search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Home » Topics » Engineered Systems NEWS

Engineered Systems NEWS
Engineered Systems NEWS RSS Feed RSS

Stat

Wireless Pneumatic Thermostats Deliver Smoother Upgrade

Ron Wilkinson
October 31, 2012
Follow the engineer at a large hospital complex in Phoenix as he pursues less disruptive and less expensive ways to boost BAS performance and budget wellness, all in the name of patient comfort.
Read More
dehumidification

Energy-Efficient Dehumidification In Health Care Facilities

Jared Edwards
October 31, 2012
With a wide spectrum of specialized spaces and particular outside air requirements, a hospital’s en-ergy-efficiency efforts start when arranging which areas go where. From there, the author leaves no technology unturned — chilled beams, geothermal, DOAS, VRF, etc. — in evaluating which ap-proaches might best contribute proper ventilation and humidity in which environments, with an eye on minimizing facility energy consumption.
Read More

The Importance Of Facility Air Balance

Luke Facemyer
October 31, 2012
Brush up on the environmental factors that can throw things out of, well, balance, and note how space pressure problems can create assorted complications.
Read More
Building Automations
Commissioning

Data Integration During Construction

Rebecca T. Ellis, P.E.
October 31, 2012
The commissioning agent can steer this to avoid data paralysis later.
Read More
Air conditioning
Case In Point

Health care air conditioner replacement turns into no tall order

October 30, 2012
New York City is certainly renowned for the quantity and variety of tall buildings towering over the Manhattan skyline. Many of these structures are at a point where age has taken its toll on mechanical systems and now require replacement. Even if they are still operational, today’s new A/C systems are more energy efficient, making it cost effective for changeout.
Read More
Issues and Events

Lonmark International and OpenADR Alliance agreement enables building-to-grid connectivity

October 27, 2012

Commercial buildings will soon be able to connect to the “Smart Grid” with ease thanks to a new strategic relationship between industry alliances LonMark® International and OpenADR, say the organizations. LonMark and the OpenADR Alliance, a nonprofit corporation created to foster the development, adoption and compliance of a Smart Grid standard known as Open Automated Demand Response (OpenADR), are working together to enable interoperability between certified products that will better enable commercial buildings to manage their energy uses on the Smart Grid.


Read More
Thumbs up and down

Commercial vs. Industrial Automation In Data Centers

Sean Graham, P.E.
October 19, 2012
Since data centers are atypical in several aspects, unique BMS approaches are required to optimize their control, monitoring, and operation. Learn why it is important to know the detailed pros and cons between commercial and industrial automation system hardware, software, and instrumentation as you consider the facility’s automation design and associated costs.
Read More
Hybrid Heat Pump System

Right Steps For Retrofits

Kendra Tupper, P.E.
October 19, 2012
Achieving deep energy savings is especially challenging when you’re faced with an existing structure with poor orientation, historic preservation requirements, and little space for renewables. The Byron Rogers Federal Office Building’s retrofit is scheduled to be completed in 2013; the post-renovation building is projected to consume less than half the energy it did before.
Read More
Auditorium
Case In Point

Cancer center finds peace and quiet with duct liner

October 19, 2012
A lot will happen under the single rooftop of the new Wesley Long Cancer Center in Greensboro, NC. The 33,000-sq-ft addition to the Moses Cone Regional Cancer Center includes a business office, lobby/waiting area, admitting, phlebotomy lab, breast cancer treatment, exam areas, chemotherapy, an auditorium, and education classrooms.
Read More
Building Automations
Guest Column

Slim BIM: Getting Elephants To Dance

Mr. Toby Considine
October 19, 2012
Two different specifications, the Army, and others are pushing building information toward the future.
Read More
Previous 1 2 … 631 632 633 634 635 636 637 638 639 … 834 835 Next

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing