search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessHigh-Performance Buildings & AutomationCommercial HVAC

Consider State-Based Sequences When Programming HVAC Controls

Opting for simple or complex sequences largely depends on the building operator’s skill and talent.

By Phil Zito
Phil Zito
February 17, 2020

Last month, I started to explore when to use simple sequences and when to use complex sequences. Part of creating the correct sequence lies in the proper use of technology. 

For example, let’s look at dehumidification sequences. These sequences are fairly common in most of the southern U.S., yet it has been my experience that dehumidification sequences are often improperly implemented, despite how common these sequences are.

This provides us with a perfect scenario to illustrate the approach of building a simple or complex sequence.

Let’s look at a simple sequence utilizing subcooling and reheat.

On a call for dehumidification, the refrigeration circuit will start, operate, and reject its recovered waste heat to the air hot gas reheat coil condenser.

This is a very straight-forward sequence that will operate effectively in most packaged rooftop units and can be executed via embedded nonprogrammable controls. The building automation technician would simply need to set a specified dehumidification set point, and the unit would control to the set point.

Now, contrast this to a complex dehumidification sequence.

3.2.6.7 Cooling and Dehumidification Coil Control: When this loop is enabled, the direct digital control (DDC) hardware shall modulate the cooling and dehumidification valve to maintain either the zone temperature (ZN-T) at set point (ZN-T-SP) or zone relative humidity (ZN-RH) at set point (ZN-RH-SP), whichever calls for more chilled water flow. The valve shall be modulated in sequence with the reheat valve and humidification valve as shown to avoid simultaneous cooling and reheating and simultaneous dehumidification and humidification. When this loop is disabled, the coil valve shall be closed.

It’s at this point that I’m going to navigate us into the weeds (just a little I promise).

In my experience, using a state-based sequence is one of the best ways to write HVAC control sequences. State-based sequences are those that have a series of states that are enabled/disabled and, based on these states the system(s), will do something. 

A very common example of state-based sequencing is the control of a reheat VAV. You are either in cooling, satisfied, or heating states. 

Now, at first glance, the complex sequence has the making of state-based sequencing. And that’s good, right? 

The problem lies in how complex the state triggers are. While you will not always be able to have a single state trigger, you should strive to keep the amount of state triggers low. In this case, we have ZN-T-SP (zone temperature set point) and ZN-RH-SP (zone relative humidity set point) and the respective outputs of their proportional integral derivative (PID) loops. 

I’ve used this exact sequence before and the problem is that the ZN-T and ZN-RH fight each other. While I understand the objective, you don’t want a low ZN-RH loop output to keep the ZN-T from getting too hot; this sequence is unnecessarily complex (especially in a VAV system). 

Ideally, we would let the dehumidification sequence control to return and discharge air relative humidity (RA-RH or DA-RH). An even more ideal approach would be to have the air-handling unit control all of this using internal logic from the embedded controls. 

Here’s the thing: A building automation programmer can effectively program this sequence. It’s not terribly difficult. But, after you and the BAS folks are done with the project, the building operator will have to run the building, and he or she now has a needlessly complex sequence with multiple variables. 

Additionally, the programming is no longer part of the embedded controls within the equipment, it is now part of a custom program inside a BAS controller. This means, in most cases, troubleshooting the system will require an on-site visit by a BAS technician.

Switching back from technical to operational, one of the things you must consider as a specifier is the level of skill and talent possessed by the building operator. If you are creating a specification for a major university with an in-house controls team, then, by all means, feel free to specify complex sequences. But if you are writing a specification for a school district or commercial office building, then simpler is better in most cases. 

In next month’s article, I’ll further examine the concept of state-based sequences and how you can structure your sequences so they are easier to program and troubleshoot. A side note, one thing I see a lot of design firms missing is collaboration between the owner and BAS contractor. Forward-thinking firms will work with two to three manufacturers of their choosing and will develop sequences the manufacturer will have a systems library for. This will reduce total design and install costs and will make for a compelling value proposition. More on this in future articles.  

 

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Phil zito 900x550

Phil Zito is the founder and CEO of Building Automation Monthly, an online building automation training provider. Prior to founding Building Automation Monthly, Zito led the technical integration program for Johnson Controls’ $250 million integration business. During his time in the controls industry, he has held roles in operations, sales, partner management, and engineering. Zito is the author of “Building Automation Systems A to Z” and has published more than 140 podcast episodes. Contact him at phil.zito@buildingautomationmonthly.com.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Commercial Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Phil Zito

    The Complexity and Simplicity of State Based Sequences

    See More
  • Phil Zito

    Simple or Complex Sequences?

    See More
  • Phil Zito

    Who's Responsible When Controls and BAS Are Both Present?

    See More

Related Products

See More Products
  • Digital Controls for HVAC Technicians

  • ghpm.png

    Gas Heating: Furnaces, Boilers, Controls, Components

See More Products

Events

View AllSubmit An Event
  • January 20, 2026

    The 2026 State of Home Services Marketing

    On Demand In this webinar, we will break down the findings from The State of Home Services Marketing Report based on our national surveys of homeowners and home services business leaders.
View AllSubmit An Event

Related Directories

  • iO HVAC Controls

    iO HVAC Controls is a heating, air conditioning and ventilation controls manufacturer that sells high quality, unique and contractor friendly zoning and specialty control solutions and offers them through wholesale distribution.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing