search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering TechnologyToday's BoilerHeating & Boilers

TODAYS BOILER | MAY 2024

Quick Boiler Replacement Avoids Sepsis

Replacing a wastewater treatment plant’s compromised, 1999, firebox-style boiler with a tube leak.

By Nick Genovese
The old, compromised, 1999, firebox-style boiler that once sat at the local wastewater treatment plant.

FIGURE 1. The old, compromised, 1999, firebox-style boiler that once sat at the local wastewater treatment plant.

All images courtesy of Cole Industrial


May 24, 2024

Over the summer, a member of Cole Industrial’s service team contacted a local municipality regarding its wastewater treatment plant (WWTP) to evaluate a compromised 1999, firebox-style boiler. The boiler was built to be a dual-fuel system capable of digester biogas and natural gas firing. The system had a newer fuel train and burner installed in 2015 but was ultimately a continuing problem, finally resulting in a moderate yet concerning tube leak starting early in 2023 and gradually getting worse. The primary factor for success was the recovery of thermal input to the WWTP’s digester systems. During summer months, required thermal input is reduced yet still very necessary to achieve 98°-99ºF optimal digester temperatures. Administrators made the decision to go completely off the digester biogas to avoid the continuing headaches of burning biogas and wanted to go to a clean, reliable, and efficient natural gas option.

Cole Industrial’s rental and new equipment sales groups teamed up to help the WWTP supervisor with some solutions. With the Cleaver-Brooks Clearfire CE boiler stock program and Cole’s repair division capabilities, the team could demo the current system; deliver, install, and commission a new CFC-E boiler; and recover thermal input to the city’s wastewater digesters before they dropped to critical temps of 85º and below. This is the point at which the sewage-eating microbiological “bugs” started dying off and the system became anoxic and septic, requiring a major expense to haul out the affected waste and an all-hands-on-deck situation to locate bugs from a nearby WWTP, seed the digesters, and slowly rebuild the biological base for them to recover and operate normally and at capacity.

The city was motivated to move forward, and the supervisor went to the mayor and city council to procure short-term funding with an emergency status project in hand. A city contract was delivered, reviewed immediately, and signed/returned to the customer the same day. The boiler was delivered from the Cleaver-Brooks stock program one week after the order. The new exhaust stack was not far behind. One complicating factor was the requirement to replace the stack with upgraded materials due to the new condensing boiler replacing a noncondensing boiler. This was not considered a complication for Cole Industrial’s repair division.

The repair group began work on the project and had the old boiler demolished and staged for removal on day one, much to the amazement of the city operations staff. Ancillary work continued into day two and, by day three, the new boiler had been set in place. By day six, the boiler had been fully piped into gas, water, and stack connections and wired by a city-provided electrical contractor. The city operations staff was reaching out to Cole Industrial’s service group for advice even before Cole’s technicians arrived to start up the boiler on day seven. The hydronic systems were then back online, and the bugs started getting comfortable again after experiencing some cooling down to about 89º. With some room, but not much to spare, the city’s WWTP operations staff slowly started bringing digester temperatures back up to the 99° sweet spot, and the systems smoothed out and have been working well ever since. Following up with commissioning, Cole’s service group provided a system check, handoff, and training session with the WWTP staff to complete the project. 

Out with the old, in with the new

The whole project, including demolition, took only seven days. The final handoff to the customer was completed in just 13 days. The head operator has reached out to Cole’s service group by phone several times with questions since the startup, and Cole has been able to provide ongoing support. Not to mention, the WWTP supervisor had been on vacation during the entirety of the project. His staff wanted him to return to a successfully completed project, and they made it happen.

The supervisor reported back to the mayor and city council on the project’s success and his satisfaction, stating, “I’ve been telling everybody about this job and how the Cole team came through for us.” 

FIGURE 2. The new unit, as it was being installed.

FIGURE 3. The new unit, following installation.


Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Nick Genovese, account manager, Cole Industrial Inc.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Commercial Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Case In Point

    Quick Boiler Replacement Keeps Soft Drink Production From Getting Bottled Up

    See More
  • Facility Files

    Corporate Building Boiler Replacement - Design-Bid-Build Project

    See More
  • Boiler replacement Brews up 15% Savings for Labatt

    See More

Related Products

See More Products
  • quick guide.png

    Quick Guide to Refrig Cycle, Refrigerants, Components

  • 9781482253894.jpg

    Boiler Operator's Handbook, Second Edition

  • Lessons Learned in a Boiler Room: A common sense approach to servicing and installing commercial boilers

See More Products

Related Directories

  • Carrier, Replacement Components

    Replacements Components is the parts division of Carrier dedicated to after sale support of the Carrier/Bryant/Payne/ICP equipment brands.
  • measureQuick®

    measureQuick is an application that technicians use to display measurements from arrayed smart tools, run equipment diagnostics, view just-in-time education and resources, generate easy-to-read homeowner-facing PDF reports and more.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing