search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessCommercial HVAC

The 22nd-Century Manufacturer's Shop Drawing Submittal

By Howard McKew, P.E., C.P.E.
Tomorrow's Environment
May 2, 2018

More than a half a century has passed since I was fortunate enough to begin my HVAC career, and some things never changed. In particular, the way equipment manufacturers produce shop drawing submittals. Oh sure, some manufacturers will provide computer-aided drawings of the equipment, but basically, the submittal contains the same data as in years past along with the standard manufacturer’s O&M manuals.

Last month, I wrote about eliminating the contract document schedule sheet and combining all the pertinent information on a specific type of equipment into the HVAC section of the contract specification for decentralized HVAC systems. Well, what I’m going to suggest this month is applicable to decentralized or central HVAC systems. It is the 22nd-century shop drawing submittal format. I’m guessing no manufacturer is going to take my suggestion in this 21st century.

 

Shop Drawing Submittal

  • Cover sheet. Standardized template with the name of the project, client, contractor, etc.

  • Specification page from contract document. Cut and paste from the contract documents, as well as a cut and paste of the equipment schedule from the specification of contract drawing.

  • Manufacturer’s equipment page (size, capacity, specification). Standard equipment brochure edited to delete unrelated text for this particular piece of equipment for this project.

  • Manufacturer’s recommended piping detail. Cut and paste from the contract document detail sheet in lieu of using the manufacturer’s own piping detail because the design engineer will probably include additional valves and fitting beyond what the manufacturer would suggest (e.g., balancing valve, pressure/thermometer plug).

  • Manufacturer’s sheet metal detail. Cut and paste from contract document detail sheet in lieu of using the manufacturer’s own sheet metal detail because the design engineer may have additional sheet metal shown (e.g., outdoor air and return air mixing box configuration).

  • Manufacturer’s installation and access equipment detail. Using the manufacturer’s recommended mounting drawing, but include recommended area around the equipment for access, panel door swings, coil removal, seismic hangers, etc.

  • Manufacturer’s automatic control sequence of operation. Cut and paste the contract document automatic control sequence of operation noting what comes integral with the equipment and what is provided by others (e.g., electrical power and disconnect not included).

  • Manufacturer’s startup and shutdown checklist. Taken from the standard equipment brochure.

  • Manufacturer’s functional performance test (FPT) narrative/checklist. Cut and paste the contract document commissioning FPT narrative. Note: the equipment manufacturer should have its own FPT if the equipment is a self-contained unit such as a PTAC, fan coil unit, variable air valve, fan-powered box, etc.

  • Manufacturer’s troubleshooting checklist. Taken from the standard equipment brochure.

  • Manufacturer’s preventive maintenance work order. Taken from the standard equipment brochure but reorganized into a more formal preventive maintenance work order with standard safety precautions (e.g., lock-out, tag-out); tasks (e.g., remove filter, vacuum enclosure); task frequency (e.g., quarterly); and list of special tools needed to complete the work (e.g., Allen wrench, specific lubricant).

  • Manufacturer’s parts, material, and lubricants. Taken from the standard equipment brochure.

 

Now many, if not all, equipment manufacturers will say that all this information can be found in the standard equipment brochure and the associated operation and maintenance manual, but someone (e.g., the facility engineer) has to go searching for this information and then, after a lengthy review, what if the facility engineer doesn’t find all the information? What a waste of time and less than satisfactory results for this busy facility person.

My suggestion to the 22nd-century manufacturer of HVAC equipment is to hire a co-op engineering student for the summer and reorganize the manufacturer’s standard equipment submittal. When it comes to drafting a FPT for much of the equipment, the manufacturer already has a select few available sequences of operation to draw from, so why not “close the loop” with a select few FPTs to mirror them?

Think about it! How long will it take to complete a small group of standardized fan coil unit shop drawings to be available for use when the manufacturer is producing and selling millions of these terminal units? Seems like “short money” to achieve the above, and the manufacturer will be a century ahead of the competition.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Howard McKew is author of Integrated Project Delivery for Building Infrastructure Opportunities for HVAC consultants and mechanical contractors and can be reached at hmckew@bss-consultant.com or at www.buildingsmartsoftware.com. 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Tomorrow's Environment

    Passing the Quarter-Century Mark

    See More
  • Tomorrow's Environment

    Contract Specification and Contract Drawings – A Century of Inadequacy

    See More
  • Tomorrow's Environment

    A Half-Century Later

    See More

Related Products

See More Products
  • Uncomplicating The Heat Pump: Refrigeration & Air Flow Systems DVD

  • air came to a stop.jpg

    The Air Came to a Stop

See More Products

Related Directories

  • Shop Data Systems Inc. (Manufacturer)

    HVAC CAD/CAM software with extensive library, automatic nesting, on-site training, 24/7 telephone support, round and rectangle templates, Field Orders online, and over 30 years in the business.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing