In this overview of building information modeling, the authors review how BIM helped in three different projects, often with particular usage- and efficiency-based HVAC demands. While BIM’s space management skills can reduce costly changeorders and building design “clashes” ahead of time, in at least one instance, using BIM actually influenced the HVAC strategy for the better, too. See how HGA Architects and Engineers has used this to become a “model” firm.
A lot has happened since the author’s 2008
article. It’s prime time to revisit expectations for BAS and chiller
optimization controls, and then have a look at several of today’s options for
anyone managing chilled water flow to wring the last drop of efficiency out of
a system.
Here, our long-time forward-thinking columnist uses a common hospital scenario to walk you through the shift from Design-Bid-Build to an Integrated Project Delivery approach. See how the job can get done with similar personnel on a considerably shorter schedule, resulting in a greater team investment in the project’s success and yet more time to get on to other work.