx facility requires 100% conditioned makeup air. Eiler says this is a "single path type of situation - no recirculated air at all is allowed back into the building." In addition, all of the mixed-flow impeller fans provide vav capability for efficiency and cost savings.

The sound of silence

The issue of noise generation must automatically be addressed when dealing with workstation fume hood exhaust systems situated inside a building (virtually adjacent to work areas). Shellenberger solved this problem by incorporating unique, fiberglass, reinforced plastic, in-line acoustical silencer nozzles on each exhaust fan.

In addition, the areas where the fans are located were insulated with fiberglass on the walls and ceilings. "The ones that are most closely adjacent to the people in offices or workstations use heavier sound insulation material than in other places where the fans were located more remotely," Eiler says. As a result, noise is not a factor, he adds.

Eiler also worked closely with Randall Lamb in the planning stages of the building's entire hvac system. Two of his main concerns for the laboratory workstation fume hood exhaust application were vibration and space requirements. "We knew there wasn't room outside the building for centrifugal fans; the distance to the mechanical yard would have been just too great.

To use conventional centrifugal fans inside the building would have consumed many, many square feet of valuable floor space that had to be dedicated to laboratories," he adds, "and the use of mixed-flow impeller technology permitted significantly more laboratory space rather than consuming it with fan rooms."

The Syrrx facility was officially opened in mid-March. Even with this short experience history, both Shellenberger and Eiler are pleased with the performance of the mixed-flow impeller systems.

The laboratory workstation fume hood exhaust systems at Syrrx are meeting or exceeding expectations. And when you look at the building, you'd hardly tell there's an exhaust system on the roof at all! Which proves a point: While it is always smart to "think outside the box" when facing a difficult design challenge, there are times when the solution is right there for you "inside the box" (or at least inside the building). ES

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    News
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Air Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • A cure for the dreaded 'Dirty Sock Syndrome'?

    See More
  • Finding a Cure for Copper Theft

    See More
  • Optimization process locates cure for pharma lab's energy ailments

    See More

Related Products

See More Products
  • 21nrdpA-WVL.jpg

    2024 Uniform Mechanical Code Soft Cover w/Tabs

  • Lessons Learned in a Boiler Room: A common sense approach to servicing and installing commercial boilers

  • math.jpg

    Math for the Technician

See More Products

Events

View AllSubmit An Event
  • January 16, 2014

    Instrumentation for Water/Wastewater Operations, Course Code: EO0701CA14

    Do you know the whys and hows behind flow meters to pressure gauges and everything in between?
  • December 19, 2013

    Introduction to Hydraulics, Course Code: EO0715CA14

    The course is designed to cover the basic principles of hydraulics that apply to most trades.
View AllSubmit An Event

Related Directories

  • Coded Energy Inc.

    Kwik Model 3D EAGLE is an easy-to-use 3D residential HVAC design software (load calcs and duct design). No CAD experience needed! Now importing LiDAR scans!
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing